Loading...
2011, 04-19 Permit App: 11000922 Pole BldgProject Number: 11000922 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Date: 4/19/2011 Page 1 of2 Permit Use: 36 X 24 POLE BLDG Contact: COTSFORD, KATHLEEN R Address: 9614 E MAXWELL AVE C - S - Z: SPOKANE VALLEY, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 927-3488 Group Name: Site Information: Project Name: Plat Key: Name: Range District: Nort Parcel Number: 45172.0402 Block: Lot: SiteAddress: 9614 E MAXWELL AVE Location:: CSV Zoning: R-3 SF Res District Water District: 011 MODERN Owner: Name: COTSFORD, KATHLEEN R Address: 9614 E MAXWELL AVE SPOKANE VALLEY, WA 99206 Hold: ❑ Area: 0 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: , Review Building Plan Review Released By: Originally Released: 4/19/2011 By: TMELBOU Landuse/Zoning/HE Conditions Released By: Originally Released: 4/14/2011 By: kkendall Permits: , Operator: JD Printed By: JD Print Date: 4/19/2011 Project Number: 11000922 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/19/2011 Page 2 of 2 Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB PLAN 864 $16,416.00 864 $16,416.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 864 $16,416.00 864 $16,416.00 Units Unit Desc 1 SELECT I SELECT 1 SELECT Fee Amount $279.25 $69.81 $4.50 Permit Total Fees: $353.56 Notes: Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $353.56 $353.56 $69.81 $283.75 $353.56 $353.56 $69.81 $283.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 4/19/2011 • Spoie #Valley° Community Develop Permit Center rev PFRMIT C 11703 East Sprague Avenue; Suite B-3 Spokane Valley, WA p9206 ent Department/�AV� Tel: (509) 688-00361 APR 13 Fax: (509) 688-0037i pro;, ; Z permitcenterC°lspokanevalle . Name Submittal #_ RESIDENTIAL CONSTRUCTION PERMIT APPLICATION LATER (Staff Use Only) PERMIT NU BER: 11PERMIT FE X NEW CONSTRUCTION E ADDITION/REMODEL 0 ACCESSORY BUILDING 0 DECK El 0 OTHER �/ \J OA ADDRESS: GI(52lL) C, 0103/4,06,\0103/4,06,\ ewe tp&FOmQ ,vO&\ ASSESSORS PARCEL NO.: Use f z, ot-/0 L LEGAL DESCRIPTION: BUILDING OWNER NAME: NAME: 11 ) Qct a c\ ADDRESS:: U u3C\ \ Wu CITUESc<ai_STATE: ZIP:(20 2\CL1 PHONE ,/7-3469 CONTACT NAME: 1Kf,\ ke_1 FAX: CELL: PHONE: FAX: CELL: CONTRACTOR NAME: mead MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE NO.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: Pbu' It2 4M t Sikh c3 Car gar 4I' ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak:/ Go i Dimensions: 4, 2y J b JK2,/ /` No. of Stories: / Tottal Habitatal� t' Main Floor SQE6 I/ f 1 Upper Floor SQ FT: Unfinished Basement SQ FT: Finished Basement SQ FT: Garage SQ FT: 6-60.j 0(% Deck/Covered Patio SQ FT:Area: ��II 4 Impervious Surface 300/0 Slopes on Property: No. of Bedrooms: Construction Type: C0 Heat Source: Sewe)or Septic: TOTAL COST OF PROJECT: $ /0,701) DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature WA\ Date: Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_ _Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances ❑ Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions • o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation O Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any. ❑ Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Spokane Valley For.City Use Only PLUS Project •Number//`• 9,:a . Project Address 9(p/c/ E i'TLL.Fi&2'// 11703 E Sprague Ave Suite 1313 • Spokane ValleyWA.99206' 509.688.0036 ♦ Fax: 509.688.0037 1 permitcenter®spokanevaltey.org As part: of our on-going ,commitment t�. customer service during She. review .-process of your'project application, we are providing you with a TARGET DATE for the initial technical application review` if for any reason we cannot meet this date,'we will contact you, with a revised targetdate: Your application review TARGET DATE is ..„ 4// Q / ,j The TARGET DATE 'is the 'date we'estimate your, project application ,will ,have had its .initial technical ,review. It is not the date'for approvalor permit issuance.„ This fora Smoother. Project Application Review Submit complete, accurate:plans'and tlocuincitts..' . • • .i aro time 117(1:1, be required fir r,s e-ubtnutals as.project applicaiion'rtivietrers;iitin•it on multiple' applications iynCl it may be se1eral days before thei-'can look iii va' unein or revised information: ':- Designate a specific contact person to communicate with the City. ' While the' person designated as the upp/icant's &intact person with.the Cine eta he. chcuiged, one indii iduali11/11 the ctrperti..,e fir dealing With rcrieruvc0nnnents would he the hest choice, for7he,,entireaepiew process.: . ' Call staff regarding the status of your project only atter the tin -get -date shown at lhe.top of the page.. Although 17021 should be enfiladed on'br br'the target (1(111. please feel fee. to'cat/ac us.if yq}t liai-en'theardJi.an us ' by your target date. Slajf ma* contact•vo21 befae the target date if the initiahrerieti is complete: •Bi'Jollouing this • procedure, you will safe time and allots the t-el'iewers to complete the work,mare t tpedi l ush-. • • Steps in the Permit Process 1. Counter Complete Your application: has, been 'acccpiedas counter..complcte;This: 'mcans,all of the.required 4. documents,,as indicated on your I're:Application Checklist have been submitted of 'have" been`;tipproved'.,,for .deferred' submittal. This does not prevent technical staff.from requesting additional information asp ie'sult of their technical.revicw. 2. Quality Check. The next step in the process.is crqualify-check to make sur. that the application is resied'ableand tree from substantive tlaivs that. Would prevent technical staff from completing the technical review onee it is started: Whets this step is complete, your application will be routed to the appropriate staff and- reniain in' their, review"queue until it comes tip for review. 3. Technical Compliance. Once an application is.administ ativel); coMplete, iris routed to technical staff for=compliance review. Depending on'the type of project, technical staff; may -include Multiple reviewersi'You shoidd be contacted by phone, fax. email, or•mml by your TA RGET'DATE once the initial technical'compliance revies\' is complete.; 4, Permit Issuance. When the technical compliance review Of -the application is• complete, ineluding any -subsequent re submittals, each reviewer will approve their section of the application and routc.it to the Permit Center: When'all sections of the application are.received, a Permit Specialist will process the application and' contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (ifrcgtiired)will be provided by • the Permit Specialist at that time. • WHITE -APPLICANT PINK -BUILDING FILE ' REV 9/07