Loading...
2008, 03-21 Permit App: 08001014 Finish BasementProject Number: 08001014 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/21/2008 Page 1 of 2 Project Information: Permit Use: FINISH BASEMENT Setbacks: Front Left: Site Information: Plat Key: 006175 Name: Right: Rear: Contact: Address: C - S - Z: Phone: Group Name: Project Name: CHRISTIANSON, JULIE A 307 N MANIFOLD LN SPOKANE VALLEY, WA 99016 (509) 216-1702 LONGVIEW' PUD District: East Parcel Number: 55192.2703 Block: 6 SiteAddress: 307 S MANIFOLD LN Location:: CSV Zoning: UR -3.5 Water District: 008 Area: 6,332 Sq Nbr of Bldgs: 1 Review Information: Lot: 3 Owner: Name: CHRISTIANSON, JULIE A Address: 307 N MANIFOLD LN SPOKANE VALLEY, WA 99016 Urban Residential 3.5 CONSOLIDATED IRRG #1 Hold: ❑ Ft Width: 55 Depth: 112 Right Of Way (ft): 32 Nbr of Dwellings: 1 Review Building Plan Review Released By: Permits: ®. Originally Released: 3/21/2008 By: tmelbourn Contractor: J AND R'S FLOORS AND MORE Address: 5508 DAY SPRING LANE CHATTAROY WA 99003 Description Grp Type Notes BASEMENT R R-3 VB Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW <7999 SQ FT Operator: JD Building Permit Firm: J AND R'S FLOORS AND MORE I Phone: (509) 238-4988 This Application: Sq Ft Valuation 216 $1,080.00 Total Project: Sq Ft Valuation 216 $1,080.00 Totals: 216 $1,080.00 216 $1,080.00 Units Unit Desc Fee Amount 1 SELECT $69.25 1 SELECT $4.50 1 SELECT $27.70 Printed By: jmm Permit Total Fees: Print Date: $101.45 - 3/21/2008 Project Number: 08001014 Inv: 1 Notes • Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/21/2008 Page 2 of 2 Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $101.45 $101.45 $0.00 $101.45 $101.45 $101.45 $0.00 $101.45 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 3/21/2008 Spokane Valley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER: ' \ y PERMIT FEE: New Construction n Addition/Remodel Other: Accessory Bldg Deck SITE ADDRESS: 3 6 ? S.. /Y `/ 4 1 L1 l al Len 5-,PakI/ a J! C (� / Wt4" L l C ai {, I / ASSESSORS PARCEL NO: 'S-5"/9".2.. .z 7 03 LEGAL DESCRIPTION: (l -,ZS' Kt L 110"-/ Buildirig"Owner „'. 3 //t. ...,_, J-; ;:. r '.: ,` Cont actor` 4' t .' 'Utr :' '::`/V,ri✓t';C'-" l=iiAir Name: Ul✓Yt 1.4t12d Address: IQ o 6 dx 43 7 Name: Lie, CMR !s <f}'/OSa ..)u Address: 30 7 1 `-en a", -r4 « 1-41 City:sp&lGGn2. V l -e-7 State:.; Zip: c, j City: /`/ _lricon State: w4 Zip: 9,0,4 \ n., a'�i�� Phone:trSGt`G 3 / cf iy� Fax: I Phone: q1�j ef ? 1 y Fax: IMPERVIOUS SURFACE AREA:/�' �� Conti k-sL! ii ? .41 y4 if Exp Date: 7 _ 2s- L vu� :Contact Person' .n`'Is1; „'" `:1" '- ?,:"' t`; `.: DECK//Cyy ,Prfl S FTG: (SEWER City Business Lic. No: # OF BEDRCPIOM�. CONSTRU TI TYPE: HEAT SOUR 6 --CIS d?Lite vt ot Name: �' tr1A,1Le_ Cl -{7C1 ctt SPC\ Phone: S0c1• 91'( 472 -Zi Describe the scope of work in detail: Cost of Project: $ rllCR �lncr/�.r� �r. tva.bl lv Proposed Use: %ca n/t l too vv1 **************The following MUST be complete: ,o ea t.0 T evn1 ac to c.l,f ‘,/,51-4‘,/,51-4rta e,c-n-cJ4 d- nd /,.rrPf ac •-` 44-0-4.-12 ✓ rc .( :$ t 1A �-. 2t a..rr✓ ie tn/c..11 GwC�C 1K/I cci £ L. 4-).