Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2008, 06-03 Permit App: 08001981 Residence
Project Number: 08001981 Inv: 1 Application Date: 6/3/2008 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: SFR W/ATT GAR Contact: DIAMOND ROCK CONSTRUCTION Address: 2602 N SULLIVAN RD C - S - Z: SPOKANE VALLEY, WA 99216 Setbacks: Front 33 Left: 5 Right: 6 Rear: 51 Phone: (509) 924-8964 Group Name: Site Information: Project Name: Plat Key: Name: Range District: Sout Parcel Number: 45224.1714 Block: SiteAddress: 1104 S MAMER RD Location:: CSV Zoning: R-3 SF Res District Water District: 010 VERA Lot: Owner: Name: DIAMOND ROCK CONSTRUCTIO Address: 2602 N SULLIVAN SPOKANE VALLEY WA 99216 Hold: ❑ Area: 0 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Driveway/Approach Originally Released: 6/3/2008 By: tmelbourn Released By: Originally Released: Landuse/Zoning/HE Conditions 6/3/2008 By: JLMain Released By: Sewer Review Permits: Originally Released: 5/28/2008 By: cjjanssen Released By: Originally Released: 6/3/2008 By: JLMain Operator: JD Printed By: jmm Print Date: 6/3/2008 Project Number: 08001981 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/3/2008 Page 2 of 3 Contractor: DIAMOND ROCK Address: 2602 N SULLIVAN SPOKANE VALLEY WA 99216 Item Description APPROACH -CONST IN ROW Contractor: DIAMOND BACK Address: 2600 E SELTICE WAY #118 POST FALLS ID 83854 Description Grp Type I&2 FAMILY R-3 VB BASEMENT U R-3 VB DECK OPEN R-3 VB GARAGE U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Notes Contractor: DIAMOND BACK Address: 2600 E SELTICE WAY #118 POST FALLS ID 83854 Item Description DUCT SYSTEMS GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING VENTILATING FANS CLOTHES DRYER HOOD -TYPE 11 Approach Firm: DIAMOND ROCK CONSTRUCTIO Phone: (509) 924-8964 Units Unit Desc 1 NUMBER OF Permit Total Fees: Building Permit Fee Amount $50.00 $50.00 Firm: DIAMOND BACK CONSTRUCTIO Phone: (208) 704-0828 This Application: Total Project: So Ft Valuation Sq Ft Valuation 1,533 $145,619.67 1,533 $145,619.67 1,533 $22,995.00 1,533 $22,995.00 111 $1,665.00 111 $1,665.00 732 $13,908.00 732 $13,908.00 Totals: 3,909 $184,187.67 3,909 $184,187.67 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Fee Amount $1,469.75 $4.50 $587.90 Permit Total Fees: $2,062.15 Mechanical Permit Units 1 2 3 Operator: JD Printed By: jmm Firm: DIAMOND BACK CONSTRUCTIO Phone: (208) 704-0828 Unit Desc NUMBER OF NUMBER OF NUMBER OF # OF UNITS NUMBER OF NUMBER OF NUMBER OF Permit Total Fees: Print Date: Fee Amount $10.00 $10.00 $12.00 $2.00 $30.00 $10.00 $10.00 $84.00 6/3/2008 Project Number: 08001981 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/3/2008 Contractor: DIAMOND BACK Address: 2600 E SELTICE WAY #118 POST FALLS ID 83854 Item Description TOILETS/BIDETS SINKS SHOWERS TUBS DISH WASHERS CLOTHES WASHER MISCELLANEOUS FIXTURES Notes: , Plumbing Permit Page 3 of 3 Firm: DIAMOND BACK CONSTRUCTIO Phone: (208) 704-0828 Units Unit Desc 2 NUMBER OF 5 NUMBER OF 1 NUMBER OF 2 NUMBER OF 1 NUMBER OF 1 NUMBER OF 