Loading...
2005, 05-23 Permit: 05001693 Residencej BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information 1 Site Address: 7202 E MARIETTA AVE Parcel Number: 35121.6323 Subdivision: Block: Lot: Zoning: UR -3 Urban Residential 3.5 Owner: NORRIS, GEORGE P & CAROL M Address: 1511 LAS BRISAS DR HOLLISTER, CA 95023 Building Inspector: BARRY HUSFLOEN Water Dist: Project Number: 05001693 Inv: 1 Issue Date: 05/23/2005 Permit Use: NEW RESIDENCE W/ATTACHED GARAGE - NATURAL GAS Applicant: COUGAR CONSTRUCTION 9293 RAMSGATE LN HAYDEN, ID 83835 Contact: COUGAR CONSTRUCTION 9293 RAMSGATE LN HAYDEN, ID 83835 Phone: (208) 640-6636 Phone: (208) 640-6636 Setbacks - Front: 40 Left: 26 Right: 25 Rear: 100+ Group Name: Project Name: ROW Permits Approach Contractor: COUGAR CONSTRUCTION APPROACH INSPECTION License#: COUGAC*123KW 1 $25.00 CONST IN ROW - APPROACH 1 $25.00 Total Permit Fee: $50.00 FOR RIGHT OF WAY INSPECTIONS CALL (509) 869-5373 ENGINEERING Building Permit Group: R-3 Contractor: COUGAR CONSTRUCTION License #: COUGAC*123KW Type: VB Total Area Building Height Stories Dwelling Units 2518 25 1 1 BASEMENT F COV DECK GARAGE RESIDENCE Total Value: FOR BUILDING INSPECTIONS CALL (509) 688-0054. R-3 R-3 U-1 R-3 VB 868 VB 400 VB 675 VB 1,650 $159,407.00 RESIDENTIAL PERMIT FEE STATE SURCHARGE RESIDENTIAL PLAN REVIEW $1,329.75 $4.50 $531.90 Total Permit Fee: $1,866.15 Mechanical Permit Contractor: COUGAR CONSTRUCTION WOOD/PELLET STOVE/INSER GAS APPLIANCE<=100,000BT AIR CONDITIONER:4-15 TONS CLOTHES DRYER GAS LOG OR GAS INSERT FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. License #: COUGAC*123KW $10.00 GAS WATER HEATER 1 $10.00 $12.00 GAS PIPING 5 $5.00 $20.00 VENTILATING FANS 4 $40.00 $10.00 RANGE 1 $10.00 $10.00 HOOD -TYPE II 1 $10.00 Total Permit Fee: $137.00 Processed By: KATHY CUMMINGS Printed By: MIKE TURBAK Page 1 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Perrrdts and inspections for electrical wiring, State Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division And Industries 324-2640 477-3604 Permits and inspections for on-site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road inspections, Spokane Valley Health District 324-1560 Fire Department 892-4122 State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG" center must be notified. Call before you dig at least 2 working days in advance, 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date s f / for Staff Approval Date Sio°lane� jValley BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 7202 E MARIETTA AVE SPOKANE VALLEY, WA 99212 Parcel Number: 35121.6323 Project Number: 05001693 Inv: 1 Issue Date: 05/23/2005 Permit Use: NEW RESIDENCE W/ATTACHED GARAGE - NATURAL GAS Permits Plumbinz Permit Contractor: COUGAR CONSTRUCTION License #: COUGAC*123KW TOILETS/BIDETS 3 $18.00 SINKS 7 $42.00 SHOWERS 1 $6.00 TUBS 2 $12.00 DISH WASHERS 1 $6.00 GARBAGE DISPOSAL 2 $12.00 CLOTHES WASHER 1 $6.00 FLOOR DRAINS 1 $6.00 WATER USING DEVICES 2 $12.00 Total Permit Fee: $120.00 FOR PLUMBING INSPECTIONS CALL (509) 688-0054. Payment Summary Total Fees AmountPaid AmountOwing $2,173.15 $2,173.15 $0.00 Tran Date 05/23/2005 Receipt # Payment Amt 1413 $2,173.15 Notes / Conditions of Approval WSEC COMPLIANCE REQUIRED BEFORE ISSUANCE OF CO - MT LIVE CONNECTION TO SEWER REQUIRED PRIOR TO ISSUANCE OF CO - MT Processed By: KATHY CUMMINGS Printed By: MIKE TURBAK Page 2 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for electrical wiring, State Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division And Industries 324-2640 477-3604 Permits and inspections for on-site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road inspections, Spokane Valley Health Distnct 324-1560 Fire Department 892-4122 State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG" center must be notified. Call before you dig at least 2 working days in advance, 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent &A',I6?,10111 Date 5ft 0)S. Staff Approval Date