Loading...
2011, 12-07 Permit App: 11003768 ResidenceProject Number: 11003768 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/7/2011 Page 1 of 2 Project Information: Permit Use: SFR W/ATT GAR Setbacks: Front Site Information: Plat Key: Parcel Number: 45091.3005 Left: Right: Rear: Name: Range Block: SiteAddress: 11624 E MARIETTA LN Location:: CSV Zoning: MF -2 MF HDR District Water District: 026 IRVIN Area: 4,150 Sq Ft Nbr of Bldgs: 0 Review Information: Review Building Plan Review Other Reviews Width: 0 Nbr of Dwellings: 0 Contact: Address: C - S - Z: Phone: (509) 951-0239 Group Name: Project Name: District: Nort Lot: Owner: Name: SVG VIEW RANCH, LLC Address: 2910 E 13TH AVE SPOKANE, WA 99202 - Hold: ❑ Depth: 0 Right Of Way (ft): 0 Released By: Originally Released: 12/5/2011 By: tmelbourn HAVE NEW APPLICATION Released By: Originally Released: 12/7/2011 By: MBonduran Landuse/Zoning/HE Conditions Driveway/Approach Released By: Originally Released: 12/1/2011 By: mharnois Released By: Originally Released: 12/6/2011 By: TMELBOU Operator: JD Printed By: MBB Print Date: 12/7/2011 Project Number: 11003768 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/7/2011 Sewer Review Permits: Released By: Page 2 of 2 PER SPOKANE COUNTY PERMIT #11006104 Originally Released: 12/6/2011 By: MBonduran Contractor: UNKNOWN Address: UNKNOWN UNKNOWN, WA UNKNOWN Description Grp Type Notes 1&2 FAMILY R-3 VB DECK OPEN R-3 VB GAR WOOD U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Building Permit Firm: UNKNOWN Phone: (000) 000-0000 This Application: Total Project: Su Ft Valuation Su Ft Valuation 1,037 $104,685.15 1,037 $104,685.15 56 $840.00 56 $840.00 456 $8,664.00 456 $8,664.00 Totals: 1,549 $114,189.15 1,549 $114,189.15 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Notes: MECHANICAL AND PLUMBING PERMITS REQUIRED FRONT SETBACK APPROVED PER ADE -09-11 Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $1,513.35 $1,513.35 $1,513.35 $1,513.35 Fee Amount $1,077.75 $4.50 $431.10 $1,513.35 Amount Paid $426.62 $426.62 Amount Owing $1,086.73 $1,086.73 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: MBB Print Date: 12/7/2011 Spokane RESIDENTIAL CONSTRUCTION PERMIT APPLICATION Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 oermitcenter(aspokanevallev.ora (Staff Use Only) PERMIT NUMBER: PERMIT FEE: ,NEW CONSTRUCTION 0 DECK 0 ADDITION/REMODEL 0 OTHER SITE ADDRESS: //‘,2 c/ 6 /1"(4,'e c l�/D /,i -4- - ASSESSORSPARCEL NO.: LEGAL DESCRIPTION: s 5 — 63 a to- ,-'4 0 ACCESSORY BUILDING BUILDING OWNER NAME: <5,26 - NAME: k NAME: SSC /le �� �te1 (�. ADDRESS: CITY: STATE: PHONE: -67 1. f 6 cf, 2 3 FAX: S G r 673 / //J` Z CONTACT NAME: ZIP:7. CELL: SCS e7,57c3737 PHONE: 3-0? f/ d� 3 �' FAX: —5-0 3 Y (/ 5- - CELL: —.6'0 CONTRACTOR NAME: /7)9)--- '% (--e5.4.- MAILING ADDRESS: l Qi Ei G ," 17 CITY: c. ./ STATE: Gv J) ZIP: ! - G� 23 PHONE: �GI S-3-5 ` � C7 �� FAX: CONTRACTOR LICENSE No.: /-riAI/ ' ae, --4EXPIRES: /(7 ��/.g CITY BUSINESS LICENSE NO.: CELL: 'SO? ? 4i3,3 ? 6✓ DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ****YOU MUST COMPLETE THE FOLLOWING**** N/A IF NOT APPLICABLE Height to Pe7k: Dimensions: .'G ?,/"/ c' No. of Stories: 6--e Total Habitable Space: /e3 i Main Floor SQ FT: /0.,`7 Upper Floor SQ FT: Unfinished Basement SQ FT: FinishedBasement SQ FT: Garage SQ FT: yS_6 Deck/Covered Patio SQ FT: ,se-/ Impervious Surface A Q iz 0 P� 30% Slopes on Property: No. of Bedrooms: . , Construction Type: C.� t Heat Source: -K-- Sewer or Septic: 5: -k --r-2 TOTAL COST OF PROJECT: $ e> DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permiss .n to re resent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Devel.pment ',ode. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is a1.ermit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional Information may be req i o ;e submitted and subsequently approved before this application can be processed. Signature Date: / .t24A Updated 1-11-11 Page 1 of 1 http://www.spoka neva) ley.org/filestorage/124/938/210/948/ 1496/Building_Permit_-_Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Window and door location and sizes o Header, beam or concrete lintel sizes ❑ Window well locations if applicable o Brace wall panel locations o Room usage labels o Water heater and furnace locations o Smoke detector locations o Exhaust fan locations o Attic and crawl space access locations o Deck or concrete patio sizes and locations o Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing '°""-",?[..787TrarovIrr- AUK COUg SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Site Information Project Information • Address: 11624E MARIETTA LN Number: 4509L3005 bdivision: CITY OF SPOKANE VALLEY Block: Lot: Zoning: Owner: SVG VIEW RANCH, LLC Address: 2910E I3THAVE SPOKANE, WA 99202- [g Inspector: ater Dist: Project Number: 11006104 Inv: I Issue Date: 11/22 Permit Use: SEWER CONNECTION Applicant: C & L EXCAVATION 26826 N SPO 1'1 -ED RD DEER PARK, WA 99006 Phone: (509) 993• Contact: C & L EXCAVATION 26826 N SPO I-1ED RD DEER PARK, WA 99006 Phone: (509) 993-1 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: Permits :onnection Permit Contractor: C & L EXCAVATION License #: CLEXCLE962RP SEWER CONNECTION 1 $125.00 PROCESSING FEE 1 $25 Total Permit Fee: $15C ;OR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO ►VER. ONE WORKING DAY NOTICE REQUIRED. PERMTF ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL SPECTION FEES APPLY AFTER 30 MINUTES. NSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY • REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE EVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY NE ACCEPTABLE GRADE AND ARE CLEAR. AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO LOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. ME INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. oTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO itNERS OF UNDERGROUND FACILITIES. 3ALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE . QUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, MUDING THOSE RELATED TO TRENCH SAFETY. Payment Summary Cotal Fees AmountPaid AmountOwing Tran Date Receipt # Payment Amt $150.00 $150.00 $0.00 11/22/2011 5374 $150.00 ped By: SHATTO, JULIE ted By: Force, Faith Page 1 of 1 PERMIT • Valley Target Date sheet For City Use Only PLUS Project Project Address i 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 es $ 6t, "-4 1.S 01' e /3 v , ! Projec //). g -77