2 NUMBER OF Permit Total Fees: Fee Amount $12.00 $30.00 $6.00 $12.00 $6.00 $6.00 $12.00 $84.00 ADMINSTRATIVE EXCEPTION (ADE -09-07) APPROVED FOR LOTS 1-4 BLOCK 1 AND LOTS 1-4 BLOCK 2 OF MAMER PLACE.MINIMUM FRONTAGE OF 60 FEET IS ALLOWED -MH Payment Summary: Permit Type Approach Building Permit Mechanical Permit Plumbing Permit Fee Amount $50.00 $2,062.15 $84.00 $84.00 Invoice Amount $50.00 $2,062.15 $84.00 $84.00 $2,280.15 $2,280.15 Amount Paid $0.00 $0.00 $0.00 $0.00 Amount Owing $50.00 $2,062.15 $84.00 $84.00 $0.00 $2,280.15 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 6/3/2008 ,_'vjtinakane .-4,1051 cly Community Development Pramit Center 11707 E Sprague Ave, Suite IOL Spokane Valley, IVA 99206 (509)688-0036 FAX (509)688-0027 ,v,�vsl)okanevallevorc COM Residential' t'oeust-r uettoli Permit Application SITE ADDRESS 410 ASSESSORS PARCEL NO: kd 013 BE RMIT_NUl113 GR: New C'oIn1s r�toethit o Addi tnon/Retzgode1 o Other o ;f:),ec LEGAL DESCRIPTION: Ldt 4 3/R 1 fAte_e Describe the scope of work in detail: 3L;td a Net.) SFR. Cost of Project: **************The following MUST be complete: (write N/A if not licable HEIGHT TO PEAK: Zv applicable)********************** DIMENSIONS:5 c/ 1 # OF STORIES: I 2Nu FLOOR SQ. FTG: I UNFIN BASEMENT SQ. FTG: f ,S33 DEC OV. PATIO .Q. FTG: fit �'C MAIN FLOOR TO SQ. FTG: els x.533 FINISHED BASEMENT SQ. FTG: 0 # OF BEDROOMS: 3 DISCLAIMER The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done iSpokane Valleyn full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of okane Valley is local laws, codes Permit ordinances. 6) Plans or addiThis City of tional information maty beot a permit or requiired to be suuroval bmittedrand subsany equently stateor this application can be processed. subsequently approved before Signature Cvtt C-p�c' Method of Payment: (Faxed permit applications will only be accepted with majorbankcard) 0 Cash ❑ Check Bankcard #: ❑ Mastercard ❑VISA Expires: VIN#: GARAGE SQ. FTG: 2-3st732- CONSTRUCTION TYPE: sFR HEAT E: jt/ai-vial rurnc;r� TOTAL HABITABLE SPACE: I S. -WS IMPERVIOUS SURFACE AREA: 717/ A- 30% SLOPES ON PROPERTY: /V//4' SEWER OR SEPTIC? Date 5/2 3/0p Authorized Signature: REVISED 8/25/2005 0 Other Permit Center DJIe21PP:'. 11707E Spiagtic Ave, Stine 106 Val ley Spokane Valley, WA 907.06 Community Development (509)658-0036 FAX (509)688-0037 gww cpokancrullcy n urm Mechanical Permit Application o Commercial SITE ADDRESS HOZ/ S. ✓NANWGr to/ LUESCRIPTION OF WORK FUEL BURNING APPLIANCE © FUEL BURNING APPLIANCE © UNLISTED APPLIANCE (Additional Fee) UNLISTED APPLIANCE (Additional Fee) 5 USED APPLIANCE (WSEC min. AFUE rating) 6 USED APPLIANCE (WSEC min. AFUE rating) BOILER/REFRIGERATION 8 BOILER/REFRIGERATION 9 BOILER/REFRIGERATION 10 BOILER/REFRIGERATION 1 BOILER/REFRIGERATION 12 GAS LOG, GAS INSERT, GAS FIREPLACE 13 14 RANGE DRYER © FUEL BURNING WATER HEATER 6 MISC FUEL BURNING APPLIANCE 7 GAS PIPING (each outlet) 8 DUCT SYSTEMS 19 VENTILATING FANS 1'1"sla\ilf'I'NUMI3ER: ;rPERMITIvEE;_ esielerttial Phone Vii' Z