Loading...
2008, 04-07 Permit: 08001143 SewerSPOKANE Coin SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 1506 N MAMER RD Parcel Number: 45151.2502 Subdivision: RANGE Block: Lot: Zoning: Owner: MCGUIRE, LARRY R & PAMELA L Address: 19606 PHEASANT DR GREENACRES, WA 99016 Building Inspector: Water Dist: VERA Project Number: 08001443 Inv: 1 Issue Date: 4/7/2008 Permit Use: SEWER CONNECTION - MAMER MEADOWS Applicant: VISTA CONSTRUCTION & DEV 3420 N TSCIIIRLEY RD SPOKANE, WA 99216 Phone: (509) 926-2243 Contact: VISTA CONSTRUCTION & DEV 3420 N TSCFIIRLEY RD SPOKANE, WA 99216 Phone: (509) 926-2243 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: 1 Permits Richt of U'ar Contractor: UNKNOWN License#: UNKNOWN CONST IN ROW -SEWER 1 $1000 Total Permit Fee: $10.00 FOR RIGHT OF WAY INSPECTIONS CALL THE ENGINEERING DEPT AT (509) 477-3600. Sewer Connection Permit Iii Contractor: VISTA CONSTRUCTION d DEVELOPME License #: VISTACD999DE SEWER CONNECTION I' I 1, t $85 00 PROCESSING FEE 1 $15 00 ' Total Permit Fee: $100.00 FOR SEWER INSPECTIONS CALL THE UTIEIT1ES DEPT AT -(509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR' TO COVER. ONE WORKING DAY NOTICE REQUIRED PERMITALLOWS FORA 30. -MINUTE INSPECTION ADDITIONAL INSPECTION FEES APPLY AI''TER 30 MINU'CES.^.,;__ — b _ ` _�'-r- _ DIE INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY 13E REQUIRED TO PERFORM TESTS FOR VERIFICATION: INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWERSTUI3 PRIOR TOTiANY,OTIIERTEXCAVATION. Wrl Ip-. �) \\IV• N n L.1 -1 \\I u SEWER STUBS ARE TO BE CHECKED PRIORLTO CONNECTION=t0iENSUREjTHAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM TI IE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT TIIE J013 SITE AT THE SCHEDULED INSPECTION TIME. 130T11 STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION To OWNERS OF UNDERGROUND FACILITIES. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WATT ALL REQUIREMENTS OF THE WA STA'T'E DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Processed By: Hargrove, Heidi Printed By: HINTZ, FAITH Page 1 of 2 PERMIT 0 FILE NOTICE It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to 'request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes. NOTE: This inspection includes review of the structures setbacks from property lines Minimum setbacks are established by County zoning regulations. Front, Flanking, side and rear yard setbacks are measured from property lines. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/ curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3 FRAMING - after all framing, bracing and blocking is in place, plumbing, mechanical rough -in inspections have been approved, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough -in, before covering, and final 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access, on-site drainage ('208 swales'), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. 8 MANUFACTURED HOMES - In addition to Foundation inspections prior to pouring pads, inspection of blocking, tie -downs, stairs, handrails, skirting, etc., installations when completed per manufacturers installation instructions; Final inspection approval prior to occupancy: completed Wains Tag(s) must be affixed to the home and completed inspection record card and manufacturers installation instructions must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Department of Building & Planning 477-3675 • Construction in a flood plain, Division of Engineering & Roads 477-3600 • Electrical wiring, State Department of Labor and Industries 324-2640 • On-site waste disposal system, Spokane Regional Health District 324-1560 • Road cuts for utilities or driveways, Division of Engineering & Roads - 48-HOUR NOTICE REQUIRED 477-3600 or State Department of Transportation 456-3000 • Sewer connection, Division of Utilities 477-3604 or City Public Works Department 625-6300 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, building, plumbing, fire and mechanical permits will be considered null and void by limitation if the work authorized by the permit is not commenced within 180 days oris stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. Please call 1 you have any questions concerning the validity of your permit. Please contact the other agencies with respect to their refund policy on all other permit types. All requests for building permit refunds must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Building and Planning at the below address. 11, si x ait,aa ;:x4 € _. Spokane County Department of Building & Planning 1026 West Broadwav Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133 REVISED 06/07 BLDG PERMIT SPOKA11£ COUNTY SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 1506 N MAMER RD SPOKANE VALLEY, WA Parcel Number: 45151.2502 Project Number: 08001443 Inv: I Issue Date: 4/7/2008 Permit Use: SI3WER CONNECTION - MAMER MEADOWS Permits Payment Summary Total Fees AmountPaid AmountOwing $110.00 $110.00 $0.00 Tran Date Receipt # Payment Amt 4/7/2008 1296 $1I0.00 Processed By: I largrove. Heidi Printed By: I IINTZ. FAITH Page 2 of 2 PERMIT NOTICE It is the responsibility of the applicant/permittee to see to it that;he use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to requ4st inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations Front, flanking, side and rear yard setbacks are measured from property lines. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/ curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2 FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, plumbing, mechanical rough -in inspections have been approved, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use Please provide 24 hours notice. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - In addition to Foundation inspections prior to pouring pads, inspection of blocking, tie -downs, stairs, handrails, skirting, etc., installations when completed per manufacturers installation instructions; Final inspection approval prior to occupancy: completed Wains Tag(s) must be affixed to the home and completed inspection record card and manufacturers installation instructions must be available on site. 9. SEWERS - prior to cover 10 RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover Check with the department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Department of Building & Planning 477-3675 • Construction in a flood plain, Division of Engineering & Roads 477-3600 • Electrical wiring, State Department of Labor and Industries 324-2640 • On-site waste disposal system, Spokane Regional Health District 324-1560 • Road cuts for utilities or driveways, Division of Engineering & Roads - 48-HOUR NOTICE REQUIRED 477-3600 or State Department of Transportation 456-3000 • Sewer connection, Division of Utilities 477-3604 or City Public Works Department 625-6300 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, building, plumbing, fire and mechanical permits will be considered null and void by limitation if the work authorized by the permit is not commenced within 180 days or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. Please call if you have any questions concerning the validity of your permit. Please contact the other agencies with respect to their refund policy on all other permit types. All requests for building permit refunds must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Building and Planning at the below address. Spokane County Department of Building & Planning 1026 West Broadway Avenue Spokane. WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD. (509) 477-7133 REVISED 06/07 BLDG PERNIIT