Loading...
2013, 09-03 Permit: SW-13001545 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001545 Permit Issued Date: 09/03/2013 Expiration Date: 09/03/2014 Project Description: Primary Contact: Phone: SEWER ABANDONMENT & CONNECTION T 5 A CONSTRUCTION 208-773-4417 Applicant: T S A CONSTRUCTION Address: 6230 S STATELINE RD POST FALLS, ID 83854 Phone. 208-773-4417 Email. SITE INFORMATION: Site Address: Parcel Number: 922 N MAMER RD 45151.1804 Assessor's Description: VERA TR D OF SP 87-493 IN NE1/4 AUDITORS #8812020223 Inspection Area: (509)-477-3675 Owner: Address. Phone: Email' HOBBS, JUDEAN F 922 N MAMER RD SPOKANE, WA 99216-1108 Water District: Vera Irrigation District #15 Fire District Spokane Valley Fire Zoning: Land Area: 16558 Square Feet CONTRACTOR INFORMATION: TSACO"099LE, Exp. 06/09/2015 T S A CONSTRUCTION 6230 S STATELINE RD POST FALLS, ID 83854 208-773-4417 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 $125.00 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed: 09/03/2013 11:34:58 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001545 Permit Issued Date 09/03/2013 Expiration Date: 09/03/2014 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 09103/2013 11:34'58 Project Coordinator: Kathy Cummings Sep 04 13 03:17p Rob's Demolition 09/03/2013 14:51 5099277861 UPS STORE 7-3-4 4;4.577 509-534-9404 p.5 PAGE 01/01 t‘i Lk SPOKANE COUNTY UTILITIES PERMIT Application Number. SW -13001545 Permit Issued Date: 091D3/2013 Expiration Date: 09/03/2014 Project Description: SEWER ABANDONMENT & CONNECTION Primary Contact T SA CONSTRUCTION Phone: 208-773.4417 Applicant: T 3 A CONSTRUCTION Address: 6230 S STATELINE RD POST FALLS. ID 83854 Phone: 209-773-4417 Email: SITE tNFORMATtON: Site Address: Parcel Number. 922 N MAMER RD 45151.1804 Owner. HOBBS, JUDEAN F Address: 922 N MAMER RO SPOKANE, WA99216-1108 Phone: Assessor's Description: VERA TR D OF SP 87-493 IN NE1/4 AUDITORS Email: 48812020223 Inspection Area: : (5G9)-477-3675 Water District: Vera Irrigation District 415 Fire District: Spokane Valley Fire Zoning: Land Area: 16558 Square Feel CONTRACTOR INFORMATION: TSACO"099LE, Exp. 08/09/2015 T S A CONSTRUCTION 6230 5 STATELINE RC POST FALLS, ID 83854 298-773-4417 DETAILS - class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 5125.00 $125.00 FEE DETAIL. Processing - Utilities Utilities Permit Total Fee: $26.32 $125.0o 5151.32 CONDITIONS. Inside Public Transit Benefit Area t Plan review fee is required for ell site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG–AT LEAST 2 WORKING DAYS IN ADVANCE. sPpratECOUNTY ODE REQUIRES TWE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & _NDUSTRIESr-IN UOING THOSE' LI RELATED TO TRENCH SAFETY. _________---------�. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL TI -{E UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING OAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER 1S RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER 15 TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. $125.00 Project# 3L2 4 k(3— 1775 RECEIVED SEP 0 5 2013 CSV PERMIT CENTER Data Pentad: 091932013 11:34:55 Project Coortrinabr. Kathy Cummlrga t