HomeMy WebLinkAbout2009, 12-11 Permit App: 09003676 PoolProject Number: 09003676 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 12/11/2009 Page 1 of 2
Project Information:
Permit Use: IN GROUND POOL Contact: POOL WORLD INC.
Address: 13524 E SPRAGUE AVE
C - S - Z: SPOKANE, WA. 99216
Setbacks: Front Left: Right: Rear: Phone: (509) 928-6585
Group Name:
Site Information: Project Name:
Plat Key: Name: Range
District: East
Parcel Number: 45261.1641
SiteAddress: 2311 S MARCUS LN
Location:: CSV
Zoning: R-2
Block: Lot:
Owner: Name: TADLOCK, TIMOTHY & CHRISTI
Address: 13712 E EVERETT AVE
SPOKANE, WA 99216-3005
SF Res Suburban District
Water District: 010 VERA
Area: 15,426 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:�_
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
[Released By:
Originally Released: 12/10/2009 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:
Originally Released: 11/13/2009 By: mpalaniuk
Contractor: POOL WORLD INC
Address: PO BOX 14927
SPOKANE, WA 99214
Item Description
SWIM POOL > 5000 GAL
Swimming Pool
Firm: POOL WORLD INC
Phone: (509) 928-6585
Units Unit Desc
1 SELECT
Fee Amount
$52.00
Permit Total Fees: $52.00
Operator: JD Printed By: JD Print Date: 12/11/2009
Project Number: 09003676 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 12/11/2009 Page 2 of 2
Notes•,,
Payment Summary �4 _�
Permit Type
Swimming Pool
Fee Amount Invoice Amount Amount Paid Amount Owing
$52.00 $52.00
$0.00 $52.00
$52.00 $52.00 $0.00 $52.00
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed 13y: JD Print Date: 12/11/2009
pokane
jValley�
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER:, `(
PERMIT FEE:
New Construction
Addition/Remodel
Other:
Accessory Bldg
Deck
SITE ADDRESS: ( J 0\ A �l 5 t -"J
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
DIMENSIONS:
Name: Jy.,� t.c) '/LC. ��
/3 1 i
Name. —Ft M
\2.
L Do/�_
2"" FLOOR SQ. FTG:
Address:
31 t
S yi pi2L V S L
Phone: 12v _ 6 j S Fax:
City: G (90 (,J4
L/AL ts'� State: t ,��P
Zip: 5"9L"�
Phone: Crag _ 6
- Fax:
HEAT SOURCE:
Contact Person
Name: 1-, 1-0104.49c., l,L
Phone: 4 34 -
Describe the scope of work in detail:
Contractor:
DIMENSIONS:
Name: Jy.,� t.c) '/LC. ��
/3 1 i
TOTAL HABITABLE SPACE:
Address: /-3..--ii g 69A{/q‹ (it
2"" FLOOR SQ. FTG:
City: P016/ 1I/A-&-ei-f Stater.
Zip: 0/ c,, %<
Phone: 12v _ 6 j S Fax:
GARAGE SQ. FTG:
Contractor Lic No: Exp Date:
P-cc.-c.)i -2i-// CP too
30% SLOPES ON
PROPERTY:
City Business Lic. No:
CONSTRUCTION TYPE:
(�
Cost of Project: $f 030
l4� CZ()-6j:k2r_) ,JtvnMrA;1 dooL,
Proposed Use:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2"" FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed. - - - -
ۥ
i..1
SIGNATURE:
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
❑ Mastercard
Expires:
DATE:
0 VISA
VIN#:
Cay 6 (3,3Con
1
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
O Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing
o Header, beam or concrete lintel sizes
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
O Stairway tread rise & run and nosing
o Window and door location and sizes
o Window well locations if applicable
o Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
❑ Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
❑ Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
g\a'av
-'MtI1ey
Site Address: 2311 S MARCUS LN
Parcel Number: 45261.1641
Zoning: R-2
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
Water District: VERA
Newproject
•
Pmvious pre -app meet ' g 0
Plan revisions 0
Transmittalllate.