- t OtA4 t 4-5 (write N/A if not applicable)********************** HEIGHT Tlp EAK: DIM NSIONS: Any a t z. ` wQ. # OF STO E ://T1 TOTAL HATABLE SPACE: MAIN FLOO� /� SQ. FTG: / /J 2"'FLOOR FTG: ,2j/ UNFIN BA ENT SQ. FTG: IMPERVIOUS SURFACE AREA:/�' FINISHED Bp(SE E 2� RAGE Q TG: DECK//Cyy ,Prfl S FTG: (SEWER 30%SLOPES..OTN PROPERTY: # OF BEDRCPIOM�. CONSTRU TI TYPE: HEAT SOUR 6 --CIS d?Lite vt ot OR SEPTIC? cS—e, t.2J eCi� The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additio al information may be required to be submitted, and subsequently approved before this application can . • .rocessed. SIGNATUR Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2115/07 0 Check DATE: 3 - 2/- GC ❑ Mastercard 0 VISA Expires: VIN#: Spokanet 11703 E Sprague Ave Suite B 3♦ Spokane Valley WA 99206 ♦509.688.0036 1 Fax: 509.688.0037 jValley® EX Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. • Show the height of any proposed buildings or accessory structures. ElFloor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. Floor framing details: Joist type, size, spacing and installation details. ❑X Roof framing plan and details �X Furnace and hot water heater location M. All header locations: type, size and connections Foundation plan ❑X Insulation information Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space abcess One-hour separation detail: between house and garage .17alley® • For City Use Only PLUS Project Number niSriThI f I4 Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 " 509.688.0036 • Fax: 509.688.0037 t permitcenter®spokanevaltey.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. \-2-7 I Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a,Smoother Project Application Review Submit complete, accurate plans and documents. Extra tune may be required for re -submittals as project application reviewers work on multiple applications and it mal' be several days before they can look at your neve or revised information. i Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can he changed, one individual with the expertise fan. dealing with reviewer comments would he the hest choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top, of the page. Although you .should he contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff into, contact you before the target date if the initial review is complete.. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure -that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started.. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it conies up for review. • 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should -be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK- BUILDING FILE REV 9/07 WASHINGTON STATE ENERGY CODE TABLE 6-2 PRESCRIPTIVE REQUIREMENT S°'1 FOR GROUP R OCCUPANCY CLIMATE ZONE 2 * Reference Case 0. Nominal R -values are for wood frame assemblies only or assemblies built in accordance with Section 601.1. 1. Minimum requirements for each option listed. For example, if a proposed design has a glazing ratio to the conditioned floor area of 13%, it shall comply with all of the requirements of the 15% glazing option (or higher). Proposed designs which cannot meet the specific requirements of a listed option above may calculate compliance by Chapters 4 or 5 of this Code. 2. Requirement applies to all ceilings except single rafter or joist vaulted ceilings complying with note 3. 'Adv' denotes Advanced Framed Ceiling. 3. Requirement applicable only to single rafter or joist vaulted ceilings where both (a) the distance between the top of the ceiling and the underside of the roof sheathing is less than 12 inches and (b) there is a minimum 1 -inch vented airspace above the insulation. Other single rafter or joist vaulted ceilings shall comply with the "ceiling" requirements. This option is limited to 500 square feet of ceiling area for any one dwelling unit. 4. Below grade walls shall be insulated either on the exterior to a minimum level of R-12, or on the interior to the same level as walls above grade. Exterior insulation installed on below grade walls shall be a water resistant material, manufactured for its intended use, and installed according to the manufacturer's specifications. See Section 602.2. 