2010, 04-27 Permit App: 10001156 GarageProject Number: 10001156 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/27/2010 Page 1 of 2
Project Information:
Permit Use: 24 X 24 X 12 GARAGE/STORAGE Contact: SPOKANE POST FRAME
Address: 7001 E 2ND
C - S - Z: SPOKANE, WA 99212
Setbacks: Front Left: Right: Rear: Phone: (509) 926-0865
Group Name:
Site Information: Project Name:
Plat Key: 002755 Name: VERA
District: Nort
Parcel Number: 45151.0704 Block:
SiteAddress: 1521 N MAMER RD
Location:: CSV
Zoning: R-3 SF Res District
Water District: 010 VERA
Lot:
Owner: Name: MARTINEZ, MARTY
Address: 1521 N MAMER RD
SPOKANE VALLEY, WA 99216
Hold: ❑
Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 40
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 4/26/2010 By: tmelbourn
Landuse/Zoning/HE Conditions
Pernits:
Released By:
Originally Released: 4/27/2010 By: cjjanssen
Operator: jmm Printed By: JD
Print Date: 4/27/2010
• Project Number: 10001156 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/27/2010 Page 2 of 2
Building Permit
Contractor: SPOKANE POST FRAME Firm: SPOKANE POST FRAME
Address: 7001 E 2ND AVE Phone: (509) 926-0865
SPOKANE, WA 99212
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
POLE BDLG U-1 VB PLAN 576 $10,944.00 576 $10,944.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Totals: 576 $10,944.00 576 $10,944.00
Units Unit Desc Fee Amount
1 SELECT $195.25
1 SELECT $48.81
1 SELECT $4.50
Permit Total Fees: $248.56
Notes:
Payment Summary:. --
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $248.56 $248.56 $48.81 $199.75
$248.56 $248.56 $48.81 $199.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD
Print Date: 4/27/2010
P2
Spollan�a e.1;10"�
Valley
Permit Center
11703 E Sprague Ave, Suite B-
Spokan
(509)68:-0036
www.s kane
Community Development
Residential Construct
Permit Application
g
t
,ay.ro8�Of13
:WIT CENTER
on
Project
1, •aarne
wC
..dditio
PERMIT NUM /1 %(p
PERMIT Fl
struction U Accessory Bldg
/Remodel n Deck
SITE ADDRESS:
5
ASSESSORS PARCEL NO: /5"/S7- D76 '1 LEGAL DESCRIPTION:
:Buili!iu'Awuer•. ,.,I4,. .w=•„ _=;,r,;
:t,:...:.t:Y e.t,.k:.-s: a,'t.��_,>''- rI
:Contractoi:Cx`4x _ ...�;. 4.a-- .t,�,` '..` ;`': - �:.1;� m
,.3.,-.��.r-..a... .,..,...._
Name: wit Raicva .
Name: � >' edS fi�Yl't
Address: 70D t E -72%`.3s_ f
Address: `c,�1 N. main tC
City:5,061m_ L �(/,, ®er - State:j Zip;( • � ,
�r
City: d C State: ttet • Zip9ggL
Phone:tv6 _06/2-•
0 5 Fax: 14 _Vet
I
Phone: eng Ls-"!'. ti Fax:
Y'�•!
FINISHED BASEMENT
SQ. FTG:
Contractor Lic No: Date:
�llE3 c'i
Contact.Pers/�on�j"`.- 4,.: ,-�,,>.,;� r;-,'>,.yr',:•.::,a-:.. +�'. _^
30% SLOPES ON
PROPERTY:
.PO�'�Frl
City Business Lic. No:
CONSTRVION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
Name:-\ e“- -' - a; heittii •
Phone: i] Q -s-9-6 3
Describe the scope of work in detail:
94 XLq lit CiSe-1.S •rcn1 t
Proposed Use: .511)44-riC /6012/7,L
Cost of Project: $ ,a3
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAIK:,,
DIMEy XZ
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2"" FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG:_,DECK/COV.
574, OF--
PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRVION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) • - • •r additional information may be required to be submitted, and subsequently approved before
this application can •_esse..
4;/1/ 3/ a
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 7115/07
[k Check
❑ Mastercard
Expires:
DATE:
❑ VISA
VIN#:
RESIDENTIAL CHECK LIST DIRECTIONS:.
;13 - ---..
Place a check mark in box next to each document required for, complete submittal.
