Loading...
2009, 05-18 Permit App: 09001331 Garage AdditionProject Number 09001331 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/18/2009 Page 1 of 2 Project Information: Pernut Use: ADDITION TO GARAGE Contact: FREY, .1 G & A M Address: 18715 E MARLIN DR C - S - Z: SPOKANE VALLEY, WA 99027-9528 Setbacks: Front Left: Right: Rear: Phone: (509) 927-8766 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Parcel Number. 55082.0314 Block: Lot: SiteAddress: 18715 E MARLIN DR Location:: CSV Owner: Name: FREY, J G & A M Address: 18715 E MARLIN DR SPOKANE VALLEY, WA 99027-95 Zoning: R-4 SF Res Urban District Water Distract: 134 CONSOLIDATED ID #I9 Area: 10,342 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Information: r, Review Building Plan Review Released -By: _. Originally Released: 5/14/2009 By: TMELBOU Landuse/Zoning/HE Conditions Released By: APPROVED Originally Released: 5/18/2009 By: MPALANI Permits: Operator: jmm Printed 13y: jmm Print Date: 5/18/2009 Project Number: 09001331 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/18/2009 Page 2 of 2 Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation GARAGE U-1 VB 240 $4,560.00 240 $4,560.00 Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 240 $4,560.00 240 $4,560.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Fee Amount $111.25 $4.50 $44.50 Permit Total Fees: $160.25 Notes• Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $115.75 $160.25 $160.25 $44.50 $160.25 $160.25 $44.50 $115.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 5/18/2009 Spokane 40000Ualley° Community Development Residential Construction r �;,,,,,, cENitit1 Nov Construction cv Permit Application----aition/Remodel 7 Other: Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA •99206 BY (509)688-00-'all3ryy6 •t ; 5A FAX(�8VNtE'( www.spol.'aiey.o1'g 2 09 MAY 13 PERMIT NUMBER: q.73-1 PERMIT FEE• Ft Accessory Bldg Deck SITE ADDRESS ) 7S 7/5 .E / 29 1 �/--'1 ' DA_ . to-Lkt ia.g �2 d i 4.44. fit' ASSESSORS PARCEL NO: 1-6-c) X s O /4/ LEGAL DESCRIPTIONS/ ;17 9049. Buildiu `.Owne`r 1. t : , ...r, s rr_,.,= ,. q• r p`t a;E O a. t : ' ;� : %. -.:A.'.:.':.rb\. 4 ...�.) . .b�.-'I.p'� �`::: A--rd'��.F= - r! i; ., F.; �':_: �': : ;+:. y.- "r'_ x:`.-: ' __- "Corit`ractor _ _ _ S int'-.._i.E4Az v- � - . .- -_ Name:Cl at 4......., ja '� 7 i> . r • Name: (b,:#14.4.1,... ✓`v . . )Y...e... Address: `(y/ e . Address'1 lkf% % �/"' p.: •yrkad Y, v� iiyy GVt1 �- C (4 - - % )n i 0 0, 3 Statei.) )0 Zipq 9D2� l` City: State: Zip: -'-udi_ / PhFax: ony: 9-qa"7_9 7�� Phone: Fax: GARAG SQ. G: r, 9 s --/ Contractor Lic No: Exp Date: kContact;Persojri`4.?. :„ ` .`;_ �-`•`. City Business Lic. No: j<.2.fy.= /`a, SEWEROR SEPTICl? Name: (�/Q-{f'1/�.fi �y ArA..11.4.01,---- .i. Phone: Phone: .t5) 9 — Q %— 5 /woe!. Des ..i ribe the scope of work'lin detail: / -/N Al :1--# Cost of Pro ect: SO % eta _ate Jr . 10 �o - 9—• . j , **************The MUST be complete: (write N/A if not applicable)********* ** * ***** following � * Proposed Use: &17 HEIGHT �TO PEAK: D.IMENS� I� I # OF STORIErS: TOTAHABITABLE --)q 4.C_ MAIN FLOOR TO SQ. FTG: — 722" FLOOR SQ. FTG' UNFIN BASEMENT/SQ._ FTG: �roM1) IMPERVIOUS SURFACE AREA: , Df FINISHED BASE 1E t SQ. FTG: �" GARAG SQ. G: r, 9 s --/ rDECK/CO .PATIO SQ. FTG: ' 30% SLOPES ON�% PROPERTY: / # OF BEDR• •M : CONSTRUCTI► TYPE: ./9- HEAT SO CE: SEWEROR SEPTICl? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check DATE: �"— / 3 — o 9 ❑ Mastercard ❑ VISA Expires: VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. p SITE PLAN giProperty lines and dimensions - tti, Direction arrow pointing North and orientation to streets Proposed/existing buildings (footprint and dimensions) Nb Utilities, septic tank/drain field locations and distances o Setbacks to property lines Q Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) IW Elevations (Front/Rear/Sides) with roof peak and wall height including basement: yal Foundation Plan (crawlspace, basement or slab on grade): rasFooting sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses 0 Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations Roof Plan: o Engineered truss direction and spacing SRafter and over frame direction, size and spacing IN Wall Section Detail including: Roof SSlope/ roofing material/ underlayment/ ice dam protection ttit Sheathing size and type Ceiling o Joist size and spacing Wall-- ti*Height/ top plate/ stud 'size and spacing/ sole plate toExterior sheathing size and type Floor o Joist size and spacing Foundation Wall `tConcrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with Emil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing 0 Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location 4 Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board t Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board 4aiSheathing or concrete floor size/ insulation mooting bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations O Handrail / Guard height & spacing CITY or Sp • ur ane Valley® For City Use Only • • PLUS ProjectNumber �/ ' (J3 % Project Address / 3c 9% 5- •E. `/1 Z r'L'LsLJ 11703 E Sprague Ave,Suite B-3 ♦ Spokane Valley,WA 99206'',' . 