Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2011, 06-14 Permit App: 11001621 Addition
Project Number: 11001621 Inv: / Application THIS 1S NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/14/2011 Page I of 2. Project Information: Permit Use: RESIDENTIAL ADDITION Contact: SYMONENKO, OLGA & VYACHESCAR Address: 1008 S MAMER C - S - Z: SPOKANE VALLEY, WA 99216 Setbacks: Front Left: Right Rear: Phone: (509) 928-9476 Group Name: Site Information: Project Name: Plat Key: Name: Range District: Sout Parcel Number: 45224.4602 Block: Lot: SiteAddress: 1008 S MAMER RD Owner: Nance: SYMONENKO, OLGA & VYACHES Address: 1008 S MAMER SPOKANE VALLEY, WA 99216 Location:: CSV Zoning: R-4 SF Res Urban District Water District. 010 VERA Hold: ❑ Arca: 8,525 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Originally Released: 6/14/2011 By: TMELBOU Landuse/Zoning/HE Conditions Released By: Permits• Originally Released: 6/7/2011 By: mpalaniuk Operator: jmm Printed By: JD Print Date: 6/14/2011 Project Number: 11001621 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/14/2011 Page 2 of 2 Building Perini! Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation RES ADD R-3 VB PLAN 120 $12,114.00 120 $12,114.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 120 $12,114.00 120 $12,114.00 Units Unit Desc 1 SELECT 1 SELECT I SELECT Fee Amount $223.25 $4.50 $89.30 Permit Total Fees: $317.05 Notes: ADMINSTRATIVE EXCEPTION (ADE -09-07) APPROVED FOR LOTS 1-4 BLOCK 1 AND LOTS 1-4 BLOCK 2 OF MAMER PLACE.MINIMUM FRONTAGE OF 60 FEET IS ALLOWED -MH Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $317.05 $317.05 $89.30 $227.75 $317.05 $317.05 $89.30 $227.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 6/14/2011 pcm'oof�l�e Com t nity Deverl NrEm nt f Permit Center 1173 East Sp2gJ2LFenuT, ugieF R Tel: (509) 688-0036 1Spokane Valley, WA9 206 0 7 2011 ao#WaYlley' perml arCookan euFax: 509) 688-0037 IName_oq submittal RESIDENTIAL CONSTRUCTION PERMIT APPLICATION (Staff Use Only) PERMIT NUMBER: PERMIT FEE: ❑ NEW CONSTRUCTION Q ADDITION/REMODEL El DECK a OTHER / SITE ADDRESS: ! 008 S ACCESSORY BUILDING ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME: NAME: ©i ya �A4$'ttrev u i &i- fc r -Oren o ADDRESS: /00 d J J 'Z-nl-e- CITY: PHONE: Cpokaiie 7a€Py 5og-n69ti78// FAX://__ It CONTACT NAME: a r AAA'/c. STATE: lag ZIP: 77G/6. qq CELL: Soy' -993- 77 ap PHONE: 509 -993- y3 -g/ FAX: CELL: 30.=/ - j-10 CONTRACTOR NAME: MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE NO.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBee77 THE SCOPEOF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: A ae0e71/444% 4(6'a/iffy / nt ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height t P k: N -H I Dimensiopns: 494# /rt. No. of Stories: Total Habitable Space: Main Floor SQFT: 7 20 Jr Aa G3"Tt3/' Upper Ft6or SQ FT: Unfinished Basement SQ FT: Finished Basement SQ FT: Garage SQ FT: Deck/Covered Patio SQ FT: Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ 0007. COQ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling is/will be served by potable water 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction 15 to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature Date: g1/V// Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_ _Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions o Direction arrow pointing North -and orientation to streets ❑ Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances p Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) 0 Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses . 0 Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing ❑ Window and door location and sizes o Header, beam or concrete lintel sizes 0 Window well locations if applicable o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: ❑ Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Room usage labels o Smoke detector locations o Attic and crawl space access locations ❑ Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Spokane 4.Valley° • For City Usc'Only / PLUS Project Number i/ /&^// • Project Address ;SOW //.4w 11703 E Sprague AJe:Suife B-3 ♦ Spokane Valley WA 99206 • - • ' •509.688.00361 Fax: 509:688.0037:♦ permitcenterspokanevalley.org As part of our on-going commitment: to customer service .during .the review 'process of.your project application; we are providing you with a TARGET. DATE for, the initial.technical: application_review.,.If for, any reason we cannot meet this date, we, will contact you' with a revised target date.,, Your application review TARGET DATE is The TARGET DATE is the date, we estimate your projec review. It is not the date for approval or,permit issuance.• application will.have•,had-its initial technical. r .Tips for Smoother. Protect Application Review Submit complete, accurate plans and documents: Ertra time May be. regau•ed /or.t'e'suhnliltafs• asp pro/ec1 applications reDieii•Brs work 0tw'itiultiple applic0tions and it 11101 be '(1ici-0/'d&1,s beton they nidi /0Ok ai 1'010' 11e1* 0/ revised infoi'ltia/iotl. , Designate a specific contact person to communicate with the City. While the person designated as the applicant's. contactperson with the Cil- canbe changed, o)c indididsia1.ufits the tpertise e fn. dealing iritli re iiewer comments 1501(1[1 he the best choice for. the entire revielt' pi•oce.ss.'` • Call staff regarding the status of your project only after the target date shown at thetop of the page. Although you should b'e contacted 011'01' by the target date, pit ave fee/ /1icee to'cotilacl'uis (Lyon hal-en't,heard from us by Y011 /urge/ date. Staff nim- C'0171.11(1e/o a y011 hre if the target date the. initial, r' vied• is'.cuinple(e Bs•folioning Obis procedure• you 1.11/ saretinte 017(1 a1/011' the reviewei5 10 complete the nark /1i0re'erpeditiousN. Steps in the Permit Process • I. Counter Complete. Your application has been accepted as' counter complete. This means all •of the ,required documents, as indicated on your Pie -Application Chccklisthavc been submitted• or have: been, approved for. deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process, is a quality check to' make sure from substantive Taws that would prevent technical stall from completing the this step is complete, your application will be routed to the appropriate staff comes up for review. [hatThe, applteat ion. is,reviewable and free techniccil,'review once it is`started.',When and, remain in their reVie‘s;. gdeue; until. it 3. Technical Compliance. Once an application is administratively complete, itis routed to technical staff: for compliance review. Depending on the type, of project, technical staff may include, multiple• reviewers. You should be contacted -by phone, fax, email. or mail by your TARGET DATE once the initial technical compliance review is complete.'• • 4, Permit Issuance. When'the technical compliance review'.of the application is complete inciudtng any 'subsequent re-. submittals, each reviewer will, approve their section of the -application and route it to the Per mit. Center.'. When• alt sections of the application are received, a Permit Specialist Will process the application and•contact the person specified on your application for permit pick-up. information regarding fees and pre -construction meetings (if required)'will be.provided by ' the Permit Specialist at that time: WHITE -APPLICANT PINK - BUILDING FILE' REV 9/07 PLANNING DEPT. APPROVED BY. DATE' Gl'8I20/l i'[a, qo' Scute /i S% Lo1- 2 gm ►Maw.rr P!a.ce !Doi 5. /►4,H.c r RECEIVED CSV PEF T CENTER 1UN O 71(75T1 Project — ts4, e _-�- Pio. /ill