Loading...
2012, 08-10 Permit: SW-12001950 SewerSPOKANE COUNTY Bt-41,DIf; G AND PLANNING PERMIT Application Number: SW -12001950 Permit Issued Date: 08/10/2012 Expiration Date: 08/11/2012 Project Description: SEWER CONNECTION Primary Contact: ALDERMAN, JOSH J & CHRYSTAL C Applicant: ALDERMAN, JOSH J & CHRYSTAL C Permit Type: SEWER Address: 7420 E LIBERTY SPOKANE VALLEY, WA 99212 Phone: Email: SITE INFORMATION: Site Address: 7420 E LIBERTY AVE Owner: ALDERMAN, JOSH J & CHRYSTAL C Parcel Number: 35014.0127 Address: 7420 E LIBERTY SPOKANE VALLEY, WA 99212 Subdivision: ORCHARD AVENUE Phone: Assessor's Description: ORCHARD AVE ADD N117.25 FT B96 Email: Inspection Area: Water District: Orchard Fire District: Spokane Valley Fire Avenue Irrigation District #6 Zoning: Land Area: 17316 Square Feet CONTRACTOR INFORMATION: General Contractor OWNER OWNER NOT KNOWN AT TIME OF ENTRY UNKNOWN,, UK 00000 DETAILS: Class SEWER CONDITIONS: Type SEWER CONNECTION Quantity Unit Charge Value FEE DETAIL: Processing - Utilities Utilities Permit $125.00 $125.00 $125.00 $25.94 $125.00 Total Fee: $150.94 Inside Public Transit Benefit Area ---------------------------------------------------- Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. ---------------------------------------------------- CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. —--------------——————--——————————————————————— — — — — — — Date Printed: 08/10/2012 08:52:32 Printed by: IIS APPPOOLWSP.NET v4.0 SPOKANE COUNTY BL!ILDI",G AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001950 08/10/2012 Expiration Date: 08/11/2012 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES _AP_PLYAFTE_R3_0_MINUTE_S._________________________________________ INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. —----------------------————————————————————————————— SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL _OFTHE STRUCTURE .__________________________ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. —-------------—--————--——————————————————————— — — — — — — Date Printed: 08/10/2012 08:52:32 Printed by: IIS APPPOOLWSP.NET v4.0