Friday, Nowmber/3, 2009
Project Number: 09003676
Applicant: POOL WORLD INC.
13524 E SPRAGUE AVE
SPOKANE, WA. 99216
(509) 928-6585
e-mail:
Contact: POOL WORLD INC.
13524 E SPRAGUE AVE
SPOKANE, WA. 99216
(509) 928-6585
e-mail:
Contractor: POOL WORLD INC
PO BOX 14927
SPOKANE, WA 99214
(509) 928-6585
Owner: TADLOCK, TIMOTHY & CHRISTIN
13712 E EVERETT AVE
SPOKANE, WA 99216-3005
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
Project, 3ROUND POOL
Description,:
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
SITE PLA
N
PLA
11
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Spokane
jUalley
For City Use Only
PLUS Project Number (;,
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK- BUILDING FILE REV 9/07
*Mune
Deferred Documents
Response to Review Comments
Revisions to Application
Other (Describe Below):
PERMIT CENTER
Project Transmittal
11703 E Sprague Ave. Suite B-3, Spokane Valley, WA 99206
Phone: 509.688.0036 Fax: 509.688.0037
❑
Route to (Please check all that apply):
Provide one of the following (REQUIRED FOR ACCEPTANCE):
o, 003676
PLUS Project #:
Parcel Number:
Site Address:
'2 3 // S /1 -ma .6 L.n1
Project Contact Information:
Tiic&�uL POOLI'..Ot*A0
Email: \ t M() pOOL — (. O t 17 L t7 . f �
Name:
Relationship to Project:
❑ Architect
NOTE:
0 Engineer
Phone: 931- %.0S
Fax:
0 Other Design Professional 4' Contractor 1 Owner / Applicant
Bring all documents to the City of Spokane Valley Permit Center at 11703 E Sprague Ave - Suite B-3.
We are sorry for any inconvenience, but documents brought elsewhere cannot be accepted.
Effective June 10, 2009
Division
# of Sheets/ Type of Document! # of Copies
k
Budding
2 /
51—�i,u s
/ ,=
/
/
/
/
/
/
❑
Development Engineering
/
/
/
/
/
/
/
/
❑
Planning
/
CSV r t-_ -i !`5'i ueNrEfl
/
1 /
, 0, it
/
---
4
❑
SV Fire Department
1,
Project Contact Information:
Tiic&�uL POOLI'..Ot*A0
Email: \ t M() pOOL — (. O t 17 L t7 . f �
Name:
Relationship to Project:
❑ Architect
NOTE:
0 Engineer
Phone: 931- %.0S
Fax:
0 Other Design Professional 4' Contractor 1 Owner / Applicant
Bring all documents to the City of Spokane Valley Permit Center at 11703 E Sprague Ave - Suite B-3.
We are sorry for any inconvenience, but documents brought elsewhere cannot be accepted.
Effective June 10, 2009
Summary
SPOKANE COUNTY
W A 5 H 1 N G T O N
Home > County Index > Parcel Information Search > Parcel Summary
Parcel
Information
Spokane
County
Courthouse
1116 West
Broadway
Avenue
Spokane, WA
99260-0010
Contact Us
Page 1 of 6
Help New Parcel Search New Sales Search Modify Parcel Search
Summary Sketch Event/Notices Maps Parcel Photos Seq / Merge Taxes Permits Interactive Map
Print Summary w/No Graphs
All Data As Of : 11/13/2009
Parcel Number: 45261.1641
Parcel Maps with
Aerial Photos
OWNER INFORMATION
Owner/Name
Address 1
Address 2
City
State
Zip
Country
Address Change
TADLOCK, TIMOTHY & CHRISTINA
13712 E EVERETT AVE
SPOKANE WA
99216-3005
USA
Change- Form
TAXPAYER INFORMATION
