Loading...
2008, 09-11 Permit App: 08003461 ResidenceProject Number: 08003461 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/11/2008 Page 1 of 3 Project Information: Permit Use: NEW SFR -SEWER Contact: HAYDEN HOMES LLC Address: 2464 SW GLACIER PL STE 110 C - S - Z: REDMOND OR 97756 Setbacks: Front Left: Right: Rear: Phone: (549) 236-6077 Group Name: Site Informations Project Name: Plat Key: Name: Range District: Nort Parcel Number: 45091.2907 Block: Lot: SiteAddress: 11815 E MARIETTA AVE Location:: CSV Owner: Name: HAYDEN ENTERPRISES Address: 1511 SW 33RD REDMOND, OR 97756 Zoning: MF -2 MF HDR District Water District: 026 IRVIN Hold: ❑ Area: 4,550 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released 13y: Originally Released: Landuse/Zoning/HE Conditions 9/9/2008 By: tmelbourn Released By: - - - Approved with condition - see conditions Originally Released: Sewer Review 9/8/2008 By: LBARLOW Released 13y: Originally Released: 9/3/2008 By: JLMain Permits: Operator: jmm Printed By: jmm Print Date: 9/11/2008 Project Number: 08003461 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/11/2008 Page 2 of 3 Contractor: TOP OF THE LINE CONCRETE Address: 1508 N I6TH AVENUE PASCO WA 99301 Item Description APPROACH -CONST IN ROW Contractor: HAYDEN HOMES LLC Address: 2464 SW GLACIER PL STE 110 REDMOND OR 97756 DescriptionGrp Tvue Notes 1&2 FAMILY R-3 VB COV DECK R-3 VB GARAGE U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Approach Firm: TOP OF THE LINE CONCRETE Phone: (509) 546-0685 Units Unit Desc 1 NUMBER OF Permit Total Fees: Building Permit Fee Amount $50.00 $50.00 Firm: HAYDEN HOMES LLC Phone: (541) 923-6607 This Application: Total Project: Sq Ft Valuation Sq Ft Valuation 1,235 $117,312.65 1,235 $117,312.65 19 $285.00 19 $285.00 407 $7,733.00 407 $7,733.00 Totals: 1,661 $125,330.65 1,661 $125,330.65 Units Unit Desc I SELECT 1 SELECT 1 SELECT Contractor: COMPLETE HEATING & SHEET Address: PO BOX 3934 SPOKANE, WA 99220 Item Description GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING VENTILATING FANS CLOTHES DRYER HOOD -TYPE II Fee Amount $1,139.35 $4.50 $455.74 Permit Total Fees: $1,599.59 Mechanical Permit Units 1 1 3 1 1 Operator: jmm Printed By: jmm Firm: COMPLETE HEATING & SHEET Phone: (509) 533-9528 Unit Desc NUMBER OF NUMBER OF # OF UNITS NUMBER OF NUMBER OF NUMBER OF Permit Total Fees: Print Date: Fee Amount $10.00 $12.00 $1.00 $30.00 $10.00 $10.00 $73.00 9/11/2008 Project Number: 08003461 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/11/2008 Contractor: C & K PLUMBING Address: PO BOX 18620 SPOKANE WA 99228 Item Description TOILETSBIDETS SINKS TUBS DISH WASHERS GARBAGE DISPOSAL CLOTHES WASHER MISCELLANEOUS FIXTURES Plumbing Permit Page 3 of 3 Firm: C & K PLUMBING Phone: (509) 939-2377 Units Unit Desc 2 NUMBER OF 4 NUMBER OF 2 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 3 NUMBER OF Permit Total Fees: Fee Amount $12.00 $24.00 $12.00 $6.00 $6.00 $6.00 $18.00 Notes: $84.00 The driveway area from the property line up to the garage entrance shall be hardpaved. The width of the hardpaved area shall be a minimum of 17'. Payment Summary - Permit Type Approach Building Permit Mechanical Permit Plumbing Permit Fee Amount Invoice Amount $50.00 $1,599.59 $73.00 $84.00 $50.00 $1,599.59 $73.00 $84.00 Amount Paid $0.00 $0.00 $0.00 $0.00 Amount Owing $50.00 $1,599.59 $73.00 $84.00 $1,806.59 $1,806.59 $0.00 $1,806.59 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmtn Printed By: jmm Print Date: 9/11/2008 Sp®kan� galley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suittev`IVED BY Spokane Valley, WA 99206_ ePOKANE VALLEY (509)688-0036 FA.C.1709)688-0037 q www.spokanevallev.org SEP 0 3 2UOB PERMIT NUMBER PERMIT FEE: REiliv ENTER 7 'New. __Construction • Addition/Remodel Deck n Other: n Accessory Bldg SITE ADDRESS: bestir ASSESSORS PARCEL NO: LEGAL DESCRIPTION: �.y��-.. ' `1 - - Buildin :Owne'r::.:`;a>>'ra:-..:_`.,,, Mt .--.: n. _ c'n iContracior��a-!.,.t-.=`1:h.,'"r:L�_ce • 1I - Name: /40,.. /s -at Name: �Z/ai4 Address: _ / Address: way 4-1,41-`r _e; .� City: _4p Stately— Zip: 9775-r City: 4t ---State: Zip: Phone: riff- Fax: gtt-c o Phone: Fax: GARAGE SQ. FTG: ,J �6'r+ 707 Contractor Lic No: Exp Date: ryny. tPerson_::z':=; . __ ' y=;°'ir ?=F" Th., ' Conact, # OF BEDROOMS: 3 City Business Lic. No: HEAT E: CBEWERDR SEPTIC? 14 s Name: -773c de.g. ..-if Phone: ,C f S/t3- d 3ce° Describe the scope of work in detail: Cost of Project: $ /gar 22 3 de a {/m v , _ne 3/S,d eed /`< s/6-7 Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: // DIMENSIONS: # OF STORIES: TOTAL HABITABLEPACE: Ltre/233 MAIN FLOOR TO SQ. FTG:AREA: ! 2 3C 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FINISHED BASEMENT SQ. FTG: �- GARAGE SQ. FTG: ,J �6'r+ 707 DEC COV. PATIO SQ. FTG: /`J — 30% SLOPES ON PROPERTY: — # OF BEDROOMS: 3 CONSTRUCTION TYPE: S' --►a , -Y HEAT E: CBEWERDR SEPTIC? 14 s The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2115107 ❑ Chec ❑ Mastercard Expires: DATE: jg-/VISA VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) ❑ Utilities, septic tank/drain field locations and distances ❑,Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale dr completely dimensioned) • - ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing ❑ Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations o Window and door location and sizes o Window well locations if applicable' o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction. ' ❑ Roof Plan: o Engineered truss direction and spacing . o Ridge, eave and valleylines. .. o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling ❑ Joist size and spacing Wall ❑ Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing ❑ Size Radon o Passive system with 6mi1 vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Beam and girder size and location ❑ Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board • ❑ Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation ❑ Footing bottom to finished ground level depth ❑ Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Sficlkane 40,00Dalley For City Use Only PLUS Project Number g OLP Project Address 1/ B i i 1) ,Lit /ie4 • 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 1 Fax: 509,688.0037 1 permitcenter®spokanevaltey.org:, • • As part of our on-going commitment to customer service during :the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is 919 `. The TARGET DATE is the date we estimate your project application will have had its initial_technical, review. It is not the date for approval or permit issuance. - Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Exna time nurn be required/ fin. re -,submittals as project application reviewers work on nrultip/e ppp/ications and it, nun' be .several days before they can look at your new or revised information. Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best c•hoce for the entire review process. i Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure. you will save time and allow the reviewers to complete the work more expeditiously. , Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for.. deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure -that the application is -reviewable and free from substantive (laws that would prevent technical staff from completing the technical review' once 'it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their`review queue until it comes up for review. 3. Technical Compliance. Once an application is adniinistratively'complete, it is routed to technical -staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application_ is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received. a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Permit Center Spokan'r e� 11703 E Sprague Ave, Suite 13-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 Community Development www.spokanevallev org Plumbing Permit Application n Commercial ,Residential >FMalley PERMIT NUMBER: PERMIT FEE: SITE ADDRESS: /MS/ j^ r IN6r� ti 4 - /14-0 Building Owner '.. Name: /i» ' ./ -5 /47.576,.//min[ Phone. Sid/- 9zT <L Fax �f Address: i� ZYCY S•w .,.. Q/ .a City:%•--� State: or zip p7�f Contractor / Name: cex /04/,...."--2,Phone 939— t377 Fax: Address City: State: Zip' License No City Business Lic: Contact Name: ././/N Phone: y, g„ 2 77-i DESCRIPTION OF WORK # OF UNITS X COST TOTAL AMOUNT 1 TOILETS WATER CLOSET, BIDETS Z X $6.00 2 URINALS X 56 00 3 TUBS 2- X 56 00 4 SHOWERS (PER TRAP) BATH, STALL, ON-SITE BUILT X 56 00 5 SINKS LAVS/BASINS, BAR, FLOOR, KITCHEN, LAUNDRY, UTILITY, JANITOR, PHOTO, X-RAY, FOOD, PREP/CULINARY MEAT 3'I X 5600 6 DISHWASHER X 56 00 7 CLOTHES WASHER f x 56 00 8 GARBAGE DISPOSAL X 56 00 9 WATER SOFTENER X 56.00 10 ELECTRIC WATER HEATER NOTE: IF GAS, SEE MECHANICAL X 56.00 11 FLOOR DRAINS AREA, CASE, COIL, TRENCH, CONDENSATE X 56.00 12 ROOF DRAINS/OVERFLOW DRAINS X 56 00 13 FOUNTAINS, DRINKING X 56 00 14 WATER PIPING/DRAIN-IN WASTE, VENT, PLUMBING, REVERSAL NSTALLATION, ALTERATION, REPAIR, REVERSALS X 56 00 15 SEWAGE EJECTOR GRINDER, SUMP PUMP. X 56 00 16 WATER USING DEVICE ICE AN/OR COFFEE MAKER, HOSE BIB, STEAMER PROOFER, CARBONATOR, SWAMP COOLER 3 X 56 00 17 CROSS CONNECTION DEVICE VACUUM BREAKER, CHECK VALVE, AND R P.B P.D FOR: VATS, TANKS, BOILERS X 56 00 18 INTERCEPTORS GREASE TRAP, SAND TRAP, CHEMICAL HOLDING TANK X 56 00 19 MEDICAL GAS (per outlet) NITROUS, OXYGEN X $6 00 20 MISCELLANEOUS PLUMBING FIXTURE X 56 00 21 PRIVATE SEWAGE DISPOSAUSYS r X 520 00 22 INDUSTRIAL WASTE INTERCEPTOR X 515.00 METHOD OF PAYMENT: ❑CASH 0 CHECK VISA ❑ MC Card# AUTHORIZED SIGNATURE: REVISED 826/05 EXPIRES VIN SUBTOTAL PROCESSING FEE 535.00 TOTAL PERMIT FEE DUE: S i kane • oenalley. Community Development Mechanical Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 w ww.spokanevalley.ore PERMIT NUMBER: PERMIT FEE: n Commercial Residential SITE ADDRESS: J/I/$— C ,flan'e/4‘ 004re Building Owner - Name: /4070,e... 1 / � S w p/mss- /�t Phone s'4 City /� � 9s� _ "� Fax `� state: a ..._ %gyp, y 77.5--X Address: 2.