2001, 11-19 Permit: 01010109 Residence1
SPOKANE COUNTYDIVISIONOF BUILDING
AND CODE ENFORCEMENT
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Information
Project Information
Site Address: 1401 S MAMER LN
SPOKANE, WA 00000
Parcel Number: 45224.4309
Subdivision: DHAENENS SQUARE PHASE II
Block: Lot: D
Zoning: UR -7 Urban Residential -7
Owner: LEXINGTON HOMES
Address: 12218 E NEZ PERCE
SPOKANE, WA 99206
Building Inspector: DAN HOWARD
Water Dist:
Project Number: 01010109 Inv: 1 Issue Date: 11/19/01
Permit Use: NEW RESIDENCE W/ATTACHED GARAGE - GAS
Applicant: LEXINGTON HOMES
12218 E NEZ PERCE
SPOKANE, WA 99206
Contact LEXINGTON HOMES
12218 E NEZ PERCE
SPOKANE, WA 99206
Phone: (509)924-1519
Phone: (509)924-1519
Setbacks -Front: 20 Left: 38 Right: 5 Rear: 15
Group Name:
--Project Name:
Permits
Building Permit
New Building
Dim: 44 X 54 1 Story
Sq Ft: 2.834
Grp: R-3 Type: VN
Contractor: LEXINGTON HOMES 1,
License #: LEXINHI0257A
BASEMENT F
BASEMENT U
DECK
GARAGE
RESIDENCE
Total Value:
FOR BUILDING INSPECTIONS CALL (509) 477-3675.
R-3 VN 517 RESIDENTIAL VALUATION
R-3: /VN- 1 j 885 STATE SURCHARGE
R-3". VN ! 200 RESIDENTIAL SURCHARGE
U -I )VN, 495
R-3 1.432
1.432
- $114,574 52
Total Permit Fee:
$970.00
8450
$213.40
$1,187.90
Mechanical Permit
R - 1
Contractor: R & R IIEATING & AIRCOND INC
License#: RRHEAA'106BW
.GAS WATER HEATER
GAS PIPING 71f (I
VENTILATING FANS '!I f
GAS LOG'OR GAS INSERT, 111,
FOR MECHANICAL INSPECTIONS CALL (509),477-3675.
$10.00 GAS APPLIANCE<=100,000BT
$3.00. HEAT PUMP OR A/C 0-3 TONS
$40.00 \ CLOTHES DRYER
$10.00. HOOD -TYPE II
r' . Tri -Q•,.
Total Permit Fee:
812 00
$12.00
S10.00
$10.00
$107.00
Plumbing Permit
Contractor: 5 T PLUMBING CO INC
License#: STPLUI*016QH
TOILETS/BIDETS
SHOWERS
DISH WASHERS
CLOTHES WASHER
WATER USING DEVICES
FOR PLUMBING INSPECTIONS CALL (509) 477-3675.
4 $24.00
3 $18.00
1 86.00
1 $6.00
3 $18.00
SINKS
TUBS
GARBAGE DISPOSAL
FLOOR DRAINS
Total Permit Fee:
5 $30.00
1 $6.00
1 $6.00
1 S6.00
$120.00
Processed By: DAWN DOMPIER
Printed By: WENDEL, GLORIA Page 1 of 2
PERMIT
FILE
NOTICE
It is the responsibility of the applicant/permittee, not Spokane County, to see to it that the use described on the front of this permit complies with
applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary
approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the
applicant's/permittee's or property owner's expense At a minimum, the following inspections ARE REQUIRED by County Code -
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-
way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of
right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verify their location prior to locating your structure Failure to properly locate the structure may require its relocation at the
owner's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete
3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing.
4 INSULATION - prior to the installation of drywall
5. PLUMBING - after rough -in, before covering, and final
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final
7 FINAL - when complete and prior to occupancy and/or use Please provide 24 hours notice. Alli permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site
drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy
8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed
inspection record card must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc , must be inspected
prior to cover Check with the department for "special inspections" in conjunction with commercial projects
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Division
of Building and Code Enforcement
477-3675
• Construction in a flood plain, Division of Engineering & Roads
477-3600
• Electrical wiring, State Department of Labor and Industries
324-2640
• On-site waste disposal system, Spokane Regional Health District
324-1560
• Road cuts for utilities or driveways, Division of Engineering &
Roads - 48-HOUR NOTICE REQUIRED
477-3600
or State Department of Transportation
456-3000
• Sewer connection, Division of Utilities
477-3604
or City Public Works Department
625-6300
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for
a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration At a
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year
of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions
All refund requests must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the date of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please
bnng it to our attention immediately by tiling a written request for correction within 10 working days of discovery All such requests should be directed to
the Division of Building and Code Enforcement at the below address.
Spokane County Division of Building & Code Enforcement
1026 West Broadway Avenue
Spokane, WA 99260
Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133
C
SmlaKECawnn'
SPOKANE COUNTY DIVISION OF BUILDING
AND CODE ENFORCEMENT
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Information
Project Information
Site Address: 1401 S MAMBA LN
SPOKANE, WA 00000
Parcel Number: 45224.4309
Project Number: 01010109 Inv: 1 Issue Date: 11/19/01
Permit Use: NEW RESIDENCE W/ATTACHED GARAGE - GAS
Permits
Payment Summary
Total Fees AmountPaid AmountOsring - Tran Date Receipt # Payment Amt
$1,414 90 $1,414.90
$0.00
11/19/01
9283
$1,414.90
Processed By: DAWN DOMPIER
Printed By: WENDEL, GLORIA Page 2 of 2
PERMIT
NOTICE
It is the responsibility of the applicant/permittee, not Spokane County., to see tp it that the use described on the front of this permit complies with
applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary
approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the
applicant's/permittee's or property owner's expense At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-
way Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of
right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
owner's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete
3 FRAMING - after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall. .
5. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final
7. FINAL - when complete and prior to occupancy and/or use Please provide 24 hours notice. /jll permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site
drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy.
8 MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc installed, and prior to occupancy; completed
inspection record card must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Division
of Building and Code Enforcement
477-3675
• Construction in a flood plain, Division of Engineering & Roads
477-3600
• Electrical wiring, State Department of Labor and Industries
324-2640
• On-site waste disposal system, Spokane Regional Health District
324-1560
• Road cuts for utilities or driveways, Division of Engineering &
Roads - 48-HOUR NOTICE REQUIRED
477-3600
or State Department of Transportation
456-3000
• Sewer connection, Division of Utilities
477-3604
or City Public Works Department
625-6300
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for
a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration At a
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year
of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions
All refund requests must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days atter the date of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you bring t tlnk we've made an o our attention immediatin ely by filing a gw written requestjsys permit or in o rr tin within 10 workiions nglng to it, or days of discovery All such requeerroneous sts should be direon in the permit, clease
ted to
the Division of Building and Code Enforcement at theheCrricidress.
Spokane County Division of Building & Code Enforcement
1026 West Broadway Avenue
Spokane, WA 99260
Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133