Taxpayer/Name
Address 1
Address 2
City
State
Zip
Country
Name/Address Change
TADLOCK, TIMOTHY & CHRISTINA
2311 S MARCUS LN
VERADALE
WA
99037
Change Form
SITE ADDRESS INFORMATION
Parce
Type
Address
City
Land Size
Size Description
Description
Tax Year
Tax Code Area
Status
Real
2311 S MARCUS LN
VERADALE
15,426.00
Square Feet
11 Single Unit
2009
0144
Active
TAX STATISTICS
Levy Name I Levy Rate 2008 I Levy Rate 2009 I Levy Type I Tax 10
http://www.spokanecounty.org/pubpadal/ParcelSummary.aspx 11/13/2009
'Summary
Page 2 of 6
County General
1.18
1.15
Non -Voted
0144
County General Cons Futures
0.04
0.04
Non -Voted
0144
County Library General
0.45
0.44
Non -Voted
0144
Fire District 01
1.50
1.44
Non -Voted
0144
Spokane Valley
1.49
1.50
Non -Voted
0144
State School
1.93
1.90
Non -Voted
0144
Fire District 01 Special
1.38
1.38
Voted
0144
SD356 Cen Valley B&I
1.48
1.46
Voted
0144
SD356 Cen Valley General
2.62
2.64
Voted
0144
Totals:
12.08
11.96
2009
Annual Taxes
® 1.147863 County General (9.6%)
1 0.04284746 County General Cons Futures (0.36%4)
1 0.4434125 County Library General (3.71 %)
❑ 1.442278 Fire District 01 (12.06%)
1 1.499892 Spokane Valley (12.54%)
1.89823 State School (15.87%)
• 1.381789 Fire District 01 Special (11.56%)
® 1.459486 SD356 Cen Valley B8I (12.2%)
131 2.642461 SD356 Cen Valley General (22.1%)
http://www.spokanecounty.org/pubpadal/ParcelSummary.aspx 1 1/13/2009
15.61 93 14.4$b434b8
.96084066
-- 12.08084896
11.95825959
• Summary
Annual Assessed Value
Page 3 of 6
$ 146,700.E
$174,400
$227,300 300.00 4228,100.00
$21 1,800.00
Annual Levy Rate
CHARACTERISTICS
Is there an error in the data? Click here to tell your
appraisers.
Dwelling/
Structure
Year
Built
Year
Remodeled
Main
Floor Size
Size
Type
House Type
Stories
Attic
Base
Roof
Material
Heat
Cool
Bedrms
Half
Bath
Full
Bath
Dwelling
2002
0
1,612
SF
48 Ranch
1500-1799
1.0
NoneNone
Comp sh
medium
Forced hot
air -gas
Central
air
3
0
2
Basic
allowance
1
Fireplace - gas
1
Attached
Garage
0
0
Features/
930
Structure
SF
Main Floor
Size
Size
0
Type
0
Basic allowance
1
Fireplace - gas
1
http://www.spokanecounty.org/pubpadal/ParcelSummary.aspx
11/13/2009
' Summary
Upper Roof Extension Canopy
182
Page 4 of 6
SF
Upper Roof Extension Canopy
156
SF
WDDK-R
182
SF
WDDK-R
210
SF
WDDK-R
Assessor Description
156
SF
Land Number
Soil Id
PTN NE1/4 26-25-44 TRT "D" OF SP -1271-01
Acreage Factor Frontage Depth Lot(s)
1
T1SL
0.00
15,426
0
1 SALES INFORMATION
Sale Date
Sale Price
Market Value
Use Value
0
1
50,000
0
Sale Instrument
Excise Number
11/15/2001
30,000 00
Statutory Warranty Deed
Sales History (prior to 1999)
IVacant /Improved
Sale Date I Sale Pricel Sale Instrument I Qualified /Unqualified
200117761A
Transfer Type I Verification I Book I Page
COMPARABLE SALES FOR TAX YEAR 2010
MORE ABOUT CCr
House Type for Comparable Sales: 48 Ranch 1500-1799 Sq Ft
Parcel Number
Location
Site Address
YR Blt
Sq Ft
Sale Price
Sale Date
4534;'.:^ 1 1
2 - Same General Area