„r49.*. Contractor _ Name [ , ,4 / '/ !/ ! Phone '33 J - ?�r Fax Address: City. State: Zip: License No: City Business Lie: Contact - - - Name: Phone: DESCRIPTION OF WORK # OF UNITS X COST = TOTAL AMOUNT 1 FUEL BURNING APPLIANCE Equal to or less than 100,000 X 512.00 2 FUEL BURNING APPLIANCE More than 100,000 X $15.00 3 UNLISTED APPLIANCE (Additional Fee) Equal to or less than 400,000 X $50.00 4 UNLISTED APPLIANCE (Additional Fee) More than 400,000 X 5100 00 5 USED APPLIANCE (WSEC min AFUE rating) Equal to or less than 400,000 X $50.00 6 USED APPLIANCE (WSEC min AFUE rating) More than 400,000 X 5100 00 7 BOILER/REFRIGERATION 1 - 100M BTU X $12.00 8 BOILER/REFRIGERATION 101 - 500M BTU X 520 00 9 BOILER/REFRIGERATION 501 - 1,000M BTU X 525 00 10 BOI LER/R EFR IGERATION 1,001 - 1,750M BTU X 535 00 11 BOILER/REFRIGERATION More than 1,750M BTU X $60 00 12 GAS LOG. GAS INSERT. GAS FIREPLACE X 51000 • 13 RANGE X 51000 14 DRYER X 510 00 15 FUEL BURNING WATER HEATER X 510.00 16 MISC. FUEL BURNING APPLIANCE X 510 00 17 GAS PIPING (each outlet) X 51.00 18 DUCT SYSTEMS X $10.00 19 VENTILATING FANS x 510.00 3 20 AIR HANDLER (DOES NOT include ducting) Equal to or less than 10,000 CFM x 512.00 21 AIR HANDLER (DOES NOT include ducting) Greater than 10,000 CFM X 515.00 22 EVAPORATIVE COOLERS x 510.00 23 TYPE I HOOD X 550.00 24 TYPE II HOOD X 510.00 25 HEAT PUMP/AIR CONDITIONER 0-3 TON X $12.00 26 AIR CONDITIONER 4-15 TON X $20.00 27 AIR CONDITIONER 15-30 TON X 525.00 28 AIR CONDITIONER 30-50 TON X $35 00 29 AIR CONDITIONER More than 50 TON X $60 00 r- 30 LPG STORAGE TANK X 510 00 31 WOOD OR PELLET STOVE/INSERT X 510 00 32 WOOD STOVE - FREE STANDING x 525 00 33 REPAIR & ADDITIONS x $15.00 34 VENTILATION SYSTEMS x 512.00 35 VENTILATION MECHANICAL EXHAUST x $12.00 36 INCINERATOR - RESIDENCE X 519.00 37 INCINERATOR - COMMERCIAL X 522.00 METHOD OF PAYMENT: ❑CASH ❑ CHECK CARD# AUTHORIZED SIGNATURE: REVISED A/26105 EXPIRES SUBTOTAL PROCESSING FEE TOTAL PERMIT FEE DUE: 535.00 Spokane do•FValleym Community Development Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokane val I ey. ora Approach Permit Application PERMIT NUMBER: PERMIT FEE: PROJECT ADDRESS //8 f 5— • `V(a I' vin START DATE OA' V ANTICIPATED COMPLETION DATE Building Owner: Contractor: Name: Address tyi4' •✓ y�k,d State: es City: Zip: O 7752. Phone: S'f/I9,J -ire 7- Fax: Contact Person Name: ye. cp_e, or - Phone: '//j. Csvo PROJECT DESCRIPTION (Provide site sketch) Residential Driveway Existing Curb & Gutter Culvert Installation Other Conditions Name' zO e/ �i G:4C P Address: City: State: Zip: Phone: ng _ y3/4c Fax: Contractor Lic No: Exp Date: City Business Lie. No: Commercial/Industrial Driveway Rural Road Section Sidewalk Repair/Construction Bond/Insurance certification must be on file with the city. DISCLAIMER The permittee verifies, acknowledges and agrees by their signatures that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit Inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a pertmt or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. Signature Date ///O Mcthod ofPaymcnt: 9 Cash ❑ Check ❑ Mastercard VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED ,sm6 BY• b°, DATE• &:k I I , 2