1 iyl6 1
❑ SITE PLAN j "11:
o Property lines and dimensions ! ------ --- _ o Setbacksto property lines
o Direction arrow pointing North and orientation'to streets ❑ Distance between buildings
o Proposed/existing buildings (footprint and -dimensions) 0 Right of way/easement location & sizes
o Utilities, septic tank/drain field locations and distances o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
❑ Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
❑ Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing
❑ Header, beam or concrete lintel sizes
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
o Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
❑ Size
Radon
o Passive system with Emil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
O Stairway tread rise & run and nosing
o Window and door location and sizes
o Window well locations if applicable
o Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location •
o Truss or rafter size spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
❑ Reinforcement if any
❑ Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
Spokane
Vailey®-
For
City Use Only •
PLUS Project Number /C>//S7Tp-
Project:Address /507/ • // of/Gr-/u-c✓'
11703 E Sprague Ave Suite -B-3 • Spokane Valley WA.99206: •-.•
509.688.0036 1 Fax: 5091688.003i* permitcenter@spokanevalley.org-'
•
•
As part of our: on-going commitment to. customer 'service during_ the review process;`of'your , project
application,we are providing you`with a TARGET DATE for .the initial technical application",reyiew: lf•for:
any reason we cannot meet this date; 'we will contaet•you with a'revised target; date.: ' ` , •'
Your application review TARGET DATE•is
'The TARGET DATE is the date we 'estimate your project, application will have had its' initial, technical
review. It is not the ,date for; approvalor permiti,ssuance:
Tilis for a Smoother Projec
Ajaplication Review.'!
Submit complete, accurate plans'and'documents. , •
/1.11'0 time may he'/;quired,'far..re-stihml
iltals'asojeci application`/eriewe1.ci.s61,L on iniallip/e'appliciti'ons amid id:
mar he sereno/ dors before they c•rrin look in ;our nem, or revised infor for/71(11)0;i' ,
%' Desi_ntite a specific contact person:to communicate with the City..
6i'hile the person designated as the applicant's contact person with the Citi •rain he hanged one "individual 11111; the
erperiisc'for cleating 11th'/ erieirer cpmments mould he the best choice for the (/71/) ei ei'ieii!p/'bcess.
•
Call staff regarding the status of your project only/after the target date shown at the top of the page.
Although you .shook/ be contacted oit: ur hr g
the lcuet date, please ftel li ee.10 conlac1 u.s;i/.roin haven t /reard from us
hr nom tinged dente. Staff /11(11- contact you hejm•e the target date- if the initial itVIC1I is iv. tele. dos• .
procedure, you will save 1inie'and allow the reviewers to complete ihe:woi•k /none e.rlreditiously,
Steps in the Permit Process -
1, Counter Complete. Your application- has, been accepted:'as,counter•coniplcte, This.' Means all of the„required.:, •
documents, as indicated on your Pre -Application, Checklist have beewsubmitted : or • have; been i appiosied.. for , deterred. ;
submittal. This docs not prevent technical stall: from requesting additional: inlorniation as a'result of their.technteal review::•
2, Quality Check. The next step in the proccss.is a quality check, tomakc'sure''thatthc.application i'•reviesvable,and'free
•
from substanti\•e.1laws iliac WollIMprevent technical stat T, licinl'cotilpleting the.technical review Mice', it is "slanted. When
this step is complete, - • •• ” 'and - their-
comes up for review..,
3. Technical Compliance. Once an application is adnunistragvely complete; it. is routed to. technical staff for compliance :. .
review. Depending on the type of project,' technical staff 011) include multiple reviewers? You' should he• contacted' by; •
phone, fax, email, or mail by•your TARGET DATE once the initial technical compliance revie s is complete: ; '...
•
4, Permit Issuance,, When the technical compliance review of thea ipplication?ts'.coniplete„including anysubsequentre- ••
•
submittals, each reviewer will approve their section of the application and 'route,it, to the Permit'Center: When alt sections ':
of the application are received, a Permit Specialist will process the application and' contact the"personspecified on your
application for permit pick-up. Information regarding 1ees,and pre -construction Meetings (if required),will be, provided:by
•
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE
REV 9/07
March 24, 2010
1586 N. Mammer, City of Spokane Valley.
I am requesting a paving waver to build a 24'x 24 'pole building to store a trailer and 4
wheeler as well as other household items . I would like to put gravel or asphalt grindings
down instead. This building will not be accessed on a regular basis.
Michael Harvey
SPOKANE POST FRAME, INC.
Engineered Pole Buildings
shops
garages
storage buildings
cabins
kits -cost plus
7001 E 2nd Ave
Spokane. -WA 99=12•
ROLFE WILL
Sales Manager - Owner
509-926-0865 • Fax 509-924-5161
or 1466.926.0865
41
Step
VISIT us at
www.spokanepostfrarne.com
`Thow
North
V PERMIT CENTER
APR 2 0.2010
.,ne
.!bmtttat #`�
•
Show streets/alley
Show septic/sewer/drain( le Id
Show existing buildings
Show proposed building
Show setbacks - front, rear, sides.
Show lot size
ZONING CRITERIA - SPOKANE
tea
*MSS C
��++
916
ION
t c loser than 5' to property I Ine - need firewall and parapet
( ,t of rear 30" and closer than 5' - need waiver from neighbor
Can't cover more than 50R of rear 25'
Corner lot - building must be 20' from property line
SAT minimum setback from front property line
l sss than 8' from residence - need firewall
i xlmum sduare footage - 10* of lot area (Must be less than 3.000 Kt It.)
