2012, 06-15 Permit App: BLD-2012-0896 Remodel/
Sp®I a'e w
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B -
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter@spokanevallev.orq
(Staff Use Only)
PERMIT NUMBER:_ ZOI L-O%c‘. 6
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
NEW CONSTRUCTION
El DECK
ADDITION/REMODEL
OTHER
1:1 ACCESSORY BUILDING
SITE ADDRESS: 0/5S M it4f2 .5.-Pok4Air 041c ry Ulq
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME: OF",d4/S f,(3o.Js)/1 5r22
NAME: MA40/✓ ✓ SAW/(.
ADDRESS: ge./0 E Slooc,at rc0 LA)
CITY:
PHONE:
.S�o2AAX Oa try S.
9228- 0o66
STATE:
thA
ZIP:
FAX: CELL:
CONTACT NAME: MA2Ur0.)
PHONE: 992t-G06d
FAX: CELL: 98/- 6977
CONTRACTOR NAME: MCS 1,07-wa rslt LLC
MAILING ADDRESS: 987o E 5P127&cfj$ o LA)
CITY: Sfdiestmf tL4ccr•)/
PHONE: 929--6066
FAX:
STATE: L4JA ZIP 9772 0e
CELL:
CONTRACTOR LICENSE No.: IyC5ENEL934/4,9
EXPIRES: 4/g/.20/3 CITY BUSINESS LICENSE NO.: &V 713962
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
Fic9MF .NSU/.477 , S'9ffne6<s f )AiNi RO/&Gt44/ areden9.y N/Jtc r ti Arm AA%
'Zrn t r Emile ✓ Act ARIAS
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPL
Height to Peak:
A
Dimension $n•
S/41
No. of Stories:
Agit
Total Habitabl
Space: .<�/
Main FIQ9r SQ FT:
^'/A
Upper Flo r SQ FT:
/�
Unfinished Basement SQ
FT: ' ()
Finished Basement SQ
FT: 737.33o
Garage SQ FT:
A44FT:
Deck/Covered Patio SQ
,oh
Impervious Surface
Area: ,��a
30%Slopes op
Property: /l/
No. of Bedrooms: /
Construction Type: 525
Heat Source: CAS
Sewer or Septic: SEut/L
TOTAL COST OF PROJECT: $ /07 000
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
iJ
Signature
Date: /S ,/ua .26/2-
Updated
2072
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_permit_ _Residential_11-11-11.doc
RESIDENTIAL CHF LIST DIRECTIONS: •
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances •
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
• o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
o Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
o Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations o Supporting wood cripple walls or beams
o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting
o Crawlspace ventilation beams or girder trusses
O Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing
o Header, beam or concrete lintel sizes
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations .
❑ Roof Plan:
o Engineered truss direction and spacing
• o Rafter and over frame direction, size and spacing
.Roof Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and.type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
•
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with Emil vapor barrier
.% <
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Flobr'Joist/ decking direction, size and spacing
O Stairway tread rise & run and nosing
o Window and door location and sizes
o Window well Iodations if applicable
❑,Room usage labels.
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
❑ Ridge, eave,and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
:'Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
•
Spokane
4000Valleyo
Target Date sheet
For City Use Only
PLUS Project Nn -7n17 - ()t%
Project Address
()IS L nit (.011.12-17-'
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with,a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and
several days before they can look at your new or revised information
➢ Designate a speci tic contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
JOr dealing with reviewer comments would be.the best Choice for the entire review process.
Y Call staff regarding the status of your projectbrily after the target date shown at the top of the page.
Although you should he contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save tine and allow the reviewers to complete the work more expeditiously.
tav be
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substanti.e flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff tin compliance review.
Depending on the type of project, technical staff may include multiple reviewers You should he contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Inforntation regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page 1 of 1