Loading...
2011, 06-30 Permit App: 11001924 DeckProject Number: 11001924 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Date: 6/30/2011 Page I of 2 Permit Use: NEW 10 X 20 DECK Contact: HANDYMAN CONNECTION Address: 8123 E SPRAGUE AVE C - S - Z: SPOKANE VALLEY, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 922-7374 Group Name: Project Name: Site Information: , Plat Key: 001939 Name: PARK ROAD OIST ADD District: Nort Parcel Number: 45182.0435 Block: Lot: SiteAddress: 7608 E MAXWELL AVE Location:: CSV Owner: Name: PARKS, DAVID & YON Address: 7608 E MAXWELL AVE SPOKANE VALLEY, WA 99206 Zoning: R-3 SF Res District Water District: 100 SPO CO WATER DIST#3A Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 6/29/2011 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 6/29/2011 By: mpalaniuk Permits: Operator: jmm Printed By: JD Print Date: 6/30/2011 , Project Number: 11001924 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/30/2011 Page 2 of 2 Building Permit Contractor: HANDYMAN CONNECTION Firm: HANDYMAN CONNECTION Address: 8123 E SPRAGUE AVE Phone: (509) 922-7374 SPOKANE VALLEY, WA 99212 This Application: Total Project: Description Grp ho Notes So Ft Valuation Su Ft Valuation DECK OPEN R-3 VB PLAN 200 $3,000.00 200 $3,000.00 REVIEW FEE Totals: 200 $3,000.00 200 $3,000.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $83.25 WSBCC SURCHARGE - 1 SELECT $4.50 SF PLNS RVW < 7999 SQ FT 1 SELECT $33.30 Permit Total Fees: $121.05 Notes: Payment Summary: , Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit 5121.05 $121.05 $33.30 $87.75 $121.05 S121.05 $33.30 $87.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 6/30/2011 RE .0),,A, # -6tl.Y. \I \Name RE lsu'SIDENTIAL CONSTRUCTION PERMIT APPLICATION vEOCom\unity Development Department —1.11. iPermit Center 11703\East Sprague Avenue, Suite 8-3 1pokane Valley, WA 99206 I: (509) 688-0036 Fax: (599) 688-0037 ermitc-nter.s.okanevall (Staff Use Only) PERMIT NUMBER: PERMIT FEE: 0 NEW CONSTRUCTION 0 ADDITION/REMODEL `DECK 0 OTHER� SITE ADDRESS: 760e WefotAre {g ASSESSORS PARCEL NO.: fs / g,2 - U y3.c" LEGAL DESCRIPTION: ACCESSORY BUILDING BUILDING OWNER NAME: fe„,N J- ?t NAME: Dai pctAh ADDRESS: %C,(') e 5 c (r llNX (ktt// CITY: PHONE: STATE: (A)A FAX: CELL: ZIP: CONTACT NAME: � 5--/ PHONE: 70 ( -6-76. 0 FAX: CELL: CONTRACTOR NAME: f41/' �"rJ'/A/�cr,� ! �AyrM�C1L,� MAILING ADDRESS: 7/23 ��z, _ Arc ' ,w CITY: I/ PHONE: 92?�737/��FAKX: CELL: CONTRACTOR LICENSE No.: H�/L4i YG E D `Y EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: /1"-e JEitel s/ox ao STATE: 7 ZIP: 992/ 2. 7a)-57C�o ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: /VA Dimensions: /0-X2o• No. of Stories: �A Total Habitable Space: /l/� Main Floor SQ FT: �,/ ,r /b Upper Floor SQ FT: /1•7A Unfinished B Bement SQ FT: A//A Finished Bis ment SQ FT: Al fb Garage 5Q FT: N/A overed Patio SQ FT: p_oD i 00— ImpervioLs Surface Area: . ///t 300/0 Slope on Property: /t//A No. of Bedrooms: Construction Type: Heat Source: Sewer Septic: TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signatur Date: 41/92 9/// Updated 1-11-11 Page 1 of 1 http://www.spokanevatiey.org/filestorage/124/938/210/948/1496/Building_Permit_ _Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Window and door location and sizes o Header, beam or concrete lintel sizes ❑ Window well locations if applicable o Brace wall panel locations o Room usage labels o Water heater and furnace locations o Smoke detector locations o Exhaust fan locations ❑ Attic and crawl space access locations o Deck or concrete patio sizes and locations o Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations