2011, 05-24 Permit App: 11001428 Pole Bldg0
Projact Number: 11001428 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 5/24/2011 Page 1 of 2
Project Information:
Permit Use: NEW 30 X 36 POLE BLDG FOR GARAGE Contact: THOMAS, KIMBERLY K
Address: 9609 E MAXWELL AVE
C - S - Z: SPOKANE VALLEY, WA 99206-4022
Setbacks: Front Left: Right: Rear: Phone: (509) 220-9579
Group Name:
Site Information: Project Name:
Plat Key: Name: MISSION ADD District: Nort
Parcel Number: 45172.0216 Block:
SiteAddress: 9609 E MAXWELL AVE
Location:: CSV
Zoning: R-3 SF Res District
Water District: 011 MODERN
Area: 11,200 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Lot:
Owner: Name: THOMAS, KIMBERLY K
Address: 9609 E MAXWELL AVE
SPOKANE VALLEY, WA 99206-402
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 5/24/2011 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:
Originally Released: 5/24/2011 By: tschmidt
Permits:
Operator: jmm Printed By: jmm
Print Date: 5/24/2011
1%
Project Number: 11001428 Inv: 1
Application
Date: 5/24/2011 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Su Ft Valuation
POLE BDLG U-1 VB PLAN 1,080 $20,520.00 1,080 $20,520.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Totals: 1,080 $20,520.00 1,080 $20,520.00
Units Unit Desc Fee Amount
1 SELECT $335.25
1 SELECT $83.81
1 SELECT $4.50
Permit Total Fees: $423.56
Notes:
Pursuant to SVMC 19.40.020(B) All residential driveways shall be paved...with an approved hard
surface material.
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $423.56 $423.56 $83.81 $339.75
$423.56 $423.56
$83.81 $339.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 5/24/2011
�% _ Community Develo. ent DePfeCftiEIV
%�\\��\ Permit7Center SSs�u t?�-84MiT C
CITI'0F 11703 East Spragu= Aven
Spokane Tel: (509) 688-003
Spokane Valley, W • 99206 /A
MTY,C
Valley. ey. Fax: (509) 688-00 project #_±({±/t____
'acne
Submittal #
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
D (Staff Use Only)
NFERcuT N MBER:
1 PERMIT FE :
S_NEW CONSTRUCTION
DECK
SITE ADDRESS: ,C 9(,O q
ADDITION/REMODEL ET ACCESSORY BUILDING
OTHER
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME:
NAME:
d'en 7-A0,74
ADDRESS: /Z 9420 c% ,2/ 2 (tea/ -f `/
CITY: 4„....5/.4
PHONE: 5-a7 22_o
95'7/
STATE: Cf/�— ZIP: P/ 20" c,09
FAX: CELL:
CONTACT NAME: /�K
PHONE: 2Z O /CJ/- 7 f
CONTRACTOR NAME:
FAX: CELL:
MAILING ADDRESS: >1490/..e._ --
CITY: �0/..e._--
CITY:
STATE: ZIP:•
PHONE:
FAX: CELL:
CONTRACTOR LICENSE No.:
EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
/4,5 r -Y ternnrc (JG,/c i/) S//a, FJc»
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:
/ r-
Dimensions:
Sox 3lo X 16
No. of Stories:
/
Total Habitable
Space: Q en
Main Floor SQ FT:
/ &t o`
Upper Floor SQ FT:
Unfinished Basement SQ
FT:
Finished Basement SQ
FT:
Garage SQ FT: i(//_
O ex.—FT:
Deck/Covered Patio SQ
Impervious Surface
Area:
30% Slopes on
Property:
No. of Bedrooms:
Construction Type:
Heat -Source: 'to (
Sewe or Septic:
TOTAL COST OF PROJECT: $
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done In full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be required to be submitted a • subsequently approved before this application can be processed.