CIT j1),426 ✓LL' ill L' State ip Phone. City C1ly Business License No Phone: 'Z 1 S --vs Z L f Equal to or less than 100,000 More than 100,000 Equal to or less than 400,000 More than 400,000 Equal to or less than 400,000 More than 400,000 1-100M BTU 101-500M BTU 501 - 1,000M BTU 1,001 - 1,750M BTU More than 1,750M BTU 20 AIR HANDLER DOES NOT include ductin• E•ual to or less than 10,000 CFM 21 AIR HANDLER (DOES NOT include ducting) Greater than 10,000 CFM 22 EVAPORATIVE COOLERS 23 TYPE I HOOD 24 TYPE II HOOD 25 HEAT PUMP/AIR CONDITIONER 26 AIR CONDITIONER 0-3 TON OF UNITS Fax State Zip COST = TOTAL AMOUNT © OD © 00 )2 © r• •• r •r 0110 rr $20.00 $ 2500 $10.00 • rt $1000 $1000 • •r © rr ©ate.• • • rr Ej ® AIR CONDITIONER 3-15 TON 28 AIR CONDITIONER 15-30 TON a00 1200 © r tr V AIR CONDITIONER 30 LPG STORAGE TANK 30-50 TON More than 50 TON WOOD OR PELLET STOVE/INSERT 32 WOOD STOVE - FREE STANDING 33 REPAIR 8 ADDITIONS 34 VENTILATION SYSTEMS 35 VENTILATION MECHANICAL EXHAUST 36 37 INCINERATOR — RESIDENCE INCINERATOR — COMMERCIAL METHOD OF PAYMENT: ❑CASH CARD t/ ❑ CHECK ❑ VISA ❑ MC AUTHORIZED SIGNATURE DATE EXPIRES' © $10.00 © sio.00 X $25.00 X $15.00 X $12.00 X $12.00 X $19.00 X $22.00 SUBTOTAL PROCESSING FEE $35 00 TOTAL PERMIT FEE DUE: REVISED 526/05 . . q4a vp,9k $112 Community Development Plumbing ] errii I'n 11111 Ccnlci 11707 0 Sprague Ave, Suite 100 Spokane Valley, WA 99206 (509)688-0036 FAX- (509)688-0037 wuu' apol,:uu�allcy_gig e�nu AAppkscaden u I -:.t SITE ADDRESS j,b�_c eLli„ r p/ P13RMI"I'.NUMBER PERMIT FEE: . Bclililiug owner_: .:- - -, -Narnc. •Vii?P'iuR6``' --_ -•- _ _- - __ �i L...._, ainJ*PUt fLIJdI Phone :- r;' !j_:10,:f.,cj - Fax +!% Address. (--b LC'. _I�. lfl V/' 1_ _ _ Cit "'il r > ✓•'-t- _ antra ,.......__ _ r_ rC;<:ii>:. L I Stale Contra for '•, s _ __ Y d -, / l-'��' Name r; ---�.Ll/� d y NG -E S .j/r eS Address: Phone. Fax• L, -•},ii License No' eCoritacLe<,a,;'i, Name: AkA` DESCRIPTION OF WORK TOILETS URINALS TUBS City City Business License No' State ;-.:... -"i'K'e:=k'T e�tt✓�`tl:-ii'c9;.M'•r Phone. zfr1-`992.111 WATER CLOSET, BIDETS ZZ OF UNITS X COST = TOTAL AMOUNT Z- X $6 00 - r Z 11 $6 00 $6.00 6 $6 00 SHOWERS SINKS PER TRA DISHWASHER BATH, STALL, ON-SITE BUILT LAVS/BASINS, BAR, FLOOR, KITCHEN, LAUNDRY, UTILITY, JANITOR, PHOTO, X-RAY, FOOD, PREP/CULINARY MEAT CLOTHES WASHER 8 GARBAGE DISPOSAL 9 WATER SOFTENER 10 ELECTRIC HOT WATER TANK 11 FLOOR DRAINS $6.00 $0.00 $6 00 NOTE- IF GAS, SEE MECHANICAL ROOF DRAINS/OVERFLOW 12 DRAINS AREA, CASE, COIL, TRENCH, CONDENSATE 13 FOUNTAINS, DRINKING WATER PIPING/DRAIN-IN WASTE, NSTALLATION, ALTERATION, REPAIR, 14 VENT, PLUMBING, REVERSAL REVERSALS 15 SEWAGE EJECTOR GRINDER, SUMP PUMP 16 WATER USING DEVICE 7 CROSS CONNECTION DEVICE 8 INTERCEPTORS ICE AN/OR COFFEE MAKER, HOSE BIB, STEAMER PROOFER, CARBONATOR, SWAMP COOLER VACUUM BREAKER. CHECK VALVE, AND R.P.B P D. FOR: VATS, TANKS, BOILERS GREASE TRAP, SAND TRAP, CHEMICAL HOLDING TANK $6 00 X $6.00 X $6.00 X $6.00 X $6.00 X $6.00 X 56.00 X 56.00 19 MEDICAL GAS (per