Loading...
2012, 06-21 Permit: SW-12001599 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001599 Permit Issued Date: 06/21/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION SUTTER'S PHASE III SEWER Primary Contact: LARRY MILLER EXCAVATING Applicant: LARRY MILLER EXCAVATING Address: Phone: Email: 7117 E RUTTER AVE SPOKANE, WA 99212 509-218-3335 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 811 S MARCUS CT 45234.2002 TUPPER SUBDIVISION TUPPER SUB L2 B2 Water District: Vera Irrigation District #15 Owner: Address: 811 S MARCUS VERADALE, WA 99037 Phone: FITZPATRICK, HUGH P & SUSAN A Email: Fire District: Spokane Valley Fire Land Area: 0.2364 acres / 10296 sqft CONTRACTOR INFORMATION: General Contractor LARRYME918DR LARRY MILLER EXCAVATING 7117 E RUTTER AVE SPOKANE, WA 99212 509-218-3335 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 $125.00 Total Fee: $25.94 $125.00 $150.94 CONDITIONS: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed: 06/21/2012 12:42:18 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001599 06/21/2012 Expiration Date: SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/21/2012 12:42:18 Printed by: IIS APPPOOLWSP.NET v4.0