3811 S VERCLER LN
2006
1588
$190,000
01/05/2009
VERA4
45342 33Q2
2 - Same General Area
3716 S MORROW LN
2007
1635
$297,000
12/01/2008
I
45244.2611
2 - Same General Area
859 SHELLEY LAKE LN
2003
1795
$390,000
07/16/2008
45251 0818
2 - Same General Area
2208 S STEEN RD
1996
1576
$401,500
05/29/2008
APPRAISAL INFORMATION
Parcel
Class
Appraiser
Contact Your Appraiser
Appraisal
Date
Neighborhood
Code
Neighborhood
Name
Neighborhood Desc
Appraiser
Name
Appraiser
Phone
11 Single
Unit
77
Click here to send a
1/26/2007
724555
VERA4
PLAT - VERADALE
AND OTH
Barbara
477-5915
Question to the appraiser
Assessed Value
Tax Year
Land
Dwelling / Structure
Current Use Land
Taxable
Personal Prop
Total Value
2010
50,000
178,100
0
228,100
0
228,100
2009
50,000
187,300
0
237,300
0
237,300
2008
40,000
187,300
0
227,300
0
227,300
http://www.spokanecounty.org/pubpadal/ParcelSummary.aspx
11/13/2009
Summary
Page 5 of 6
2007
25,000
186,800
0
211,800
0
211,800
2006
25,000
149,400
0
174,400
0
174,400
2005
25,000
121,700
0
146,700
0
146,700
2004
25,000
121,700
0
146,700
0
146,700
2003
25,000
121,700
0
146,700
0
146,700
2002
8,980
0
0
8,980
0
8,980
PROPERTY TAXES
There are no active exemptions.
Tax Year
Charge Type
Annual Charges
Remaining Charges Owing
2009
AN Property Tax
2,837.69
0.00
2009
Aquifer Principal HOUSE
15.00
0.00
2009
Soil Conservation Principal
CNSV3
5.00
0.00
2009
Stormwater Principal
Spokane Valley RES1
21.00
0.00
2009
Weed Control Principal
WCWEED3
3.00
0.00
Sum
2,881.69
0.00
2008
AN Property Tax
2,745.98
0.00
2008
Aquifer Principal HOUSE
15.00
0.00
2008
Soil Conservation Principal
CNSV3
5.00
0.00
2008
Stormwater Principal
Spokane Valley RES1
21.00
0.00
2008
Weed Control Principal
WCWEED3
3.00
0.00
Sum
2,789.98
0.00
2007
AN Property Tax
2,745.10
0.00
2007
Aquifer Principal HOUSE
15.00
0.00
2007
Soil Conservation Principal
CNSV3
5.00
0.00
2007
Stormwater Principal
Spokane Valley RES1
21.00
0.00
2007
Weed Control Principal
WCWEED3
3.00
0.00
Sum
2,789.10
0.00
2006
AN Property Tax
2,526.43
0.00
2006
Aquifer Principal HOUSE
15.00
0.00
2006
Soil Conservation Principal
CNSV3
5.00
0.00
2006
Stormwater Principal
Spokane Valley RES1
20.00
0.00
2006
Weed Control Principal
WCWEED3
3.00
0.00
Sum
2,569.43
0.00
Total
11,030.20
0.00
http://www.spokanecounty.org/pubpadal/ParcelSummary.aspx
11/13/2009
• Summary
Page 6 of 6
Hours
Phone
Fax
E -Mail
Spokane County Assessor's Office
1116 West Broadway Avenue
County Courthouse, 1st Floor
Spokane, WA 99260
Monday -Friday 8:30am - 5:OOpm (excluding
holidays)
(509) 477-3698
(509) 477-3697
AssessorAspokanecounty.orq
Hours
Phone
Fax
E -Mail
Spokane County Treasurer's Office
PO Box 199
Spokane, WA 99210-0199
Monday - Friday 8:30am - 5:OOpm (excluding
holidays)
(509) 477-4713
(509) 477-3674
Treasurer@spokanecounty.orq
http://www.spokanecounty.org/pubpadal/ParcelSummary.aspx
11/13/2009
PLANNING DEPT. APPROVED
BY: 7 -
DATE: !036,v09
0-sa
•9
any Lfl
R
GSV PES'
u
Nfl'�
Project 1_
Name _
Subrr a
CIO