Loading...
1994, 06-15 Correction NoticeADDRESS: fT P-2- CORRECTION NOTICE SPOKANE COUNTY DEPARTMENT OF BUILDINGS PROJECT NO.: 9�/' DATE: The items listed must be corrected and inspected prior to proceeding. Failure to do so may result in additional fees being assessed. Please call for reinspection when corrections have been completed. 2,W 5 77 ,AREA - /r SPOKANE COUNTY NOTICE OF INSPECTION PROPERTY ADDRESS: PROJECT NO. OWNER f�I f TrJst CONTRACTOR INSPECTION TYPE: T WORK LISTED ABOVE HAS BEEN: APPROVED REJECTED NOTES: BY: STEVE HOLY6� INSPECTOR DATE QUESTIONS? CALL OUR OFFICE: DIVISION OF BUILDINGS (509)456-3675 CALLED IN: DATE TIME ///I/yy � l A�w e ✓ems i Aq�e,, Q., /. .5-e,1 OS- D r A r r. © .'' S lNS a� alelgLia " G For further information call Inspector: 0-Af% ARA --A A. A!► ARA ...... t..d.. — at 456-3675 between the hours of ,7 -VW 2,W 5 77 ,AREA - /r SPOKANE COUNTY NOTICE OF INSPECTION PROPERTY ADDRESS: PROJECT NO. OWNER f�I f TrJst CONTRACTOR INSPECTION TYPE: T WORK LISTED ABOVE HAS BEEN: APPROVED REJECTED NOTES: BY: STEVE HOLY6� INSPECTOR DATE QUESTIONS? CALL OUR OFFICE: DIVISION OF BUILDINGS (509)456-3675 CALLED IN: DATE TIME ///I/yy � ADDRESS: 1,709 9' J,2VI r 68/, J) i PROJECT NO.: / l— j"y/, CORRECTION NOTICE DATE: SPOKANE COUNTY DEPARTMENT OF BUILDINGS The items listed must be corrected and inspected prior to proceeding. Failure to do so may result in additional fees being assessed. Please call for reinspection when corrections have been completed. %O✓! e rlr h (J r r G P f• 7e Y t /4J j��21,ZZ t / rr 7 30 �c For further information call Inspector: at 456-3675 between the hours of 8:00 AM and 9:00 AM weekdays. 7-7— AREA AREA S� eje SPOKANECOUNTY NOTICE OF INSPECTION PROPERTY ADDRESS: 120 i3 /z0/_r- l e�4-,T PROJECT NO. -7( " OWN ER t �r f Tc'✓s f" CONTRACTOR INSPECTION TYP WORK LISTED ABOVE HAS BEEN: APPROVED REJECTED NOTES: BYSTEEvE "OLYK Vis: INSPECTOR DATE QUESTIONS? CALL OUR OFFICE: DIVISION OF BUILDINGS (509) 456-3675 CALLED IN: DATE TIME .1/3/7y /P^ Z3 Amit A< -r -1w zj,*14-0 PRIG._Z. Ar Vd,rs b G 018c- ZY FkA D-0-rc 9A.,er 5-W 44hdf- 17-00? t" T-1 —')V ell A, (I M J 214 - r3 V A-12 N -4- rpfo 01_0414,1 rot., C_ V4 X', arc-" to -2- c9 4U -)a L12XV e-4 T_�AAM � P I " 7- ......... I ......... . _ _77F -7 I eg lli INSPECTIONS CALL 456-3675 V ol RAEAqHSTAGE OF COPSTRUCTION MUST \Q) CTIONS CALLED FOR: VN 1. Footings and F &7PO� oundationprior to pouring concrete. 2. Framing t_12Y 3. Plumbing ou S\ rough -in below and above ground vo� a. 1P 141PPEP M AT (water or air test) -pt� -kv, b. final inspection j CIP I--- Y -e r2 4. Heating System rveql� "e, revv(5 A. GAS L_j a. rough -in and pressure test b. final inspection R. ALL OTHERS (oil, Coal, Etc.1 rou&,-in or--- A )-1 10, e- fAtA�4� 11 vcN P-at/o b. final inspection 5. F4 F, nal Inspection (Overalli ov, OCCUPANCY Vy L-4 -7 A)6- 1,0 V1 6 1 VLJ STOP t),9Ae- f:�a, tdyl e_lr_� ICA' -S rj ,.A, rlj-r6•✓,0 �,o PZ 5- re) id a 0,e e 0 /Z x44 ed dif A: hIA5 arW",n16- 7-,9 Qu 2 - THESE 1?7�N§ HAVE BEEN REVIEWED BY --- xt, ON x$ M "I q?j — 4710 CL X, RE; ARCHITECT e� SMITH OF SH GTOJJ