2008, 03-31 Permit App: 08001106 CarportProject Number: 08001106 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 3/31/2008 Page 1 of 2
Project Information:
Permit Use: 12 X 36 CARPORT
Setbacks: Front
Site Information:
Plat Key: 001132 Name: HARRINGTONS ADD TO HUTCH1I SON
Left: Right: Rear:
Contact: BUNKER BUILDINGS
Address: PO BOX 48287
C - S - Z: SPOKANE, WA 99208
Phone: (509) 468-8182
Group Name:
Project Name:
District: Nort
Parcel Number: 45184.1127
Block: Lot:
SiteAddress: 309 N MARGUERITE RD
Location:: CSV
Zoning: UR -3.5 Urban Residential 3.5
Water District: 999 UNKNOWN
Area: ,639.00 Acres Width: 185 Depth: 116 Right Of Way (ft): 40
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Owner: Name: HOY, GRETCHEN
Address: 309 N MARGUERITE RD
SPOKANE VALLEY, WA 99212
Hold: ❑
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 3/28/2008 By: tmelbourn
Landuse/Zoning/HE Conditions
Permits:
Released By:
Operator: JD Printed By: JD Print Date: 3/31/2008
Project Number: 08001106 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 3/31/2008 Page 2 of 2
Building Permit
Contractor: BUNKER BUILDINGS Firm: BUNKER BUILDINGS
Address: 1028 W ROSEWOOD
SPOKANE, WA
Phone: (509) 468-8182
This Application: Total Project:
Description Gtr Type Notes Sq Ft Valuation Sq Ft Valuation
CARPORT OP R-3 VB 448 $6,720.00 448 $6,720.00
Item Description
RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 448 $6,720.00 448 $6,720.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount
$139.25
$4.50
$55.70
$199.45
Notes:
BUNKER BLDG SUBMITTED APPLICATION FOR NEW 12 X 32 CARPORT WITH OLD
APPLICATION AND ILLEGIBLE SITE PLAN -RETURNED PACKET WITH CURRENT
APPLICATION AND ASKED FOR MORE LEGIBLE SITE PLAN -JM
Home Profession exemption - Gretchen Hoy - GEH Properties
Payment Summary
Permit Type
Building Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$199.45 $199.45
$0.00 $199.45
$199.45 $199.45 $0.00 $199.45
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 3/31/2008
Spokane
_ Ma11ey4
Community Development
Residential Construction New Construction n Accessory Bldg
Permit Application ❑ Addition/Remodel ❑ Deck
n Other:
11703 E Sprague Ave, Suite 13-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
r.C.IN_LV.I.1 1 iIviV.UJJL i.. I { ,
PERMIT FEE:
SITE ADDRESS:
30°1 IJ. .(9.)er'A -
ASSESSORS PARCEL NO: S I v - I��'�
LEGAL DESCRIPTION:
Building Owner:.
Name: �1.10
Address: -54A ms -c,
City:
State: Zip:
Phone:
Fax:
ontact Person,
Name:`� e-f`�
Phone: "l J S-3
Describe the scope of work in detail:
Contractors
Name: ,Qu c-, te, SiQe L R 1s3s . , /AG
Address: I c:;,2 t,,,, . fes -S, t,, „,09 f\ve
City: S' r s.,,,,e
State: (,,,,..,ik Zip: 91
Phone:tLj0., $1caZ
Fax: - B1Ct3
Cp tutc. or„j4c,l$ ctc,s.BE
Exp Date: i o5/
(3
City Business Lic. No: ‘0
9 5\ 30
Cost of Project: $ 3
Ac c- I • /'(- 3(7" open Cir o �+&)s4.„5+ �e.
i
Proposed Use: C x p��
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSIONS.
zyx32
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG: ,..,.
2 FLOOR SQ. FTG:
_...
UNFIN BASEMENT SQ. FTG:
— ' .
IMPERVIOUS SURFACE
AREA: ---,.
FINISHED BASEMENT
SQ. FTG:#
GA G Q. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON /e5
OF BEDROOMS:
CONSTRUCTION TYPE:
\/1
HEAT SOURCE: CPROP%
EWER 0 SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) AH construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
3
DATE:
❑ Mastercard ❑ VISA
Expires: VIN#:
•
zg
og
Spokane
jUalley�
For City Use Only
PLUS Project Number O`L, D R 0(le
Project Address = .11. a )---1 us,
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is t IL/ `fir L}
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK- BUILDING FILE REV 9/07
Siorkai
\iilley
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project/0
Previous pre -app meeting El
Plan revisions
Transmittal Date:
Friday, March 28, 2008
Site Address: 309 N MARGUERITE RD
Parcel Number: 45184.1127
Zoning: UR -3.5 Water District: UNKNOWN
Fire District: FD 01
Project Number: 08001106
Applicant: BUNKER BUILDINGS Owner: HOY, GRETCHEN
PO BOX 48287 309 N MARGUERITE RD
SPOKANE, WA 99208 SPOKANE VALLEY, WA 99212
(509) 468-8182
e-mail: e-mail:
Contact: BUNKER BUILDINGS Occupant:
PO BOX 48287 e-mail:
SPOKANE, WA 99208
(509) 468-8182
e-mail:
Contractor: BUNKER BUILDINGS
1028 W ROSEWOOD
SPOKANE, WA
(509) 468-8182
Arch / Engineer:
e-mail:
Project
Description: 12 X 36 CARPORT
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
SITE PLA
PLAN
8
Please send all plan review and project comments via e-mail to the
highlighted individuals.
