2015, 05-20 Permit: SW-15000454 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000454 Permit Issued Date: 05/20/2015
Expiration Date: 05/20/2016
Project Description: SEWER
Project Name: CROSBY LANDING, LOT 9 BLOCK 2
Primary Contact: VIKING BUILDERS LLC
Phone: 208-762-9106
Applicant: NORTHWEST EXCAVATORS
Address: 2207 W. JACKSON AVE.
SPOKANE, WA 99205
Phone: 509-466-7574
Email:
SITE INFORMATION:
Site Address: 1028 N MARCUS LN Owner: VIKING BUILDERS LLC
Parcel Number: 45141.1509 Address: 2605 W HAYDEN AVE
HAYDEN, ID 83835
Phone: 208-762-9106
Assessor's Description: CROSBY LANDING (NE -14-25-44): LOT 9 BLK 2 Email: billie@vikinghomes.com
(AFN 6359704)
Inspection Area: : (509)-477-3675
Water District: Vera Irrigation District #15 Fire District: Spokane Valley Fire
Zoning: Land Area: 8912 Square Feet
CONTRACTOR INFORMATION:
NORTHEI044KF, Exp. 05/01/2017
NORTHWEST EXCAVATORS
2207 W. JACKSON AVE. SPOKANE, WA 99205
509-466-7574
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$27.12
$125.00
$152.12
$125.00
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 05/20/2015 15:00:01 Project Coordinator: Susan Clark
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000454
Permit Issued Date: 05/20/2015
Expiration Date: 05/20/2016
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 05/20/2015 15:00:01 Project Coordinator: Susan Clark