2008, 07-11 Permit: 08003777 SewerSPOKAN Cout'ux
SPOKANE COUNTY
DEPARTMENT OF BUILDING & PLANNING
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Information
Project Information
Site Address: 11810E MARIETTA AVE
Parcel Number: 45091.3012
Subdivision: RANGE
Block: 3
Lot: 12
Zoning: UNK Unknown
• Owner: HAYDEN HOMES
Address: 2464 SW GLACIER
REDMOND. OR 97756
Building Inspector:
, Water Dist: IRVIN
Project Number: 08003777 Inv: I Issue Date: 7/11/2008
Permit Use: SEWER CONNECTION - VIEW RANCH ESTA'T'ES
Applicant: DEAN'S EXCAVATION
PO BOX 698
DAVENPORT, WA 99122
. Contact: DEAN'S EXCAVATION
- PO BOX 698
DAVENPORT. WA 99122
Setbacks - Front: Left: Right:
Group Name:
Project Name:
Phone: (509) 721-1020
Phone: (509) 721-1020
Rear:
Permits
Sewer Connection Permit
Contractor: DEAN'S EXCAVATING License #: DEANSE*924}3'1'
SEWER CONNECTION
I $85.00 PROCESSING FEE 1 $15 00
Total Permit Fee: $10000
FOR SEWER INSPECTIONS CALL THE UTILITIES DI3Pi%AT (509) 477-3604 FROM 8.30-5.00 MONDAY -FRIDAY PRIOR TO
COVER. ONE WORKING DAY NOTICE RE'QUIRE'D. 1'I3RMI11. ALLOWS FOR A 30 -MINUTE INSPECTION ADDITIONAL,
INSPECTION FEES APPLY AFTER 30 MINUTES. iH-t Jt
TFII3 INSTALLER IS RESPONSIBLE TO INSURE ALL,WASIIE:WA'FER DRAINS ARE CONNECTED TO TI113 SEWER AND
MAY 1313 REQUIRED TO PERFORM TESTS FOR,VERIFICA'FION.-INSTA_LI:ER IS TO FIELD LOCATE AND CONFIRM THE
ELEVATION AND POSITION OF SEWER STUB PRIOR' 1'O ANY OTHER EXCAVATION.
SEWER STUBS ARE TO BE CHECKED PRIOR,JI.0 CONNI:CIION;FO''ENSURE THAT THEY HAVE ACCEPTABLE GRADE.
AND ARE CLEAR AND UNOBSTRUCTED TO "11113 MAINNSEWER'EINESOSHODULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OI"TI IE 3TRUCTURFi.' ��,
SR±i flti nTIIE INSTALLER AND THIS PERMIT MUS'I;I3E'PRESENRAT=1'HE'J0B SITE-yAT_TTIE SCHEDULED INSPECTION TIME.
BOTH STATE LAW RC\V 19.122 AND COUNTY CODE'REQUIRES'THE'4NSTAILLER TO GIVE NOTICE OF EXCAVATION TO
OWNERS OF UNDERGROUND FACILITIES.
CALL 1-800-424-5555 BEFORE YOU DIG�`,YI EAST 21 WORKING DAYS IN-AO� 'ANCE. SPOKANE COUNTY CODE
REQUIRES TI11: INSTALLER COMPLY W FDI VALISEREQUIREMEN'1'S�OFNFUE'�VA STATE DEPT OF LAI3012 & INDUSTRIES.
INCLUDING 'I'IiOSE RELATED TO TRENCI I SAFETY.
Payment Summary
Total Fees AmountPaid AmountOwing
$100.00 $100.00
$0 00
Tran Date Receipt #
7/11/2008
3238
Payment Amt
$100.00
Notes I Conditions of Approval
FELTS FIELD AIRPORT OVERLAY ZONE
FIRI3 DISTRICT #I - PLAN REVIEW FEE IS REQUIRED FOR ALL SITE PLAN REVIEWS CONDUCTED 13Y PD #l.
Processed By: CUMMINGS. KATHY
Printed By: Lcmlcy. Linda
Page I of 1
PERMIT
NOTICE
It is the responsibility of the applicanUpermittee to see to it that the use described on the front of this permit complies with applicable codes and
requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's
or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Front, flanking, side and rear yard setbacks are measured from property lines. Curb lines and fence lines are not necessarily indicative of
property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/
curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authonzed
representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your
structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is in place, plumbing, mechanical rough -in inspections have been approved, and prior to
concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ("208 swales'), road improvements, parking, and landscaping are common requirements of a permit/site plan which
must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - In addition to Foundation inspections prior to pouring pads, inspection of blocking, tie -downs, stairs, handrails,
skirting, etc., installations when completed per manufacturers installation instructions; Final inspection approval prior to occupancy: completed Wains
Tag(s) must be affixed to the home and completed inspection record card and manufacturers installation instructions must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Department
of Building & Planning
477-3675
• Construction in a flood plain, Division of Engineering & Roads
477-3600
• Electrical wiring, State Department of Labor and Industries
324-2640
• On-site waste disposal system, Spokane Regional Health District
324-1560
• Road cuts for utilities or driveways, Division of Engineering &
Roads - 48-HOUR NOTICE REQUIRED
477-3600
or State Department of Transportation
456-3000
• Sewer connection, Division of Utilities
477-3604
or City Public Works Department
625-6300
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, building, plumbing, fire and mechanical permits will be considered null and void by limitation if the work authorized by
the permit is not commenced within 180 days or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and
approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity
of the permit. Please call if you have any questions concerning the validity of your permit. Please contact the other agencies with respect to their refund
policy on all other permit types.
All requests for building permit refunds must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the
date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No
refunds may be authorized more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please
bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Department of Building and Planning at the below address.
Spokane County Department of Building & Planning
1026 West Broadway Avenue
Spokane, WA 99260
Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133 REVISED 06/07 BLDG PERMIT