2013, 01-23 Permit: SW-13000028 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -13000028
Permit Issued Date:
01/23/2013
Expiration Date: 01/24/2013
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
SUTTERS PH 3
SEWER
Primary Contact: ROTO ROOTER
Applicant:
Address:
Phone:
Email:
ROTO ROOTER
6214 E ALKI AVE
SPOKANE VALLEY, WA 99212
509-484-6937
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
810 S MARCUS CT
45234.1902
TUPPER SUBDIVISION
TUPPER SUB L2 B1
Water District: Vera
Irrigation District #15
Owner:
Address:
Phone:
Email:
PNC BANK NA
3232 NEWMARK DR
MIAMISBURG, OH 45342
Fire District: Spokane Valley Fire
Land Area: 10140 Square Feet
CONTRACTOR INFORMATION:
General Contractor
ROTOR**931 BB
ROTO ROOTER
6214 E ALKI AVE
SPOKANE VALLEY, WA 99212
509-484-6937
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1
$125.00 $125.00
Total Fee:
$125.00
$26.32
$125.00
$151.32
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 01/23/2013 09:14:56
Printed by: IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -13000028 01/23/2013
Expiration Date: 01/24/2013
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 01/23/2013 09:14:56
Printed by: IIS APPPOOL\SmartGovProdApp