1 ay not subdivide lot so that building is more than 10R of residual M area
SS2iln1y
I' closer than 5' to property line - need f Irewal I
10 from septic/drainfield
less than 6' from residence - need fIrewall
ULU& SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE B )0K
/ND KNOW WHAT ZONING YOU'RE IN TO 8E SURE. MAXIMUM BUILDING 5 ZE
ALSO CHANGES WITH DIFFERENT ZONING.
minimum side yard setback
5 minimum rear yard setback
minimum front and side street setback - 25' from -property Ilne or 55 from
center of road - whichever IS greater
v
PLANNING DEPT. APPROVED
BY. JL L2
4193110
1
e
cl
2c;'
A
E
r-. z 2913, East61 Cdurt
Daniel Waritbekk Pik; 'tSpOkatie'•WA"99223',:
4-4 ' ' • Telephone::509-443L6186: • Fat,509.440582 • eliaciliskaerisefboai ;
, . .
------------------------------
SPOKANEPOSTFRAME INC '- —
"" • " ' '.;`1 ;
• :4-Apri114; - T 'LL r •
SUBJECT H' 24' X-24"irti2' POST FRAME BUILDING FOR MIKE HARVEY 1521 N. MAMEK, SPOKANE
".+VACLEcs-,WA99216, r-
This,pOSC fearneEcbuiiding was Sold 4411 be 'erdpted for ‘Mr:' Haryey, in Spokane Valley, WA esing• the standard post
frame buildingiplenS71:have- prepared for Spokane Post .Prathe,c:InC:;:for:30 ,PSF.- live • load,- 90 MPH , wind ''Soiledc`!,: ',:-.,'.• '1
, ., •-, ',;•
Exposure B, SeisiiiicDesign,Categery:C and 1;506' PSF• allowable soil bearing' presSure,,IBC-2006:POsts-‘ are
I. -.....y„ .."- located g'"12' o.'p. andsta&roothaS a'4:12,Oitch thisSes., ':',.„. :.-„T- ::, ., r. ; ,?' ..::. ,•%, ,, . ,C , ' ''' ; ' : , ' T . „ , k : ' ,' 1 1 -; r '', .',.., A'‘.1
1 have reVielliedibedeSton-cithia building and che4eiiiifoi:the.06iii.OatnOeign criteria used, in the standard olanftz,
design.'ThelrOPtheridirall has a 1-0!xl0. overhead door. There ia'Sliffi. cleht:steel:,shetating on this endw all to transfer
lateral loads an the Sideway and roof 46 the base the truildirig.-c-,
i • .: ;ti:elre;ePcii:4all-beS;a94pet.'rUr9ga'7111±ereiS'Sufficientf Steel sheeting' on this endwali (AL , . ,.., r..
, ; . • , . .` .% : ' hi. .'; ,?. , t , c: :: ' ; •,: . ' to transfer lateral loads - imposed:::
foundations ., • : '. ' ),I',,I -.– -,--, - ,.", . I
on the roof andv.4001,4h! post .,„:i^
The': lett1i id- e yv b.:Ii:- has .;;;IliaSa.cirolf-and i2.4iride4: The? right' sidevrall: has, 99L openings.- Sid :.._-.' ll,ogealegs;d:otiit;-,.....,-,:44-;::
ffecitheliteral load resistance of P-,, - -..:.--,,,..i;:?' ' ----- ., .-. 1.1... , F,-',`,
6 ' Wilding ' . l' : : '. ? ..4; r:- :::::t-:: ',..; :.„...':, '' ' :'..' '. ... . '''';
‘..1 ' ..;: beildiitgOlariaier all thefraraingdet, a,11-s:for.thiatbuiidingiH-,_ _,,, -h
;'‘;:c°- -.:1' ri .? ::''''CL t-atiot•Y‘' nieif ytOul lieVelranYadditi'Obal*ipthiOp€ thiiii... t,tii,7ig-.7 79f this building., ,,:,
(...:?-...: - - PneereiY7,'?..k.''..1
14 •
- - • . :,-',-*.-..?, :W.f!,-:`, ,-,,,,--:t ,C.1:'..,;:f ,-:...T'..-/:-:::::';:t.: 'Y'.. Lr- --.S.';''''-'''- ::2 '.'' '' 4::: '''''''''
,... ... A
... •
e I,
.. • i . ,
Daniel Wainbck. P.E. r. ",,.,—, z .,yLL : . r
. i
4-1
c,”. , ; r '
:
: '
------------------
;'"•- : : , : T'; •
, -
' '•
" a1; • *•"
C:J "1V.:1"C:trL
• t'L:1,:g: t ;;.:
'r.r;
..
•
-pftriesfgher ot-S. mall Stivatures,4 post Frame Buildings, Foundall°PSystems,..
Light Gauge Steel Framrnq,and Gram Storae
rt•I; •_,
'11-.1f; 1
• cf-,
• ,• tr„ • 4- • . - . ,
•
1' 4 ;
"i • R..2
A 1 r !tr..
• —1,-L
••• ;•
• .4 szc- • sf'd1••••?;...,4., •
• ' • _ - -
‘„ 4: :7211g19:?trc
Cr.?
• .ffrr.'1; 't
-7„16,Aeto -
' - • "a, "A. 17.'""
•