outlet) MISCELLANEOUS PLUMBING 20 FIXTURE NITROUS, OXYGEN 21 PRIVATE SEWAGE DISPOSAUSYS INDUSTRIAL WASTE 22 INTERCEPTOR METHOD OF PAYMENT: 0 CASH 0 CHECK DATE: AUTHORIZED SIGNATURE: ❑ VISA 0 MASTERCARD EXPIRES 56.00 56 00 X $600 X $6 00 X $6.00 X $20.00 X 51500 SUBTOTAL PROCESSING FEE 535.00 TOTAL PERMIT FEE DUE: REVISED2n6/05 pCITI' OF kane Valley Site Address: 1104 S MAMER RD Parcel Number: 45224.1714 Zoning: R-3 Fire District: FD 01 Project Transmittal City of Spokane Palley Community Development Department 11703 E. Sprague Ave, Suite 133 Spokane \'alley, WA 99206 Phone 509.688.0036 New project D Previous pre -app mewing �0 ed Plan revisions yl Transmittal Date: Tuesday May 27, 2008 Water District: VERA Project Number: 08001981 Applicant: e-mail: Contact: e-mail: Contractor: DIAMOND ROCK CONSTRUCTION 2602 N SULLIVAN RD SPOKANE VALLEY, WA 99216 (509) 924-8964 DIAMOND ROCK CONSTRUCTION 2602 N SULLIVAN RD SPOKANE VALLEY, WA 99216 (509) 924-8964 Owner: DIAMOND ROCK CONSTRUCTION 2602 N SULLIVAN SPOKANE VALLEY WA 99216 e-mail: Occupant: e-mail: DIAMOND BACK CONSTRUCTION Arch /Engineer: 2600 E SELTICE WAY #118 POST FALLS ID 83854 (208) 704-0828 e-mail: lECEHE MAY27208 Project SFR W/ATT GAR Description: Please send all plan review and project comments via e-mail to the highlighted individuals. Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION \ \ : SITE PLAN ( A PLANE n `\ Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane e Valley® For City Use Only PLUS Project Number riSs('" { °N) Project Address NIrAnlQJ( 11703 E Sprague Ave Suite 8-3 • Spokane Valley WA 99206 •509.688.0036 ♦ Fax: 509.688.0037 • permitcenter®spokanevalley:org • As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revisedtarget date: Your application review TARGET DATE is &)\-) 1- cm The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. ' Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. ` Extra time mm- be required for re -submittals as project application reviewers work on multiple applicatiohs'and it. may be several darns before they can look at vour new or revised information. Designate a specific contact person to communicate with the City. While the person designated as the applicants contact person with the City can he changed, one individual with the expertise for dealing with reviewer comments would he the hest choice for the entire review process. i Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should he contacted on or by the target date, please feel free to contact us J von haven't heardfrom us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure. you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once itis started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. - 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, Including any subsequent re - submittals. each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK- BUILDING FILE REV 9/07 51‘°f Scale Yu S Lot &. 1312(1 r&c, witr Peace - It nc{ S. Ola,Ke,r PLANNING DEPT. APPROVED BY. DATE: 1L40,97' r, c 33' 1