Loading...
2008, 04-07 Permit App: 08001223 Storage BldgProject Number: 08001223 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/7/2008 Page 1 of 2 Project Information: Permit Use: CONSTRUCTION 4.9 X 15.9 STORAGE BLDG Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 002752 Name: VERA Contact: HUGHES, LARRY E & GLORIA J Address: 1816 S MAMER RD C - S - Z: SPOKANE VALLEY, WA 99216 Phone: (509) 928-5443 Group Name: Project Name: District: Sout Parcel Number: 45271.1129 Block: SiteAddress: 1816 S MAMER RD Location:: CSV Lot: Owner: Name: HUGHES, LARRY E & GLORIA J Address: 1816 S MAMER RD SPOKANE VALLEY, WA 99216 Zoning: R-2 SF Res Suburban District Water District: 010 VERA Hold: ❑ Area: 42,500 Sq Ft Width: 130 Depth:. 300 Right Of Way (ft): 40 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: Landuse/Zoning/HE Conditions 4/7/2008 By: tmelbourn Released Byi ', Originally Released: 4/7/2008 By: cjjanssen Permits • Operator: jmm Printed By: jmm Print Date: 4/7/2008 Project Number: 08001223 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/7/2008 Page 2 of 2 Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation GARAGE U-1 VB 106 $2,014.00 106 $2,014.00 Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Totals: 106 $2,014.00 106 $2,014.00 Units Unit Desc Fee Amount 1 SELECT $83.25 1 SELECT $20.81 1 SELECT $4.50 Permit Total Fees: $108.56 Notes: e Please let me know when a permit has been issued. Disregard they have obtained permit Payment Stunntary: , Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing BuildingPernut $108.56 $108.56 $0.00 $108.56 $108.56 $108.56 $0.00 $108.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 4/7/2008 Spokane cooValley- Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 RECEIVED BY (509)688-0036 FAX:(:3gPOKANE VALLEY, www.spokanevalley.org Community Development Residential Construction _ Permit Application B APR 0 A 2006 IRFes€Ntk%truction ❑ Accessory Bldg emodel ❑ Deck PERMIT NUMBER: -1123 PERMIT FEE: U Other: ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building'Owner ...,`,t,,,.Contiactorr_/,lie DIMENSIONS:,# /�- '9 1• jE i/ 9 i i Name: L / 0..Krv/ t_ rer. 4,0 S Name Address: J P / Cda, caneL' k° Address: Zt Ci / State:u�� p���%% ty�� �,FS /l y Ci State: Zip. City: Phone?. . i /' Fax: /_ Phone: Fax: GARAGE SQ. FTG: Contractor Lic No: Exp Date: ,...a . , .,x..- � `.:r ;�,; .=,� ':�": .. ;,Contact Person'' .;� - -..�, - .:. . ... ... .. . # OF BEDROOMS: City Business Lic. No: HEAT URe : SEWER OR SEPTIC? Name: I Ci i t Phone: 7 Describe the scope of work in detail: ( L n s r i, y 'e( s rn c& h Cost of Proje�/t: f�� Proposed Use: �5.'-0!`ct a� _ **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: 1`: / DIMENSIONS:,# /�- '9 1• jE i/ 9 i i OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2"D FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: - IMPERVIOUS SURFACE AREA: • FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DEC OV. PATIO S . FTG: /0c 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE:, HEAT URe : SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This ,fty of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plan • or additional information may be required to be submitted, and subsequently approved before this application.e processed. — SIG NATU Method of Pay ❑ Cash 0 Check 0 Mastercard CCSI VISA Bankcard #: Expires: VIN#: DATE: iJ— y—O5 Authorized Signature: REVISED 2/15/07 SpUl�aile 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 - ♦509.688.0036 ♦ Fax: 509.688.0037 • 1#Valley ❑X Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. ❑X Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. ❑X Show the height of any proposed buildings or accessory structures. ❑X Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. ❑X Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. pX Floor framing details: Joist type, size, spacing and installation details. ❑X Roof framing plan and details �X Furnace and hot water heater location is All header locations: type, size and connections OX Foundation plan ❑X Insulation information LEDecks and Stairway details AH braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage (4 *Wane .0000Valley° For City Use Only PLUS Project Number g- /(9-ny' Project Address /' /to 5 a /ne r 11703E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. • Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Extra time maty be required/ for re -submittals as project application reviewers work on multiple applications and it mcn' be several dues before they can look at your new or revised information. i Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise fa' dealing with reviewer comments would be the best choice for the entire review process. Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact ns rf you haven't head from us by your target date. Staff may contact you before the target date ff the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more erpeditious/v. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted ,or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be. contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received. a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REV9/07 1/C A zoftr 3 /9z Cu / 1 5. X ' S r /,v s e. . 4 r 33 60 V PLANNING DEPT. APPROVED BYC CLIA ALL DATE. 4L1 4h (CS 30� /77' SGAh f is= 20 �s- S1�It4414„,Valley Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project Previous pre -app meeting ❑ Plan revisions D Transmittal Date: Friday, April 04, 2008 Site Address: 1816 S MAMER RD Parcel Number: 45271.1129 Zoning: R-2 Water District: VERA Fire District: FD 01 Project Number: 08001223 Applicant: HUGHES, LARRY E & GLORIA J Owner: HUGHES, LARRY E & GLORIA J 1816 S MAMER RD 1816 S MAMER RD SPOKANE VALLEY, WA 99216 SPOKANE VALLEY, WA 99216 (509) 928-5443 e-mail: e-mail: Contact: HUGHES, LARRY E & GLORIA J Occupant: 1816 S MAMER RD SPOKANE VALLEY, WA 99216 e-mail: (509) 928-5443 e-mail: Contractor: OWNER ( ) - 0 Arch / Engineer: e-mail: Project CONSTRUCTION 4.9 X 15.9 STORAGE BLDG Description: RECEPW7Pri- Please send all plan review and project comments via e-mail to the highlighted individuals. Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION CONSTRUCTION PLANS SITE PLAN TDS Please send all plan review and project comments via e-mail to the highlighted individuals. CLIA COUJ -/L ,Ex , s r / No. M -1 4I- RovF /AG- 4?(N G cr 3-z AGS PPS � 4 f,,f44( 9-9 4X4 8 -oc &A LI K (, ?° ST wok (3)zX(c, 5-o gp`/ A -Pe vlov li) (dos- 3AS&- G P -r a_o Min/ >9N TJ 727 64- 0/°y"' -dam WA/6 New /5-y x 4-9 PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS THIS BUILDING SUBJECT TO FIELD INSPECTION.CORRECTIONS CITY COPY ONIN11111111 REVIEWED FOR CCE SPOKANE VALLEY BUILD G D / ION