o Handrail / Guard height & spacing Spokane Valley® For City Usc Only,Q PLUS Project Number //—/ % Z./ Project Address • 7(00! f In:Jac:44 11703 E Sprague Ave Suite B-3 • Spokane.Valtey WA 99206 509:688.0036 t Fax: 509.688.0037 • permitcenter®spokanevalley.org ' M part of 'our bn-going' commitment: to customer service during -the' review process. of your project •application, we are providing`you with a TARGET DATE for the initial, technical; application review.,If for • any reason we cannot meet this date, we, will contact you with a revised. target date..` Your application review TARGET. DATE is The TARGET DATE is the 'date "we estimate your project applicati'on',willhave'had its initial, technical • review.. It is not the date for approval or,pei-niit issuance. Tips' for a Smoother Project Application Review.' i' Submit complete, accurate plans and documents. Evtrt1 (into nta1; be required for rc ,c'uhtruuulc as /iroject application' reyieryer5 -woa od: nntltiple applications nnd'it 1 mar he e. ret al clays befa'e they CCM look cu Pula tier ur 11'1 i.Scc! i f0/ina%ioni -. •i ', •• ', ^ Designate a'spccrtic contact, person to communicate with the City: ' ,' ;'; White die person designated as' the'apphcant'.c contnc1 person with Ihe'Citi- can he chcing(a' fine individual with.dte• . et'perti.ce,foi• dealing with rc yie** u confluents trould be the best choice /0/ 1/ie eh.tire-reriew process:.* Call staff regarding the status of your pioject only after•the target date shown at•the trip ot:the page. • i ' Although i,ou .should be contacted on or, hd the tat get date, please feel fire to cunmet u.s ifr(5u 1101 en'1 heard fi oin its by your target elate. Sta(f may contact you before the target.date:if the, id/nal7CWCty i.c:complete: Bv, folloning'dos • ' pracedtu e, you frill sore• time and alloy* the relic* ers to complete the trbrk n/nre,eapeditious1*' Steps in the Permit Process I. Counter, Complete. 'Your application has been accepted as _counter c"6mplete:,`This means all of -the .required documents, as indicated on ,your Pre -Application Checklist have -been submitted" er have been ;approved : for deterred submittal. This docs not prevent technical staff from requesting' additional'intormation, is a result of their technical review. 2. Quality Check. The next step in the.process is a quality check to make sure that. the. application isrevie�w�able and Tree from substantive flaws that would prevent technical staff froth completing:the technical' review oncel.it is started.: When ' this step is ctimplete,'your, application till be routed :to the:appropriate stall: and remain in their review queue_ until it comes up for review. 3. Technical Compliance. Once an application is adniinistratiiely'complete, it is routed'to,technical:staff for compliance review. Depending on the:type of project, technical stall may. include multiple_ reviewers. You should -be contacted by phone, fax. cnlail,.or mail by your TARGET DATE once the initial technical,compli ince review,is com•plete 4, Permit Issuance. When the technical compliance review of the application is_ complete. including any subsequent re-. . submittals, each reviewer will approve their sectioit'offhe application and route it to, the -Permit all sections: of the application are received,.a'Perntit Specialist will process the application and contact the. person. specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. . . - - WHITE - APPLICANT PINK -BUILDING FILE REV 9/07 11 AXwEu AVS. 1() 76 CO c\b qq `,5 ao- /0' sq' PLANNING DEPT. APPROVED BY. DATE: 6/2940 RECEIVED CSV PERMIT CENTER JUN2 7011 w..�f 11- ) Z Name L =� Submittal #___