Loading...
2008, 08-22 Permit: 08003202 ApproachSpokane Valley BUILDING DIVISION 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Site Information Project Information 1 Site Address: 11818 E MARIETTA AVE Parcel Number: 45091.3014 Subdivision: Block: Lot: Zoning: MF -2 MF HDR District Owner: HAYDEN HOMES Address: 2464 SW LACIER PLC REDMOND WA 97756 Building Inspector: NORTH Water Dist: IRVIN Project Number: 08003202 Inv: 1 Issue Date: 08/22/2008 Permit Use: RESIDENTIAL APPROACH Applicant: HAYDEN HOMES 2464 SW GLACIER PLC REDMOND. OR 97756 Contact: HAYDEN HOMES 2464 SW GLACIER PLC REDMOND, OR 97756 Setbacks - Front: Group Name: Project Name: Left: Right: Phone: (541) 923-6607 Phone: (541)923-6607 Rear: Permits Approach Contractor: TOP OF THE LINE CONCRETE License #: TOPLILC944N4 APPROACH -CONST IN ROW 1 FOR RIGHT OF WAY INSPECTIONS CALL (509) 688-0053 ENGINEERING $50.00 Total Permit Fee: $50.00 Payment Summary Total Fees AmountPaid AmountOwinv $50.00 $50.00 $0.00 Tran Date Receipt # Payment Amt 08/22/2008 15429 $50.00 Notes / Conditions of Approval Acceptance is based on the edge of the driveway being 7.5 feet from lot line at the right-of-way, sidewalk to be poured at time of approach construction and existing curb and gutter to be removed and standard curb drop to be constructed. Any damage to existing asphalt is to be repaired. Approach to be inspected and approved by the City's Development Inspector, Rod Pegram. Processed By: Main, Jodi L Printed By: PATRICIA PRINCE Page 1 of 1 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The perrnit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final Inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — pnor to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for eleclncal wiring, State Department of labor Permits and inspections for Sewer Connection. Spokane County Utilities Division And Industries 324-2640 477-3604 Permits and inspections fa on-site septic systems, Spokane Regional Fire spnnkler and alarm systems and pnvate access road inspections, Spokane Valley Health Distncl 324.1560 Fire Department 892-4122 Stale law RCW 19122 requires that pnor to any excavation the -CALL BEFORE YOU DIG' center must be notified Call before you dig at least 2 working days in advance, 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a perrnit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance. regardless of whether the work is finished, If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the orlgln permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under'the'permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancel[ed'p'igr to the plan review being completed Owner / Agenti ; y yl�`.� Date g 70e Staff Appr9dal Date