0c,r Vere.
14ay
MI:).
/L�T
6' ls'
5-1+ 1 — - - -1--I
4 pn Co.c- pork ,N-
� 3a'
7o'+
r E�
So
C et+
130'
p
PLANNING DEPT. APPROVED
BY. AZT71-6PIL
DATE: z/3//2-40 °L5'
3S0o ,-13S7
5 '-4-
Asj /L,4.
y
WAMBEKE ENGINEERING
Daniel Wambeke, P. E. Spokane, WA 99223
2913 East 61st Court
Telephone: 509-443-6186 • Fax: 509-448-6582 • dwambeke @msn.com
STRUCTURAL DESIGN DRAWINGS
FOR
14' X 32' X 8' POST FRAME BUILDING LEAN-TO ADDITION
TO EXISTING RESIDENCE
FOR
HOY PROJECT
SPOKANE VALLEY, WASHINGTON
JOB NO. BB -1626
PREPARED FOR
BUNKER STEEL BUILDINGS, INC.
SPOKANE, WASHINGTON
March 24, 2008
EXPIRES (L' 1R -C21
Designer of Small Structures. Post Frame Buildings. Foundations.
Light Gauge Steel Framing and Grain Storage Systems
ATTACH 2X8 LEDGER
TO EXISTING STUD
FRAMED HOUSE
W/3 -16D NAILS INTO
EACH STUD.
A
5' CANTLE VER
---- OPEN ----
16' 14'
I -
m
HOY
BB1626
14X32X8 +/- 2:12
fj2-2Xe
/LEDGER
//
2X8 JOISTS 19.2" O.C.
HANGERED TO
LEDGER AT HOUSE.
EXISTING
HOUSE
0
m
z
1
2X8 JOISTS
.19.2" O.C.
12'
12
12'
_L----OPEN---
14' LEAN TO
0
-a
m
z
J
2' OVERHANG
EXPIRES t [ rl4•-c'
I Q0
w
N
m
r
PAGE 1
TREATED PO5'C
I.P.22 .60 RETENTION
GRADE
CONCRETE
USE IN THIS
ORDER
'.CENTRAL PREMIX
533-0208
2. SPOKANE ROCK PROD
244-5421
3. INTERSTATE
292-8600
4. TONERS
292-2360
6 POSTS
4
i
1
1
4
1 d
V
II
1!JIi11iJF HLL;
•
a
4
a '
(4
SEE .HE LOw
POST FOOTING SCHEDULE
0
r
EXPIRES (Z' Ly�
ORDER YARDS POST MIX CONCRETE
'IF ORDERING LESS THAN 4 YARD8
FROM ANYONE BUT CENTRAL
PREMIX CALL OFFICE FIRST"
JOS INFO.
NAME
P.O. #
HOY
BE. 1626
LOCATION
POST SIZE.
DIAMETER
DEPTH
YDS. PER
TOTAL
SECTION 1 A
C!/ .. (,
3'
U' Z
0
SECTION B
6 ��,
3'
0. ZS
1.7,5-. '
-t'
A
,
PAGE 2
SECTION A 1
SECTION 5 j
OPEN
- -
i
I EXISTING HOUSE
5' ----i
.HOY
BB1626
14X32X8+/- 2:12
ROOF AREA
7/16" OSB.FELT & METAL
OPEN
21 -11 -
OPEN 11
OPEN
OPEN
SECTION B
SECTION 1
EXISTING ROOF
2FIT-
OPEN
`EXPIRES C ' 7-41`v
2X8 JOISTS
19.2" O.C.
EXISTING
WALL
EXISTING
1X4 WINDOW
TRIM
ATTACH 2X8 LEDGER
JUST ABOVE 1X4
WINDOW TRIM
2-2X8 LEDGERS
FACIA
TRIM
10' +/- PEAK
'TT
7'-8 +/- EAVE
PAGE 3
2X8 JOISTS 19.2" O.C. LAYOUT I
EXISTING
HOUSE
BUILDER NOTE:
ATTACH LEDGERS AT SEC. 8 2,3,4 T6
POST W/1 -BOLT & 8-16D NAILS.
ATTACH LEDGER TO SEC. 1+5 B
W/8 -16D NAILES EACH LEDGER TO
POST.
ATTACH SEC. 1 A W/8 -16D NAILS
LEDGER TO POST,
USE HURRICANE CLIPS TO ATTACH
JOIST TO LEDGER SEC.B,
JOIST HANGER AT SEC, A
L
11
l
2X8 LEDGER
3-16D NAILS INTO
EXISTING 24" O.C.
STUDS
1L1
t 0
2-2X8 LEDGERS
0
r-
r -
8'
8'
8,
8'..
8'
8'
8'
8'
8'
8'
8'
8'
8'
8'
16'-3"
ROOF 7/16" OSB LAYOUT
HOY
BB1626
14X32X8+/- 2:12
EXPIRES l2
PAGE 4
PROVIDE DIAGRAMS AND
ENGINEERING LAYOUTS FOR
ROOF TRUSSES, BEAMS AND
FLOOR SYSTEMS PRIOR TO FRAMING
CT IONS
CITY COPY
THIS BUILDING SUBJECT
TO FIELD INSPECTION CORRECTIONS
y TEVr:
'D!VISEON
rfiii