2009, 08-05 Permit App: 09002369 AdditionProject Number: 09002369 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 8/5/2009 Page 1 of 2
Project Information:
Permit Use: RES ADD
Setbacks: Front
Contact: NICKOLS, RON & SHARON
Address: 602 N MAMER ST
C - S - Z: SPOKANE VALLEY, WA 99216
Left: Right: Rear: Phone: (509) 927-0215
Group Name:
Project Name:
Site Information:
Plat Key: 004527 Name: SP -0646-90
District: Nort
Parcel Number: 45154.0506 Block:
SiteAddress: 602 N MAMER ST
Location:: CSV
Zoning: R-3
Water District:
SF Res District
Lot:
Owner: Name: NICKOLS, RON & SHARON
Address: 602 N MAMER ST
SPOKANE VALLEY, WA 99216
Hold: ❑
Area: .00 Acres Width: 96 Depth: 279 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review
Building Plan Review
Released By:
Septic Sys Review
Originally Released: 8/4/2009 By: tmelbourn
Released By:
Sewer permit issued. 09-003690.
Originally Released: 8/3/2009 By: LHALSEY
Landuse/Zoning/HE Conditions
Permits: . _ ..
Operator: JD Printed By: JD
Released 13y:
Originally Released: 7/31/2009 By: mpalaniuk
Print Date: 8/5/2009
Project Number: 09002369 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 8/5/2009 Page 2 of 2
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
BASEMENT U R-3 VB 224 $3,360.00 224 $3,360.00
RES ADD R-3 VB 224 $21,689.92 224 $21,689.92
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Notes:
Payment Summary•,,,,,..,:..
Permit Type
Building Permit
Totals: 448 $25,049.92 448 $25,049.92
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount
$401.35
$4.50
$160.54
$566.39
Fee Amount Invoice Amount Amount Paid Amount Owing
$566.39 $566.39
$160.54 $405.85
$566.39 $566.39 $160.54 $405.85
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD
Print Date: 8/5/2009
Spokane
jValley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
,
PERMIT NUMBER: 7:CA
PERMIT FEE:
New Construction
Addition/Remodel
Other:
Accessory Bldg
Deck
SITE ADDRESS:
66). A. /44 ere t i2 d. 6P1, F- V%l(e y / t,.14 y'`! 216
ASSESSORS PARCEL NO: {5—I' 4 • Q Si -)(o
LEGAL DESCRIPTION:
Building Owner:
Name: 25,4 'J J 4gQ'M /tJ,c21 (C
Address: e,U;i �• 4 �e'�
City: SPo(ca��. 14-1144State: Zip:y?L(
Phone: S -VY cJZ 7 a 1/1"- Fax:
Contact Person
Name: /20M AS' c y 3 IS
Phone:
Sbl -22-3 - V9
Describe the scope of work in detail:
Contractor: N 1 A
DIMENSIONS:
0/1,4/6'
# OF STORIES:
z
Name: '_ Y"
1 ��e
��
MAIN FLOOR TO SCS
FTG: �) 7 4.00T(ad
2Nu FLOOR SQ. FTG:
'
Address:
IMPERVIOUS SURFACE
AREA: ,
/j,T
FINISHED BASEM NT
SQ. FTG: r1
City:
State:
Zip:
Phone:
Fax:
HEAT SOURCE:
' ha -
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project: $ 7, a y
i4-4 1 iU J
Proposed Use:
27 r / n,5 (20,),,A
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
1q•6„
DIMENSIONS:
0/1,4/6'
# OF STORIES:
z
TOTALHABITABLE SPACE:
MAIN FLOOR TO SCS
FTG: �) 7 4.00T(ad
2Nu FLOOR SQ. FTG:
'
UNFIN BASEMENT SQ. FTG.
�i j a
" 7 k0�?iT„J�
IMPERVIOUS SURFACE
AREA: ,
/j,T
FINISHED BASEM NT
SQ. FTG: r1
GARAGE $Q. FTG:
tif 4
DECK/COV PATIO SQ. FTG:
/'i/R
30% SLOPES ON
P RTY: P.(4
# OF BEDROOMS:
/
CONSTRUCTION TYPE:
CI)" .
HEAT SOURCE:
' ha -
EWOR SEPTIC? )
The
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be clone
in full compliance with the City of Sp ane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5); is Ci of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances..0 Plans :r aiditional information may be required to be submitted, and subsequently approved before
this application can be process/ed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2115/07
❑ Check
❑ Mastercard
Expires:
DATE: 74/ /6 7
❑ VISA
VIN#:
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
riProperty lines and dimensions
el Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
a Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
�L] Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
Footing sizes and locations
a Perimeter concrete foundation wall sizes
b Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
Eir-Floor Joist direction, size and spacing ❑ Window and door location and sizes
u Header, beam or concrete lintel sizes o Window well locations if applicable
o Brace wall panel locations o Room usage labels
a -Water heater and furnace locations ❑ Smoke detector locations
0 -Exhaust fan locations o Attic and crawl space access locations
o Deck or concrete patio sizes and locations o Fire Wall construction
O Roof Plan:
Engineered truss direction and spacing
Rafter and over frame direction, size and spacing
O Wall Section Detail including:
Roof
❑ Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
O Stairway tread rise & run and nosing
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
❑ Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
SaokanValley®�
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE —APPLICANT PINK — BUILDING FILE REV 9/07
(002 hl- Mm41E.K RD.
.S?oKAtaE )I1\11Ey, Vdl\ °1°12\6
pazcEL# LLS)Sq.05o�
TOTAL Lo -1
35'
SNG ' S(T [3 Ack
FRoA
FIDuS E
Iqi
135'
16'
15'
',JEW
� oD�i► WJ
110
3k -OP
LID. XLO'
1,�uo So FT
SINC LC .5To Z
1
2
5'
CANNING DEPT. APPROVE
5\7"-z- PLnr�
SS
1
-7/31/zap
IISi
/GfT. I6:
SEPrre To 3E
12EMOUE,il %irettt4
l3PtEMm,r c-scuvnnonl
3y'
E -X% vriNc 1o'5E
11100 S(LrT 1 TAL
DRIVEWAY
qG 08'
1
SHE o
2 (9 So FT
Sti14GAE
SToR4
CID
1B'
SN -p St -1 6 ACK -
FQo M NOOSE.
--S�wER LtwE-
2`19. b'