5. Floors over crawl spaces or exposed to ambient air conditions. 6. Required slab perimeter insulation shall be a water resistant material, manufactured for its intended use, and installed according to manufacturer's specifications. See Section 602.4. 7. Int. denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation. 8. This wall insulation requirement denotes R-19 wall cavity insulation plus R-5 foam sheathing. 9. Doors, including all fire doors, shall be assigned default U -factors from Table 10-6C. 10. Where a maximum glazing area is listed, the total glazing area (combined vertical plus overhead) as a percent of gross conditioned floor area shall be less than or equal to that value. Overhead glazing with U -factor of U=0.40 or less is not included in glazing area limitations. 11. Overhead glazing shall have U -factors determined in accordance with NFRC 100 or as specified in Section 502.1.5. 12. Log and solid timber walls with a minimum average thickness of 3.5" are exempt from this insulation requirement. Effective July 1, 2007 34 Glazin U -Factor Door s U -Factor Ceiling Vaulted Ceiling' Wallt2 Above Grade Wall• a int Below Grade Wall• ext a Below Grade Floors Slabe on Grade Option Glazing Area10: % of Floor Vertical Overhead„ I. 12% 0.35 0.58 0.20 R-38 R-30 R-21 int' R-21 R-12 R-30 R-10 II.* 15% 0.35 0.58 0.20 R-38 R-30 R-19 + R-58 R-21 R-12 R-30 R-10 III. 17% 0.32 0.58 0.20 R-38 R-30 R-19 + R-58 R-21 R-12 R-30 R-10 1v. 25% Group R-1 and R-2 Occupancies Only 0.35 0.58 0.20 R-38 / U=0.031 R-30 / U=0.034 R-21 int' / U=0.054 R-15 R-12 R-30 / U=0.029 R-10 ! F=0.54 V. Unlimited Group R-3 and R-4 Occupancies Only 0.35 0.58 0.20 R-38 R-30 R-19+ R-58 R-21 R-12 R-30 R-10 VI. Unlimited Group R-3 and R-4 Occupancies Only 0.30 0.58 0.20 R-49 or R-38 R-21 R-21 R-12 R-30 R-10 R-38 Adv int' VII. Unlimited Group R-1 and R-2 Occupancies Onl\ 0.32 0.58 0.20 R-38 / U=0.031 R-30 / U=0.034 R-21 int' / U=0.054 R-15 R-12 R-30 / U:).029 R-10 F=0.54 * Reference Case 0. Nominal R -values are for wood frame assemblies only or assemblies built in accordance with Section 601.1. 1. Minimum requirements for each option listed. For example, if a proposed design has a glazing ratio to the conditioned floor area of 13%, it shall comply with all of the requirements of the 15% glazing option (or higher). Proposed designs which cannot meet the specific requirements of a listed option above may calculate compliance by Chapters 4 or 5 of this Code. 2. Requirement applies to all ceilings except single rafter or joist vaulted ceilings complying with note 3. 'Adv' denotes Advanced Framed Ceiling. 3. Requirement applicable only to single rafter or joist vaulted ceilings where both (a) the distance between the top of the ceiling and the underside of the roof sheathing is less than 12 inches and (b) there is a minimum 1 -inch vented airspace above the insulation. Other single rafter or joist vaulted ceilings shall comply with the "ceiling" requirements. This option is limited to 500 square feet of ceiling area for any one dwelling unit. 4. Below grade walls shall be insulated either on the exterior to a minimum level of R-12, or on the interior to the same level as walls above grade. Exterior insulation installed on below grade walls shall be a water resistant material, manufactured for its intended use, and installed according to the manufacturer's specifications. See Section 602.2. 