2005, 05-23 Permit: 05001693 Residencej
BUILDING DIVISION
11707 E. Sprague Avenue, Suite 106
Spokane Valley, WA 99206
Site Information
Project Information
1
Site Address: 7202 E MARIETTA AVE
Parcel Number: 35121.6323
Subdivision:
Block: Lot:
Zoning: UR -3 Urban Residential 3.5
Owner: NORRIS, GEORGE P & CAROL M
Address: 1511 LAS BRISAS DR
HOLLISTER, CA 95023
Building Inspector: BARRY HUSFLOEN
Water Dist:
Project Number: 05001693 Inv: 1 Issue Date: 05/23/2005
Permit Use: NEW RESIDENCE W/ATTACHED GARAGE - NATURAL
GAS
Applicant: COUGAR CONSTRUCTION
9293 RAMSGATE LN
HAYDEN, ID 83835
Contact: COUGAR CONSTRUCTION
9293 RAMSGATE LN
HAYDEN, ID 83835
Phone: (208) 640-6636
Phone: (208) 640-6636
Setbacks - Front: 40 Left: 26 Right: 25 Rear: 100+
Group Name:
Project Name: ROW
Permits
Approach Contractor: COUGAR CONSTRUCTION
APPROACH INSPECTION
License#: COUGAC*123KW
1 $25.00 CONST IN ROW - APPROACH 1 $25.00
Total Permit Fee: $50.00
FOR RIGHT OF WAY INSPECTIONS CALL (509) 869-5373 ENGINEERING
Building Permit
Group: R-3
Contractor: COUGAR CONSTRUCTION
License #: COUGAC*123KW
Type: VB
Total Area
Building Height
Stories
Dwelling Units
2518
25
1
1
BASEMENT F
COV DECK
GARAGE
RESIDENCE
Total Value:
FOR BUILDING INSPECTIONS CALL (509) 688-0054.
R-3
R-3
U-1
R-3
VB 868
VB 400
VB 675
VB 1,650
$159,407.00
RESIDENTIAL PERMIT FEE
STATE SURCHARGE
RESIDENTIAL PLAN REVIEW
$1,329.75
$4.50
$531.90
Total Permit Fee: $1,866.15
Mechanical Permit Contractor: COUGAR CONSTRUCTION
WOOD/PELLET STOVE/INSER
GAS APPLIANCE<=100,000BT
AIR CONDITIONER:4-15 TONS
CLOTHES DRYER
GAS LOG OR GAS INSERT
FOR MECHANICAL INSPECTIONS CALL (509) 688-0054.
License #: COUGAC*123KW
$10.00 GAS WATER HEATER 1 $10.00
$12.00 GAS PIPING 5 $5.00
$20.00 VENTILATING FANS 4 $40.00
$10.00 RANGE 1 $10.00
$10.00 HOOD -TYPE II 1 $10.00
Total Permit Fee: $137.00
Processed By: KATHY CUMMINGS
Printed By: MIKE TURBAK
Page 1 of 2
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Perrrdts and inspections for electrical wiring, State Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division
And Industries 324-2640 477-3604
Permits and inspections for on-site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road inspections, Spokane Valley
Health District 324-1560 Fire Department 892-4122
State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG" center must be notified. Call before you dig at least 2 working days in advance, 456-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent
Date s f / for
Staff Approval Date
Sio°lane�
jValley
BUILDING DIVISION
11707 E. Sprague Avenue, Suite 106
Spokane Valley, WA 99206
Site Information Project Information
Site Address: 7202 E MARIETTA AVE
SPOKANE VALLEY, WA 99212
Parcel Number: 35121.6323
Project Number: 05001693 Inv: 1 Issue Date: 05/23/2005
Permit Use: NEW RESIDENCE W/ATTACHED GARAGE - NATURAL
GAS
Permits
Plumbinz Permit
Contractor: COUGAR CONSTRUCTION License #: COUGAC*123KW
TOILETS/BIDETS 3 $18.00 SINKS 7 $42.00
SHOWERS 1 $6.00 TUBS 2 $12.00
DISH WASHERS 1 $6.00 GARBAGE DISPOSAL 2 $12.00
CLOTHES WASHER 1 $6.00 FLOOR DRAINS 1 $6.00
WATER USING DEVICES 2 $12.00
Total Permit Fee: $120.00
FOR PLUMBING INSPECTIONS CALL (509) 688-0054.
Payment Summary
Total Fees AmountPaid AmountOwing
$2,173.15
$2,173.15 $0.00
Tran Date
05/23/2005
Receipt # Payment Amt
1413 $2,173.15
Notes / Conditions of Approval
WSEC COMPLIANCE REQUIRED BEFORE ISSUANCE OF CO - MT
LIVE CONNECTION TO SEWER REQUIRED PRIOR TO ISSUANCE OF CO - MT
Processed By: KATHY CUMMINGS
Printed By: MIKE TURBAK Page 2 of 2
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for electrical wiring, State Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division
And Industries 324-2640 477-3604
Permits and inspections for on-site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road inspections, Spokane Valley
Health Distnct 324-1560 Fire Department 892-4122
State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG" center must be notified. Call before you dig at least 2 working days in advance, 456-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent
&A',I6?,10111 Date 5ft 0)S.
Staff Approval Date