Loading...
1994, 12-09 Permit: 94011823 SewerSPOKANE COUNTY DEPARTMENT OF BUILDINGS WEST 1026 BROADWAY • SPOKANE, WA 99260-0050 (509) 456-3675 SITE INFORMATION PROJECT INFORMATION SITE ADDRESS: 1516 S MAMER-LN. SPOKANE WA 99216 PARCEL NUMBER: 45224.9180 _- SUBDIVISION: DHAENENS SQUARE PHASE I LOT: 1 BLOCK: 4 ZONE: UR -7 INSPECTOR: REED OCKEY WATER DIST: VERA OWNER: WRS 8 ASSOC ' PHONE: 509 922 0282 I ADDRESS: PO BOX 140841 SPOKANE WA 99214 PROJECT NUMBER: 94011823 ISSUE DATE: 12/09/94 PERMIT USE: SEWER CONNECTION - DHAENENS SQUARE 1ST (94S-1336) APPLICANT: WRS 8 ASSOC PHONE: 509 922 0282 ADDRESS: PO BOX 14084 SPOKANE WA 99214 CONTACT: BILL SMITH PHONE: 509 922 0782 SETBACKS -> FRONT: NA LEFT: NA RIGHT: NA REAR: NA LENDER NAME: PHONE: ADDRESS: PERMI1(S SEWER PERMIT CONTRACTOR UNKNOWN LICENSE #: UNKNOWN - - _ SEWER CONNECTION 1 _ PROCESSING FEE 10.00 • - TOTAL PERMIT FEE $50.00 PAYMENT SUMMARY NOTES PAYMENT DATE RECEIPT# PAYMENT AMOUNT 11/30/94 00014081 $50.00 TOTAL FEES AMOUNT PAID' $50.00 - . $50.00 • DUPLICATE AMOUNT OWING BY: CAROL FRAZIER ***FOR SEWER STUB AS -BUILT INFORMATION AND INSPECTIONS, CALL THE COUNTY UTILITIES DEPARTMENT AT 456-3604*** CONTRACTOR OR APPLICANT IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR -TO ANY OTHER EXCAVATION TO LOCATE, BURIED CABLES, GAS PIPING, WATER LINES, ECT. CALL BEFORE YOU DIG (456-8000) SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO INSURE THAT THEY ARE CLEAR AND UNOBSTRUCTED TO THE SEWER MAIN ********* CALL FOR INSPECTION PRIOR TO COVER ********** ********* 24 HOUR NOTICE REQUIRED ********** 1 NOTICE ^ It is the responsibility of the permittee, not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the owner's/permittee's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee —neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is required to be inspected prior to the installation of skirting.) 3 FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5 PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7 FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. CALL 456-3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. YOUR INSPECTOR IS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • Road cuts for utilities or drives, County Engineer's Office 456 -3600 - or State Department of Transportation 456-3000 • Sewer connection, County Utilities Department 456-3604 or City Public Works Department 625-6300 • On-site waste disposal system, Spokane County Health District • Electrical wiring, State Department of Labor and Industries 324-1560 324-2640 • Construction in a flood plain, County Engineer's Office 456-3600 EXPIRATION Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit if not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations— please call us if you have any questions. MISTAKES? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Buildings at the address found on the face of this permit. I certify that I have examined this permit/application, state that the information contained in it and submitted by me or my agent to compile said permit/application is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. I understand that the issuance of this permit/application and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any state or local law regulating construction, or as a warranty of conformance with the provisions of any state or local laws regulating construction. SIGNATURE OF APPLICATION OWNER OR AGENT DATE He : CO,lS_ Mawr&C. WATER & POWER December 7, 1994 Mr. Tom Davis Spokane County Building Department West 1026 Broadway Spokane, WA 99260 Re: PE -1731-93, Water System, Dhaenens Square Dear Mr. Davis: 601 N. Evergreen Road P O. Box 630 Veradale. WA 99037-0630 (509) 924-3800 BEG - l) SPOKINNOMUNTY DEC 0904 IYISfON OF BuI WINPS We understand that a water system must be installed prior to the issuance of any building permits for this project. Due to the unusually heavy construction schedule that Vera's water crew experienced during the summer and early fall of 1994, we asked the developer if this project be scheduled for late fall or next spring, and it was scheduled for late fall. With the early winter that we have experienced, it was impossible to complete this project prior to the ground becoming unworkable. There exists on this property a water service, currently being billed to the developer, that may be utilized for the installation of a temporary water system for the 10 houses that are being proposed for construction this winter. This meter has the capacity to provide domestic water to these homes and has been accepted. Vera has no objection to the utilizing of this water meter for a temporary water system, provided that the permanent system be installed prior to June 30, 1995. If you have any further questions please call. Sincerely, VER WATER & POWER evin M. Wells General Manager Agency Acceptance Washington State Depa ! ent of H Spokane County H;.lth District cc. Bill Smith Spokane County Fire Protection District No.11,y,t ACTION: R SCREEN: NOPJ USERID: M5TI H - BUILDING PERMIT SYSTEM NOTES BY PROJECT JURISDICTION= 11 PROJECT NUMBER= 94011653 DEPT= 1000 TOPIC= CONDITIONS LINE DESCRIPTION 01- 01 00 SPECIAL INSPECTIONS REQUIRED ON FOUNDATIONS AT 3000 PSI 02- 02 00 RELEASED PER VERA LETTER DATED 12/7/94 FOR TEMP CONNECTION. 03- 04- 05- 06- 07- 08- 09- 10- 11- 03 -*L009 HEADER CHANGE ACTION: A SCREEN: NOPJ USERID: MSTI 'H - BUILDING PERMIT SYSTEM NOTES BY PROJECT JURISDICTION= 11 DEPT= 1000 LINE PROJECT NUMBER= 94011663 TOPIC= CONDITIONS DESCRIPTION 01- 01 00 SPECIAL INSPECTIONS REQUIRED ON 3000 PSI CONCRETE 02- 02 00 RELEASED PER VERA LETTER DATED 12/7/94 FOR TEMP CONNECTION. 03- 04- 05- 06- 07- 08- 09- 10- 11- 01 -*L006 ADD KEY FOUND