5. Floors over crawl spaces or exposed to ambient air conditions. 6. Required slab perimeter insulation shall be a water resistant material, manufactured for its intended use, and installed according to manufacturer's specifications. See Section 602.4. 7. Int. denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation. 8. This wall insulation requirement denotes R-19 wall cavity insulation plus R-5 foam sheathing. 9. Doors, including all fire doors, shall be assigned default U -factors from Table 10-6C. 10. Where a maximum glazing area is listed, the total glazing area (combined vertical plus overhead) as a percent of gross conditioned floor area shall be less than or equal to that value. Overhead glazing with U -factor of U=0.40 or less is not included in glazing area limitations. 11. Overhead glazing shall have U -factors determined in accordance with NFRC 100 or as specified in Section 502.1.5. 12. Log and solid timber walls with a minimum average thickness of 3.5" are exempt from this insulation requirement. Effective July 1, 2007 34 Paye ---1 ;-1 `EG y f' - 3 B(rdc. c.� �ss'/9z-2'15i Egress windows open. ble 5.7 sq. ft. - 44" sill creo-e) - 6JA' kor,,t9colv`, MOKE ALARMS SHALL BE INTERCON- NECTED AND HARD WIRED IN SUCH A MANNER THAT THE ACTIVATION OF ONE ALARM WILL ACTIVATE ALL ALARMS. (BEDROOMS, AREAS APPROACHING BEDR..)0MS, VAULTED CEILING WITH RISE OF 24' & ON EACH FLOOR) EMERGENCY EGRESS REQUIREMENTS FROM SLEEPING ROOMS 1) NET CLEAR OPENING 5 7 SQUARE FEET GRAIN MOOR OPENING (MAX 441 5 0 SQUARE FEET 2) Ni 1 Ct EAR OPENING HEIGHT 24 INCHES 3' Nt T riEAR OPENING WID1H 20 INCHES 4 •NISHEh SI(L HEIGHT 44' Ai;OVE FLOOR PI; MLI) NC Y usc APE & RESCUE OPENING SHALL 6E '1 ••.ATI,:N.: ', i Rt ;HE 'MUM OF THE ROOM WITHOUT 1.0 ''SE 1.11 't YS 1i; TOOLS 3 � � FK�Sr+^'FA A( T Z I« (t 'exr,n`o- L,., ALL J •-• PT )k:A 5, 302 M4(31,1IFai,L7 A* EXHAUST FANS 100.tFM kitchen & 135 JET Ta`icT E. 4,‘ o k rsr,.1+► F1 At iodic doge F"-' co KF 4= tUld caNWA^* cgn1 GJ11'R OT i-eoTlNsr 2. o-� 3A . EMERGENCY EGRESS REQUIREMENTS FROMPINIO ROOMS 1► NET CLEAR OPENING: 5.1 SQUARE FEET GRADE FLOOR OPEIMNS OAK 44') 5.0 SQUARE FEET 2) NET CLEAR OPEIPNG+ HEIGHT 24 INCHES 3) NET CLEAR OPENINSWIDM 20 INCHES 4)MAXFINISHED SILL MEW 44'AVM MOOR 51 EMERGENCY ESCAPE Mena OPEINN MIT OPERATIONAL FROM 11E Of OE ROOM THE USE Of KEYS OR TOOLS WHEN INTERIOR ALTERATIONS, REPAIRS OR ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROJMS ARE ADDED OR CREATED IN EXISTING DWELLINGS. THE DWELLING UNIT SHALL BE PROVIDED WITH SMOKE ALARMS LOCATED AS REQUIRED FOR NEW DWELLINGS. MOKE ALARMS SHALL SE INTERCON- ECTED AND HARD WIRED IN SUCH A MANNER THAT THE ACTIVATION OF ONE ALARM WILL ACTIVATE ALL ALARMS. BBAREAS APPROACHING WITH RISE OF 24' & ON EACH FLOOR) bu Egress windows:onabi. 5.7 sq. ,ft.;/ 44" si11 , l t.1'OOP r El, scrim 4- 6-442-46 1-5- PROTECTION AND OPEN'NGS BETWEEN DWELLING AND PRIVATE GARAGE SHALL HAVE: 1) MATERIALS APPROVED FOR ONE HOUR FIRE RESISTIVE CONSTRUCTION ON THE GARAGE SIDE: O 5/8' TYPE'X' GYP BOARD (HABITABLE SPACE ABOVE) OR O 1/2' GYP RO rRD (RESIDENCE/ATTIC. FLOOR/CEILING) 2) OPENINGS BETWEEN GARAGE AND RESIDENCE SHALL BE EQUIPPED WITH SOLID WOOD DOOR, SOLID OR HONEYCOMB CORE STEEL DOORS NOT LESS THAN 1 3/5-. OR 20 MINUTE FIRE RATED DOORS. CITY COPY THIS BUILDING SUBJEQT TO FIELD INSPEGTIbN CORRECTIONS sdreWalley REVIEWED FOR GODE COMPLIANCE SPOKANE VALLEY E )ILDINpr DIVISION Tim la