1972, 03-20 Permit App: J2208 Storage BldgCounty of Spokane' Washington
BUILDING CODES DEPARTMENT, COURTHOUSE, SPOKANE, WASHINGTON 99201
APPLICATION FOR LAND USE OR STRUCTURE PERM!
GENERAL REQUIREMENTS PERMIT FEE/
PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any
kind or alter any building or structure already erected, or to change a land use. Construction mast conform with the
Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection.
WATER. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs
the surface„ shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office.
SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47.235.
SET -BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line, of at
least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required.
STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress
and egress.
COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be
Performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer.
MOVING OF BUILDINGS. A permit 1s required to move an existing building, When a building is moved on a County or State
Highway, clearance must be obtained from the County Engineer and/or -State Highway Department.
ACCESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit.
RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running with the land
which are enforceable through civil action. County Officials can not bring action to enforce covenants or dedications.
APPLICANT FILL IN BELOW THIS LINE
Name of Owner ., G
Architect
Contractor
Legal Description of Property ((Give complete.
Address r 6,6 r -
oncie-)a 6 290
Engineer Phone
Address Phone
escripti n frpgi deed, tax receipt, etc. )05 °LYL
DESCRIPTION OF WORK: New X Addition
Size of Lot // 3 X 73_
Dimensions 2 0 4 t' 0
co crete, brick, etc.)
Rooms Baths Basement Foundat
(Full, part, none)
Heat. System'Type of Roofin
Use of Bldg.
Garage or Corport Attached
Remodel
ion Const
Moving Bldg. one Fire Zone
Sewage System Stoyrly/ G O —.
Total Sq. Ft. C5rValuatiorr7
C A aChimney Fireplace
(Kind) (Number)
Ext Finish 77--/-4 Int. Wall Finish
Draw sketch with dimensions showing: (1)
proposed buildings; (4) distance to property
tem and water supply lines.
NORTH
No. of Units __ Bedrooms
Private Detatched
PLOT PLAN .
property lines; (2) street or road locations; (3) location ofIezisting and
lines and streets; (5) dimensions of buildings; (6) location of sewage sys-
I her by cert
as shown.
'on submitted is correct and there are
State License o.
Ind. Ins. Acct. No.
REQUIRED .
Plumbing Fermi
Heating Permit
Sewage Permit
Plans Received
Plans Checked
Plans Returned
Plans Picked Up
Plans Mailed
no other structures located on this property except
O
Owner or Agent"' Date
A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES.
THIS IS NOT A PERMIT.
DO NOT WRITE BELOW THIS LINE
(
Your street address will be
Sewage Permit Number Issued
Remarks
o
Building Per
„one
1s6'�'�'—Gl
Receipt'/ ro Issued
i
Form 523 Bldg. Code