2013, 04-18 Permit: SW-13000488 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000488 Permit Issued Date: 04/18/2013
Expiration Date: 04/18/2014
Project Description: SEWER CONNECTION
Project Name: VERADALE PH I
Primary Contact: THE ROCK WHISPER
Phone: 509-216-0423
Applicant: THE ROCK WHISPER
Address: 16617 S SHERMAN RD
CHENEY, WA 99004
Phone: 509-216-0423
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
1218/1220 N MARCUS RD
45141.1208
Assessor's Description: 8TH ADDITION TO VERADALE HEIGHTS ALL LT
5 & PTN LT 4 BLK 4 DAF; BEG AT NW COR LT 4
BLK 4, TH ELY ALG N LN TO NE COR, TH SLY
ALG ELY LN 7.63FT, TH S89DEG 57MIN 27SDS W
70.61 FT, TH NWLY 58FT TO NW COR
Inspection Area: : (509)-477-3675
Owner: CHAVEZ, BRIAN M
Address: 1306 S MARIGOLD ST
VERADALE, WA 99037-9631
Phone: 509-991-2450
Email:
Water District: Vera Irrigation District #15 Fire District: Spokane Valley Fire
Zoning: Land Area: 12415 Square Feet
CONTRACTOR INFORMATION:
ROCKWRW884D1, Exp. 03/21/2014
THE ROCK WHISPERER LLC
16617 S SHERMAN RD CHENEY, WA 99004
509-216-0423
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.32
$125.00
$151.32
$125.00
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 04/18/2013 09:58:02 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000488 Permit Issued Date: 04/18/2013
Expiration Date: 04/18/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/18/2013 09:58:02 Project Coordinator: Dawn Dompier