Signature 71
Date: 5`'2 3- //
Updated 1-11-11 Page 1 of 1
http://wwwspokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit__Residential_11-11-11.doc
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
O Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing
o Header, beam or concrete lintel sizes
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with 6mil vapor barrier
Miscellaneous Construction Details
O Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
O Stairway tread rise & run and nosing
o Window and door location and sizes
o Window well locations if applicable
o Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
o Handrail / Guard height & spacing
Spokane
Valley°.
For City Use_ Only •
/
PLUS Project Number /7 -AY -28
Project Address • "91,2g r /%/eze.TidL//
11703 E Sprague Ave Suite B=3 •Spokane Valley WA 99206 •
509.688.0036 ♦ Fax: 509.688:0037 • permitcente'h» pokanevalley,org
As pad of our on-going commitment to customer service during"' the re`view`processr:of;your. project
application, we are providing you' with a TARGET DATE for the initial. technical application review. if for,
any reason we cannot meet this.date, we will contact you with a revised target date..
Your 'application review TARGET DATE is!
The TARGET DATE is the date.. we estimate, your project application, will have had its initial technical,
review. It is not the date for,approval'or permit issuance.
Tips for a Smoother Project Application'Review
Submit complete,.accurateplahs and documents. .
Ls'!ru tune may be regiciree_/or-re-.s ubnn'lmis as project application revicu ers ir04 an tnuhiple, applica(ions 'anal it:
nut; be several days he fore the. can look at malt' neiv unrevised infarmcitioti.__`
Designate a specifie .contact person to.cotttinunicate with the City. • ' .'
While the persu/t designated as the applican(•,s contact Person with the,Citi can be changed, one indiviclual with the
expertise for dealing with.re viewer ebnunents,would be. (he hest choice fin- the entire review pl'obess.:
➢ Call staff regarding the status of your project only after the target date shoes n at•the top of the page.'.: .
Although you should be contietetl vin iii by the target date, pleo.ce'Jecl,free to contaci us it :y/1 //ast//'l hcard.f itni us
by your targe( date. Stall may contact, you heroic'(he (aigei.dcne,if the initialaeyiew is eo.nipiete.'l3v jollotiing this
procedure, you will sane (ince and allow the reviewers lgcomple(e the work-more,expedihou,slv.,
Steps in the Permit Process'
1. Counter Complete. Your applicationrhas been accepted as counter' complete., This means, all of-the:required
documents, as indicated on your Pre -Application Checklist liavc been submitted: .or `have been approved • for deferred :
submittal. This does not prevent technical staff from icqucsting additional infoniiation as -d- result of their; technical•resiew.
2. Quality Check, The nest step in the:process, is a'quality check'to•make ,
suretha't the applicationis reviewable'and free
•from substantive flaws that would prevent technical staff from completing.the'technical review once it is started. 'When .
this step is complete, your application will be routed -to the appropriate staff'tind remain in• their review queue until it
comes up li' review: . . •
•
3. Technical Compliance. Once'an application is admiitistratively.,complete,:it is routed to technical stall tbr compliance -
review.. Depending on the type of project, technical staff nuiy include multiple 're'viewers: You should be 'contacted by
phone, fax, email, or mail.by your TARGET DATE Once the initial technical compliance revielc. is.complete.'
4. Permit Issuance. When the technical compliance review of the application is:'complete;'including,any. subsequent. re
submittals. each reviewer will approve their section of the application and route it to'the Per mit:Centcr::Wheit all sections
of the application are received. a Permit Specialist' will process:the application -and contact the person specified on. your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that -time. . • , ' , . ,
WHITE -APPLICANT PINK -BUILDING FILE
REV 9/07
'‘-c,/ ifig xtrt:e It Al
1-1
5
4b
!Yi A 3
PLANNING DEPT. APPROVED
BY.
DATE: 5
RECEIVED
CSV PERMIT CENTER
MAY 23 Zflhl
Project #
Narrle
Submittal #
0 (
15-
3c) 34.) (C)
Pk BLIldtits
ara