509.688.0036'0 Fax: 509.688.0037 ♦ permitcenfer®spokanevalley.org.. As part ofour on-going commitment' td customer, service during the ;review' process' of your, project application; we providing you. with a TARGET DATE for the initial technical application review are :',If for' any reason we cannot meet this date;, we will contact you with aa revised target date. = .., Your application review TARGET DATE is /'� The TARGET DATE•'is the date we estimate your `project application will have:had its initial technical, review. It is not the date for approval or permit issuance: Tips fora Smoother Project ApplicationReview i Submit:complete; accurate plans and:documents. • - - E.tti•a time may be required for 1•e_ submittals as project. application,tevieueis work olt,m•ultiple'applications and, it mar be several days before then ran look at j,bur nein or revised information.' • ➢ Designate.a specific contact person to communicate. with the City.' . . While tite'peison designated'as, the applicant's contact person xdth the-Cih, can he.c/ianged,-one individual with,the expertise for dealing with reviewer comments would be'the hest choice jor the entire review process. • • ➢ Call staff regarding the status of your project only after the target date shown at the top of the, page. ' Although you should be contacted on or by the taiget,date, please feel flee to contac7 us if:i-ou'haven'/ heardfi-oin.us by your target date Staff may contact von before the target ,date if the initial revieii', is complete. Bt' following dus procedure, you will scnve tinre'and allow the reviewers. to complete the work more expeditiously. • ' • Steps in the Permit Process 1. Counter Complete Your application has been accepted_ as counter complete., This 'means'•all'. of 'the ,required documents, as indicated' on your Pre -Application Checklist have been submitted or have ,been' approved '.for' ,'deferred •' . submittal. This does not prevent technical staff from' requesting additional information as a result of, their technical review.' 2. ,Quality Check. The next step in the process is a'quality check to' make sure that the application -is reviewable and free from substantive Claws that would prevent; technical staff.from completing the. technical review once it is, started.'. When: this step is complete, your application will be routed .to 'the appropriate staff and remain in' their review'queue until it comes up for review, 3. Technical Compliance. Once.an application is administratively. ,complete; it is routed to technical staff for. compliance, review. Depending on the type of project, technical staff may include, multiple:reviewers: You'. should be contacted by • ' phone, fax, email; or mail by your TARGET DATE once the initial technical compliance review is complete:' 4. Permit Issuance. When the technical compliance review of the application is complete, including a=ny subsequent re-• submittals,' each reviewer will approve their section of the application and route it to the Permit Centel..When-all,sections of the application are received, a Permit Specialistwill process the application and contactthe'person specified on your application for permit pick-up. Information regarding feesand pre -construction meetings (if required) will be provided by the Permit Specialist at that time. ' - WHITE -APPLICANT PINK -BUILDING FILE REV 9/07 A 20, 7. ) 2:: ea144-121 5.fie — PLANNING DEPT. APPROVED BY. DATE: SPS /z()°9 1 LDT 10,342_ Eh 4 ' 4 0604.%, Spcmoclane Valleye 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 ♦509.688.0036 ♦ Fax: 509.688.0037 • Memorandum Date: 6/12009 To: FINANCE DEPT From: JODI MAIN CC: MARY KATE MARTIN Re: REFUND ON PERMIT FEES PROJECT NUMBER: 09 1331 PROJECT ADDRESS: 18715 E MARLIN PROJECT TYPE: REASON: REFUND TYPE: GL ACCOUNT : AUTHORIZED BY: DATE: ADDITION TO GARAGE Customer request refund, they will not be doing the project. Retaining 1 hour of staff time. $111.25 - $61.00 = $50.25. Send refund check in the amount of $50.25 to J G & A M Frey, 18715 E Marlin Dr, Spokane Valley WA 99027 oe I o5Skcsg 3ZZ I Q01 aG- i2—Zees 1 ORIGINAL TO FINANCE AND COPY TO FILE WITH PAPERWORK