2015, 02-09 Permit: SW-15000071 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000071 Permit Issued Date: 02/09/2015
Expiration Date: 02/09/2016
Project Description: SEWER
Project Name: CROSBY LANDING - LOT 8, BLOCK 1
Primary Contact: VIKING BUILDERS LLC
Phone: 208-762-9106
Applicant: VIKING BUILDERS LLC
Address: 2605 W HAYDEN AVE
HAYDEN, ID 83835
Phone: 208-762-9106
Email: billie@vikinghomes.com
SITE INFORMATION:
Site Address:
Parcel Number:
1007 N MARCUS LN
46141.9003
Assessor's Description: 14-26-44 S275FT OF E316.8 FT OF N32R OF
SE1/4 OF NE1/4 (SENIOR CITIZEN EXEMPTION
PARCEL EXEMP = 1.81 AC + HOUSE/GARAGE
TAXABLE = OUTBUILDINGS)
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
VIKING BUILDERS LLC
2605 W HAYDEN AVE
HAYDEN, ID 83835
208-762-9106
billie@vikinghomes.com
Water District: Fire District: Fire District 9
STA Land Area: 1.81 Acre(s)
CONTRACTOR INFORMATION:
NORTHEI044KF, Exp. 05/01/2015
NORTHWEST EXCAVATORS
2207 W. JACKSON AVE. SPOKANE, WA 99205
509-466-7574
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$27.12
$125.00
$152.12
$125.00
CONDITIONS:
NRL Notification Area
Erodible Soils within Parcel
Possible Wetland On Site
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 02/09/2015 10:40:59 Project Coordinator: Susan Clark
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000071 Permit Issued Date: 02/09/2015
Expiration Date: 02/09/2016
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 02/09/2015 10:40:59 Project Coordinator: Susan Clark