Loading...
HomeMy WebLinkAbout2009, 12-11 Permit App: 09003676 PoolProject Number: 09003676 Inv: I Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/11/2009 Page 1 of 2 Project Information: Permit Use: IN GROUND POOL Contact: POOL WORLD INC. Address: 13524 E SPRAGUE AVE C - S - Z: SPOKANE, WA. 99216 Setbacks: Front Left: Right: Rear: Phone: (509) 928-6585 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Parcel Number: 45261.1641 SiteAddress: 2311 S MARCUS LN Location:: CSV Zoning: R-2 Block: Lot: Owner: Name: TADLOCK, TIMOTHY & CHRISTI Address: 13712 E EVERETT AVE SPOKANE, WA 99216-3005 SF Res Suburban District Water District: 010 VERA Area: 15,426 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information:�_ Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review [Released By: Originally Released: 12/10/2009 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 11/13/2009 By: mpalaniuk Contractor: POOL WORLD INC Address: PO BOX 14927 SPOKANE, WA 99214 Item Description SWIM POOL > 5000 GAL Swimming Pool Firm: POOL WORLD INC Phone: (509) 928-6585 Units Unit Desc 1 SELECT Fee Amount $52.00 Permit Total Fees: $52.00 Operator: JD Printed By: JD Print Date: 12/11/2009 Project Number: 09003676 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/11/2009 Page 2 of 2 Notes•,, Payment Summary �4 _� Permit Type Swimming Pool Fee Amount Invoice Amount Amount Paid Amount Owing $52.00 $52.00 $0.00 $52.00 $52.00 $52.00 $0.00 $52.00 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed 13y: JD Print Date: 12/11/2009 pokane jValley� Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER:, `( PERMIT FEE: New Construction Addition/Remodel Other: Accessory Bldg Deck SITE ADDRESS: ( J 0\ A �l 5 t -"J ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: DIMENSIONS: Name: Jy.,� t.c) '/LC. �� /3 1 i Name. —Ft M \2. L Do/�_ 2"" FLOOR SQ. FTG: Address: 31 t S yi pi2L V S L Phone: 12v _ 6 j S Fax: City: G (90 (,J4 L/AL ts'� State: t ,��P Zip: 5"9L"� Phone: Crag _ 6 - Fax: HEAT SOURCE: Contact Person Name: 1-, 1-0104.49c., l,L Phone: 4 34 - Describe the scope of work in detail: Contractor: DIMENSIONS: Name: Jy.,� t.c) '/LC. �� /3 1 i TOTAL HABITABLE SPACE: Address: /-3..--ii g 69A{/q‹ (it 2"" FLOOR SQ. FTG: City: P016/ 1I/A-&-ei-f Stater. Zip: 0/ c,, %< Phone: 12v _ 6 j S Fax: GARAGE SQ. FTG: Contractor Lic No: Exp Date: P-cc.-c.)i -2i-// CP too 30% SLOPES ON PROPERTY: City Business Lic. No: CONSTRUCTION TYPE: (� Cost of Project: $f 030 l4� CZ()-6j:k2r_) ,JtvnMrA;1 dooL, Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. - - - - €• i..1 SIGNATURE: Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: DATE: 0 VISA VIN#: Cay 6 (3,3Con 1 RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing O Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation ❑ Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any ❑ Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing g\a'av -'MtI1ey Site Address: 2311 S MARCUS LN Parcel Number: 45261.1641 Zoning: R-2 Fire District: FD 01 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Water District: VERA Newproject • Pmvious pre -app meet ' g 0 Plan revisions 0 Transmittalllate. Friday, Nowmber/3, 2009 Project Number: 09003676 Applicant: POOL WORLD INC. 13524 E SPRAGUE AVE SPOKANE, WA. 99216 (509) 928-6585 e-mail: Contact: POOL WORLD INC. 13524 E SPRAGUE AVE SPOKANE, WA. 99216 (509) 928-6585 e-mail: Contractor: POOL WORLD INC PO BOX 14927 SPOKANE, WA 99214 (509) 928-6585 Owner: TADLOCK, TIMOTHY & CHRISTIN 13712 E EVERETT AVE SPOKANE, WA 99216-3005 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: Project, 3ROUND POOL Description,: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO SITE PLA N PLA 11 Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane jUalley For City Use Only PLUS Project Number (;, Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK- BUILDING FILE REV 9/07 *Mune Deferred Documents Response to Review Comments Revisions to Application Other (Describe Below): PERMIT