2011, 07-01 Permit App: 11001955 Finish BasementProject Number: 11001955 Inv:, /
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/1/2011 Page 1 of2
Project Information:
Permit Use: FINISH BASEMENT
Setbacks: Front
Site Information:
Plat Key:
Left: Right:
Name: Range
Rear:
Contact: SYMONENKO, OLGA & VYACHESCAR
Address. 1008 S MAMER
C - S - Z: SPOKANE VALLEY, WA 99216
Phone: (509) 928-9476
Group Name:
Project Name:
District: Sout
Parcel Number: 45224.4602 Block:
SiteAddress: 1008 S MAMER RD
Location:: CSV
Zoning: R-4 SF Res
Water District: 010 VERA
Area: 8,525 Sq Ft
Nbr of Bldgs: 0 Nbr of
Review Information:
Urban District
Width: 0
Dwellings: 0
Lot:
Owner: Nance: SYMONENKO, OLCA & VYACHES
Address: 1008 S MAMER
SPOKANE VALLEY, WA 99216
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
13uilding flan Review
Permits:
Released 13y:
Originally Released:
7/1/2011 By: tmelhourn
Contractor OWNER
Description Grp Type
13ASEMENT R R-3 VB
Item Description
RESIDENTIAL PERMIT FEE
WSI3CC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Operator: jmm
Building Permit
Finn: OWNER
Phone:
(000) 000-0000
This Application:
Notes Sq Ft Valuation
PLAN 1.365 56.825.00
REVIEW
FEE
Total Project:
Sy Ft Valuation
1,365 $6,825.00
Totals: 1365 $6.825.00 1.365 $6,825.00
Units Unit Desc
I SELECT
I SELECT
I SELECT
Printed By: .11)
Fee Amount
$139.25
$4.50
$55.70
Permit Total Fees: $199.45
Print Date:
7/1/2011
Project Number: 1100/955 Inv: 1
Notes:
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/1/2011 Page 2 of 2
ADMINSTRATIVE EXCEPTION (ADE -09-07) APPROVED FOR LOTS 1-4 BLOCK 1 AND LOTS
1-4 BLOCK 2 OF MAMER PLACE.MINIMUM FRONTAGE OF 60 FEET IS ALLOWED -MI -I
Payment Summary:
Pc nnit'rype
Building Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$199.45 $199.45 $55.70 $143.75
$199.45 $199.45 $55.70 $143.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to he a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: .ID
Print Date: 7/1/2011
?CINI
1 rA, GENCommunity Development Department
fi Per i enter
t 17 East Sprague Avenue, Suite B-3
Scryo i y� y e Vall y, WA 99206
py` Y,te�"' ��Tel: (509) 686-0036
Fax::4509)68 -0037
permitcenter sooka nevalley.orq
ICVa1
0/
t��
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
❑� NEW CONSTRUCTION 0 ADDITION/REMODEL
Di DECK / 0 OTHER
SITE ADDRESS: /OO8 S' A61.407e '-
ACCESSORY BUILDING
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME:
NAME: e/// Q :',�(/inone.nh)
/0
ADDRESS: 0 (p /'
8 Lamar
CITY: (/ '04a
tar/a�f/C./C%e STATE: t(it
PHONE: 9— 9p(. G 9 7 . ✓ FAX: CELL:
CONTACT NAME: 0/
ZIP: 992LC
PHONE:.4799- gg 5 "!J - O/
FAX: CELL:
CONTRACTOR NAME:
MAILING ADDRESS:
CITY:
STATE: ZIP:
PHONE:
FAX: CELL:
CONTRACTOR LICENSE NO.:
EXPIRES: CITY BUSINESS LICENSE NO.:
ESC IBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
>24 --fit 802 e m,e-
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:
Dimensions:
No. of Stories:
Total Habitable
Space:
Main Floor SQ FT:
Upper Floor SQ FT:
Unfinished Basement SQ 'y<Finish!d,�pemen�
FT:
SQ�S
FT: yylF�J
Garage SQ FT:
Deck/Covered Patio SQ
FT:
Impervious Surface
Area:
30% Slopes on
Property:
No. of Bedrooms:
Construction Type:
Heat Source:
Sewer or Septic:
‘OTAL COST OF PROJECT: $ 7(? 000 nac
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature
Date: 0 /D////
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_ _Residential_ 11-11-11.doc
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
❑ Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
O Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing
o Header, beam or concrete lintel sizes
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
❑ Deck or concrete patio sizes and locations
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
❑ Size
Radon
o Passive system with Emil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
o W inddw and door location and sizes
o Window well locations if applicable
o Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
Stiokane
4•00Valley®
Target Date sheet
For City Use Only
PLUS Project / / —/ V 6 -3 -
Project Address MD » Sit it -Ott
11703 E Sprague Ave Suite B-3 t Spokane Valley WA 99206
509.720-5240 1 Fax: 509.688.0037 1 permitcenter®spokanevatley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is / 18
The TARGET DATE is the date we estimate your project application will have had its initial technical review. 17 is
not the date for approval or perinit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on nut/tiple applications and it may he
several days before they can look at your new or revised information
Y Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one indrvrdual with the expertise
for dealing with reviewer continents would be the best choice fin- the entire review process.
S. Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should he contacted on or by the target date, please feel free to contact us tfyou haven't heard from us by your
target date. Staff may contact you before the target date if the milia! review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff fiom requesting additional infonnation as a result of their technical review
2. Quality Check. TIte next step in the process is a quality check to make sure that the application is reviewable and free from
substantihe flaws that would prevent technical staff from completing the technical review once. it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7! 06-21-11 Page 1 of 1
Spokar►�
ley
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
Site Address: 1008 S MAMER RD
Parcel Number: 45224.4602
Zoning: R-4 Water District: VERA
Fire District: FD 01
New project El
Previous pre -app meeting ❑
Plan recisions 0
Transmittal Date:
Friday, July 01, 2011
Project Number: 11001955
Applicant: SYMONENKO. OLGA & VYACHESC Owner: SYMONENKO. OLGA & VYACHES
1008 S MAMER 1008 S MAMER
SPOKANE VALLEY, WA 99216 SPOKANE VALLEY, WA 99216
(509) 928-9476
e-mail: e-mail:
Contact: SYMONENKO. OLGA & VYACHESC Occupant:
1008 S MAMER
SPOKANE VALLEY. WA 99216 e-mail:
(509) 928-9476
e-mail:
Contractor: OWNER
( ) - 0
Arch / Engineer:
e-mail:
Project
Description: FINISH BASEMENT
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
CONSTRUCTION PLAN
5
TD
S
Please send all plan review and project comments via e-mail to the
highlighted individuals.