2012, 08-10 Permit: SW-12001950 SewerSPOKANE COUNTY Bt-41,DIf; G AND PLANNING
PERMIT
Application Number: SW -12001950
Permit Issued Date:
08/10/2012
Expiration Date: 08/11/2012
Project Description:
SEWER CONNECTION
Primary Contact:
ALDERMAN, JOSH J & CHRYSTAL C
Applicant:
ALDERMAN, JOSH J & CHRYSTAL C
Permit Type:
SEWER
Address:
7420 E LIBERTY
SPOKANE VALLEY, WA 99212
Phone:
Email:
SITE INFORMATION:
Site Address:
7420 E LIBERTY AVE
Owner:
ALDERMAN, JOSH J & CHRYSTAL C
Parcel Number:
35014.0127
Address:
7420 E LIBERTY
SPOKANE VALLEY, WA 99212
Subdivision:
ORCHARD AVENUE
Phone:
Assessor's Description:
ORCHARD AVE ADD N117.25 FT B96
Email:
Inspection Area:
Water District: Orchard
Fire District: Spokane
Valley Fire
Avenue Irrigation District
#6
Zoning:
Land Area: 17316
Square Feet
CONTRACTOR INFORMATION:
General Contractor
OWNER
OWNER
NOT KNOWN AT TIME OF ENTRY
UNKNOWN,, UK 00000
DETAILS:
Class
SEWER
CONDITIONS:
Type
SEWER CONNECTION
Quantity Unit Charge Value
FEE DETAIL:
Processing - Utilities
Utilities Permit
$125.00 $125.00
$125.00
$25.94
$125.00
Total Fee: $150.94
Inside Public Transit Benefit Area
----------------------------------------------------
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
----------------------------------------------------
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
—--------------——————--——————————————————————— — — — — — —
Date Printed: 08/10/2012 08:52:32 Printed by: IIS APPPOOLWSP.NET v4.0
SPOKANE COUNTY BL!ILDI",G AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001950 08/10/2012
Expiration Date: 08/11/2012
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
_AP_PLYAFTE_R3_0_MINUTE_S._________________________________________
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
—----------------------—————————————————————————————
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL _OFTHE STRUCTURE .__________________________
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
—-------------—--————--——————————————————————— — — — — — —
Date Printed: 08/10/2012 08:52:32 Printed by: IIS APPPOOLWSP.NET v4.0