CENTER Project Transmittal 11703 E Sprague Ave. Suite B-3, Spokane Valley, WA 99206 Phone: 509.688.0036 Fax: 509.688.0037 ❑ Route to (Please check all that apply): Provide one of the following (REQUIRED FOR ACCEPTANCE): o, 003676 PLUS Project #: Parcel Number: Site Address: '2 3 // S /1 -ma .6 L.n1 Project Contact Information: Tiic&�uL POOLI'..Ot*A0 Email: \ t M() pOOL — (. O t 17 L t7 . f � Name: Relationship to Project: ❑ Architect NOTE: 0 Engineer Phone: 931- %.0S Fax: 0 Other Design Professional 4' Contractor 1 Owner / Applicant Bring all documents to the City of Spokane Valley Permit Center at 11703 E Sprague Ave - Suite B-3. We are sorry for any inconvenience, but documents brought elsewhere cannot be accepted. Effective June 10, 2009 Division # of Sheets/ Type of Document! # of Copies k Budding 2 / 51—�i,u s / ,= / / / / / / ❑ Development Engineering / / / / / / / / ❑ Planning / CSV r t-_ -i !`5'i ueNrEfl / 1 / , 0, it / --- 4 ❑ SV Fire Department 1, Project Contact Information: Tiic&�uL POOLI'..Ot*A0 Email: \ t M() pOOL — (. O t 17 L t7 . f � Name: Relationship to Project: ❑ Architect NOTE: 0 Engineer Phone: 931- %.0S Fax: 0 Other Design Professional 4' Contractor 1 Owner / Applicant Bring all documents to the City of Spokane Valley Permit Center at 11703 E Sprague Ave - Suite B-3. We are sorry for any inconvenience, but documents brought elsewhere cannot be accepted. Effective June 10, 2009 Summary SPOKANE COUNTY W A 5 H 1 N G T O N Home > County Index > Parcel Information Search > Parcel Summary Parcel Information Spokane County Courthouse 1116 West Broadway Avenue Spokane, WA 99260-0010 Contact Us Page 1 of 6 Help New Parcel Search New Sales Search Modify Parcel Search Summary Sketch Event/Notices Maps Parcel Photos Seq / Merge Taxes Permits Interactive Map Print Summary w/No Graphs All Data As Of : 11/13/2009 Parcel Number: 45261.1641 Parcel Maps with Aerial Photos OWNER INFORMATION Owner/Name Address 1 Address 2 City State Zip Country Address Change TADLOCK, TIMOTHY & CHRISTINA 13712 E EVERETT AVE SPOKANE WA 99216-3005 USA Change- Form TAXPAYER INFORMATION Taxpayer/Name Address 1 Address 2 City State Zip Country Name/Address Change TADLOCK, TIMOTHY & CHRISTINA 2311 S MARCUS LN VERADALE WA 99037 Change Form SITE ADDRESS INFORMATION Parce Type Address City Land Size Size Description Description Tax Year Tax Code Area Status Real 2311 S MARCUS LN VERADALE 15,426.00 Square Feet 11 Single Unit 2009 0144 Active TAX STATISTICS Levy Name I Levy Rate 2008 I Levy Rate 2009 I Levy Type I Tax 10 http://www.spokanecounty.org/pubpadal/ParcelSummary.aspx 11/13/2009 'Summary Page 2 of 6 County General 1.18 1.15 Non -Voted 0144 County General Cons Futures 0.04 0.04 Non -Voted 0144 County Library General 0.45 0.44 Non -Voted 0144 Fire District 01 1.50 1.44 Non -Voted 0144 Spokane Valley 1.49 1.50 Non -Voted 0144 State School 1.93 1.90 Non -Voted 0144 Fire District 01 Special 1.38 1.38 Voted 0144 SD356 Cen Valley B&I 1.48 1.46 Voted 0144 SD356 Cen Valley General 2.62 2.64 Voted 0144 Totals: 12.08 11.96 2009 Annual Taxes ® 1.147863 County General (9.6%) 1 0.04284746 County General Cons Futures (0.36%4) 1 0.4434125 County Library General (3.71 %) ❑ 1.442278 Fire District 01 (12.06%) 1 1.499892 Spokane Valley (12.54%) 1.89823 State School (15.87%) • 1.381789 Fire District 01 Special (11.56%) ® 1.459486 SD356 Cen Valley B8I (12.2%) 131 2.642461 SD356 Cen Valley General (22.1%) http://www.spokanecounty.org/pubpadal/ParcelSummary.aspx 1 1/13/2009 15.61 93 14.4$b434b8 .96084066 -- 12.08084896 11.95825959 • Summary Annual Assessed Value Page 3 of 6 $ 146,700.E $174,400 $227,300 300.00 4228,100.00 $21 1,800.00 Annual Levy Rate CHARACTERISTICS Is there an error in the data? Click here to tell your appraisers. Dwelling/ Structure Year Built Year Remodeled Main Floor Size Size Type House Type Stories Attic Base Roof Material Heat Cool Bedrms Half Bath Full Bath Dwelling 2002 0 1,612 SF 48 Ranch 1500-1799 1.0 NoneNone Comp sh medium Forced hot air -gas Central air 3 0 2 Basic allowance 1 Fireplace - gas 1 Attached Garage 0 0 Features/ 930 Structure SF Main Floor Size Size 0 Type 0 Basic allowance 1 Fireplace - gas 1 http://www.spokanecounty.org/pubpadal/ParcelSummary.aspx 11/13/2009 ' Summary Upper Roof Extension Canopy 182 Page 4 of 6 SF Upper Roof Extension Canopy 156 SF WDDK-R 182 SF WDDK-R 210 SF WDDK-R Assessor Description 156 SF Land Number Soil Id PTN NE1/4 26-25-44 TRT "D" OF SP -1271-01 Acreage Factor Frontage Depth Lot(s) 1 T1SL 0.00 15,426 0 1 SALES INFORMATION Sale Date Sale Price Market Value Use Value 0 1 50,000 0 Sale Instrument Excise Number 11/15/2001 30,000 00 Statutory Warranty Deed Sales History (prior to 1999) IVacant /Improved Sale Date I Sale Pricel Sale Instrument I Qualified /Unqualified 200117761A Transfer Type I Verification I Book I Page COMPARABLE SALES FOR TAX YEAR 2010 MORE ABOUT CCr House Type for Comparable Sales: 48 Ranch 1500-1799 Sq Ft Parcel Number Location Site Address YR Blt Sq Ft Sale Price Sale Date 4534;'.:^ 1 1 2 - Same General Area 3811 S VERCLER LN 2006 1588 $190,000 01/05/2009 VERA4 45342 33Q2 2 - Same General Area 3716 S MORROW LN 2007 1635 $297,000 12/01/2008 I 45244.2611 2 - Same General Area 859 SHELLEY LAKE LN 2003 1795 $390,000 07/16/2008 45251 0818 2 - Same General Area 2208 S STEEN RD 1996 1576 $401,500 05/29/2008 APPRAISAL INFORMATION Parcel Class Appraiser Contact Your Appraiser Appraisal Date Neighborhood Code Neighborhood Name Neighborhood Desc Appraiser Name Appraiser Phone 11 Single Unit 77 Click here to send a 1/26/2007 724555 VERA4 PLAT - VERADALE AND OTH Barbara 477-5915 Question to the appraiser Assessed Value Tax Year Land Dwelling / Structure Current Use Land Taxable Personal Prop Total Value 2010 50,000 178,100 0 228,100 0 228,100 2009 50,000 187,300 0 237,300 0 237,300 2008 40,000 187,300 0 227,300 0 227,300 http://www.spokanecounty.org/pubpadal/ParcelSummary.aspx 11/13/2009 Summary Page 5 of 6 2007 25,000 186,800 0 211,800 0 211,800 2006 25,000 149,400 0 174,400 0 174,400 2005 25,000 121,700 0 146,700 0 146,700 2004 25,000 121,700 0 146,700 0 146,700 2003 25,000 121,700 0 146,700 0 146,700 2002 8,980 0 0 8,980 0 8,980 PROPERTY TAXES There are no active exemptions. Tax Year Charge Type Annual Charges Remaining Charges Owing 2009 AN Property Tax 2,837.69 0.00 2009 Aquifer Principal HOUSE 15.00 0.00 2009 Soil Conservation Principal CNSV3 5.00 0.00 2009 Stormwater Principal Spokane Valley RES1 21.00 0.00 2009 Weed Control Principal WCWEED3 3.00 0.00 Sum 2,881.69 0.00 2008 AN Property Tax 2,745.98 0.00 2008 Aquifer Principal HOUSE 15.00 0.00 2008 Soil Conservation Principal CNSV3 5.00 0.00 2008 Stormwater Principal Spokane Valley RES1 21.00 0.00 2008 Weed Control Principal WCWEED3 3.00 0.00 Sum 2,789.98 0.00 2007 AN Property Tax 2,745.10 0.00 2007 Aquifer Principal HOUSE 15.00 0.00 2007 Soil Conservation Principal CNSV3 5.00 0.00 2007 Stormwater Principal Spokane Valley RES1 21.00 0.00 2007 Weed Control Principal WCWEED3 3.00 0.00 Sum 2,789.10 0.00 2006 AN Property Tax 2,526.43 0.00 2006 Aquifer Principal HOUSE 15.00 0.00 2006 Soil Conservation Principal CNSV3 5.00 0.00 2006 Stormwater Principal Spokane Valley RES1 20.00 0.00 2006 Weed Control Principal WCWEED3 3.00 0.00 Sum 2,569.43 0.00 Total 11,030.20 0.00 http://www.spokanecounty.org/pubpadal/ParcelSummary.aspx 11/13/2009 • Summary Page 6 of 6 Hours Phone Fax E -Mail Spokane County Assessor's Office 1116 West Broadway Avenue County Courthouse, 1st Floor Spokane, WA 99260 Monday -Friday 8:30am - 5:OOpm (excluding holidays) (509) 477-3698 (509) 477-3697 AssessorAspokanecounty.orq Hours Phone Fax E -Mail Spokane County Treasurer's Office PO Box 199 Spokane, WA 99210-0199 Monday - Friday 8:30am - 5:OOpm (excluding holidays) (509) 477-4713 (509) 477-3674 Treasurer@spokanecounty.orq http://www.spokanecounty.org/pubpadal/ParcelSummary.aspx 11/13/2009 PLANNING DEPT. APPROVED BY: 7 - DATE: !036,v09 0-sa •9 any Lfl R GSV PES' u Nfl'� Project 1_ Name _ Subrr a CIO