Loading...
2011, 11-09 Permit App: 11003519 Addition;.Project Number: 11003519 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Date: 11/09/2011 Page 1 of 2 Permit Use: 138 SQFT RES MAIN FLOOR / 437 SQFT GARAGE Contact: SUMMIT EXCAVATING & CONST LLC ADDITION Address: PO BOX 1191 C - S - Z: SPOKANE VALLEY, WA 99037 Setbacks: Front Left: Right: Rear: Phone: (509) 842-8132 Group Name: Project Name: Site Information: Plat Key: 001938 Name: PARK ROAD ADD District: Nort Parcel Number: 35131.0214 Block: Lot: SiteAddress: 7207 E MAXWELL AVE Location:: CSV Owner: Name: MAHAN, LISA G Address: 7202 E MAXWELL AVE SPOKANE, WA 99212 Zoning: R-2 SF Res Suburban District Water District: 100 SPO CO WATER DIST#3A Hold: 1111 Area: 11,501 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Septic Sys Review Originally Released: 11/09/2011 By: tmelbourn Released By: Originally Released: 11/09/2011 By: LHALSEY Landuse/Zoning/HE Conditions Released By: Originally Released: 11/07/2011 By: mharnois Permits: Operator: MBB Printed By: MT Print Date: 11/09/2011 ;,Project Number: 11003519 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 11/09/2011 Page 2 of 2 Contractor: SUMMIT EXCAVATION & CONST Address: PO BOX 1191 SPOKANE VALLEY, WA 99037 Building Characteristics Group: R-3 Group: U-1 Total Area Building Height Stories Description Type: VB Type: VB 575 12 1 Building Permit Firm: SUMMIT EXCAVATION & CONST Phone: (509) 842-8132 Grp Type Notes GAR WOOD U-1 VB RES ADD This Application: Total Project: Sci Ft Valuation Sci Ft Valuation 437 $8,303.00 437 $8,303.00 ATTACHED GARAGE R-3 VB MAIN 138 $13,931.10 138 $13,931.10 FLOOR ADDITION Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 575 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT $22,234.10 575 $22,234.10 Fee Amount $363.25 $4.50 $145.30 Permit Total Fees: $513.05 Notes: Septic designed for 2 bedrooms only. Payment Summary: , Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $513.05 $513.05$83.81 $429.24 $513.05 $513.05 $83.81 $429.24 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: MBB Printed By: MT Print Date: 11/09/2011 S blanc a Walley° Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter©snoka nevallev.orq (Staff Use Only) PERMIT NUMBER: —3S PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION 0 NEW CONSTRUCTION 0 DECK SITE ADDRESS: -7 ZQ 7 E ASSESSORS PARCEL NO.: 3S-131, ADDITION/REMODEL IS ACCESSORY BUILDING 0 OTHER pp ff//� PV\A c Q(� cPOb E W l - 6 Z-19- LEGAL DESCRIPTION: BUILDING OWNER NAME: NAME: ( VS (\v K/\T"'\\%0 ADDRESS: 2 (:). ` t\ )C W CITY: \ v 06\S v C �yVv PHON�C�0 3 �' Z ( FAX: STATE: W +} ZIP: CELL: 'ci CONTACT NAME: '/�`'-I IN�"t^J�yr+-r{,` 11cj1`\��' PHONE: 20(� ` l ( %M 1 FAX: CELL: CONTRACTOR NAME: CA) U\k1j\f\ \� 2cc_AN.Arc- N Co MAILING ADDRESS: CITY: \IQO.AL 0 J 7 PHONE: 5- U`-yA 0 t 2 (3 -- FAX: �(/ CONTRACTOR LICENSE NO.: �JJY`i\M\` r, -`EOXP eES: STATE: w ZIP:. CELL: 0\0107 CITY BUSINESS LICENSE NO.: . DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ****YOU MUST COMPLETE THE FOLLOWING**** CITY OF SPOKP NE VALLEY MARK N/A IF NOT APPLICABLE NOV 4 2011 Height to Peak:' ( 18 1 Dimensions: Zo x 2:5 No. of Stories: )`-' Total IiahlA tRGEN 1 th Mace: f G k Main Floor SQ FT: IIa dODrnefr 014, ( 38 Upper Floor SQ FT: Unfinished Basemen FT: Q rni3N�d Basement SQ FT: Garage SO FT:__ 3 -(J 3t...77-_ JTr"�-- Deck/Covered PatioImpervious `SFT: N Surface Area: 30% Slopes on Property: o. of Bedrooms: Construction ype: Heat Source: CS=4 Septic: TOTAL COST OF PROJECT: $ ( 000 �— DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional inJflc Raton may 6e require• • besubfii&ed and subs eauenlt Ica...vedbefore this application can be processed. CSignatur\ Date: ( 1/44 Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_ _Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: O Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mi1 vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space battle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations o Handrail / Guard height & spacing Sp®kane Valley - ",,f "- _ire ..C... Target Date sheet For City Use Only PLUS Project 1 f - Project Address 77n 7 ii.r..P 1 t 11703 E Sprague Ave Suite 8-3 1 Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 1 permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is /1-10 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required fir re-subnrtttals as project application reviewers work on multiple applications and it may he several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire reviety process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should he contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date Staff may contact you before the target date if the initial review is complete. By following this procedure, you it'll! save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 1 1 I 1 1 1 1 I i ttu; I 3 I 1 I f I 4 �TlI v citI 5 �7 1 ,t i Z -i ■ ■US Z1 ■ ■■ ■ i� ,■■■■moi■■■■■ Rs I ■■■■■■■ p I1 -- ■■ ■■ (1 -S 3 ; 20 E3 -I 050-. �� ( = CITY.6F ,: : SFr SPOKANE VALLEY— i� y ,,,�Q-.O`er C NOV 4 2011 �� j \ �� 2� i� o�C 4 M PERM T LENT BY: th-`—_! _ N 1 _ __ `o JI 1 5'6 1 k 1 .7217 I ;M i L r r(•I I I I,