Loading...
2012, 09-13 Permit: SW-12002206 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002206 Permit Issued Date: 09/13/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION ELECTRIC RR SEWER Primary Contact: Applicant: Address: Phone: Email: SWAN'S GROUND WORK SWAN'S GROUND WORK 14415 N FORKER RD SPOKANE, WA 99217 509-465-4751 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 8214 E MARIETTA AVE 45072.5607 ORCHARD AVENUE ORCHARD AVE ADD W68' OF E1/2 OF BLK 180 EXC S27' Owner: Address: Phone: Email: MAJOR, CARL W 2815 N LAURA RD SPOKANE, WA 99212-2253 Water District: Orchard Fire District: Spokane Valley Fire Avenue Irrigation District #6 Land Area: 8219 Square Feet CONTRACTOR INFORMATION: General Contractor SWANSGW951 LT SWAN'S GROUND WORK 14415 N FORKER RD SPOKANE, WA 99217 509-465-4751 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 09/13/2012 12:17:43 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT s Permit Issued Date: Application Number: SW -12002206 09/13/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 09/13/2012 12:17:43 Printed by: IIS APPPOOL\ASP.NET v4.0