2009, 07-22 Permit App: 09002134 ResidenceProject Number: 09002134 Inv: I Application Date: 7/22/2009 Page 1 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information:
Permit Use: SFR W/ATT GAR
Contact: HAYDEN HOMES, LLC
Address: 2464 SW GLACIER PL #110
C - S - Z: REDMOND, OR 97756
Setbacks: Front Left:
Right: Rear:
Phone: (509) 413-6340
Group Name:
Project Name:
Site Information:
WUA �..,
Plat Key: Name:
Range
District:
Parcel Number: 45091.2903 Block:
SiteAddress: 11723 E MARIETTA AVE
Location:: CSV
Zoning: R-3 SF Res District
Water District: 026 IRVIN
Area: 5,873 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Lot:
Owner: Name: HAYDEN HOMES, LLC
Address: 2464 SW GLACIER PL #110
REDMOND, OR 97756
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review Information: .� .., a .. , .. .w ..
Review
Building Plan Review
Released By:
Originally Released: 7/21/2009 By: tmelbourn
Driveway/Approach Released By:
Originally Released: 7/22/2009 By: WMCGAV
Landuse/Zoning/HE Conditions Released By:
Originally Released: 7/17/2009 By: cjjanssen
Sewer Review Released By:
Originally Released: 7/16/2009 By: jdavis
Permits: '* -4,
Operator: JD Printed By: jmm Print Date: 7/22/2009
Project Number: 09002134 Inv: 1 Application Date: 7/22/2009 Page 2 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: HAYDEN HOMES LLC
Address: 2464 SW GLACIER PL STE 110
REDMOND OR 97756
Item Description
APPROACH -CONST IN ROW
Contractor: HAYDEN HOMES LLC
Address: 2464 SW GLACIER PL STE 110
REDMOND OR 97756
Description Grp Type Notes
1&2 FAMILY R-3 VB
DECK OPEN R-3 VB
GARAGE U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Approach
Firm: HAYDEN HOMES LLC
Phone: (541)923-6607
Units Unit Desc Fee Amount
1 NUMBER OF $50.00
Permit Total Fees: $50.00
Building Permit
Firm: HAYDEN HOMES LLC
Phone: (541)923-6607
Contractor: COMPLETE HEATING & SHEET
Address: PO BOX 3934
SPOKANE, WA 99220
Item Description
GAS WATER HEATER
GAS APPLIANCE<=100,000BTU
HOOD -TYPEI
RANGE
AIR HANDLER <=10,000 CFM
Total Project:
This Application:
Valuation
Sg Ft
Valuation
24
1,031
$99,831.73
$7,600.00
24
$360.00
$52.00
400
$7,600.00
Totals:
1,455
$107,791.73
Units
Unit Desc
Permit Total Fees:
1
SELECT
1
SELECT
1
SELECT
Contractor: COMPLETE HEATING & SHEET
Address: PO BOX 3934
SPOKANE, WA 99220
Item Description
GAS WATER HEATER
GAS APPLIANCE<=100,000BTU
HOOD -TYPEI
RANGE
AIR HANDLER <=10,000 CFM
Total Project:
Sp Ft
Valuation
1,031
$99,831.73
24
$360.00
400
$7,600.00
1,455 $107,791.73
Fee Amount
$1,038.55
$4.50
$415.42
Permit Total Fees: $1,458.47
Mechanical Permit —
Firm: COMPLETE HEATING & SHEET
Phone: (509)533-9528
Units
Unit Desc
Fee Amount
1
NUMBER OF
$11.00
1
NUMBER OF
$13.00
1
NUMBER OF
$52.00
1
NUMBER OF
$10.00
3
NUMBER OF
$39.00
Permit Total Fees:
$125.00
Operator: JD Printed By: jmm Print Date: 7/22/2009
Project Number: 09002134 Inv: 1 Application Date: 7/22/2009 Page 3 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: C & K PLUMBING
Address: 5231 W NAVAJO
SPOKANE, WA 99208
Plumbing Permit
Firm: C & K PLUMBING
Phone: (509) 489-3906
Item Description
Units Unit Desc Fee Amount
TOILETS/BIDETS
2 NUMBER OF
$12.00
SINKS
2 NUMBER OF
$12.00
TUBS
2 NUMBER OF
$12.00
DISH WASHERS
1 NUMBER OF
$6.00
GARBAGE DISPOSAL
1 NUMBER OF
$6.00
CLOTHES WASHER
1 NUMBER OF
$6.00
MISCELLANEOUS FIXTURES
2 NUMBER OF
$12.00
Permit Total Fees:
$66.00
Notes:t�F
Saw cutting of existing curb is not allowed within the City's jurisdiction. Driveway is to be inspected by
the City's ROW Inspector prior to concrete placement.
Payment Summary:
Permit Type
Fee Amount Invoice Amount Amount Paid
Amount Owing
Approach
$50.00 $50.00 $0.00
$50.00
Building Permit
$1,458.47 $1,458.47 $417.66
$1,040.81
Mechanical Permit
$125.00 $125.00 $0.00
$125.00
Plumbing Permit
$66.00 $66.00 $0.00
$66.00
$1,699.47 $1,699.47 $417.66
$1,281.81
liicnini�ss nv•
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 7/22/2009
Spokane
jValley.
Community Development
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.Mokanevalley.org
PERMIT NUMBER:
PERMIT FEE:
Residential Construction [-New Construction ❑Accessory Bldg
Permit Application ❑ Addition/Remodel ❑ Deck
❑ Other:
SITE ADDRESS: /l 723, 5r 04o-: a f%
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
Name:
# OF STORIES:
Address:
2- 9'd, 4" <tqj
Fhone.
�.�� State: DKZip:If7�SZ
3
Sys l3 .9� Fax:
Contact Person
Name: 2 t Se ,,« /I -
Phone: /'r- a.; -Vo
Contractor:
Name:
Address:
City: State: Zip:
Phone: Fax:
Contractor Lic No: Exp Date:
City Business Lic. No:
Describe the scope of work in detail: Cost of Project: $
. / A 2a. p
Proposed Use:,��/�7
**************The following MUST be com Tete: write N/A if notapplicable)
**********************
HEIGHT TO PEAK:
''
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
S"/`
3
MAIN FLOOR TO SQ.
2 FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
FTG:
_
AREA:
o3
FINISHED BASEMENT
GARAGE SQ. FTG:
DE OV. ?ATIO SQ. FTG:
30% SLOPES ON
SQ. FTG: —
c.y'oG d,--"
( --q 1
PR TY:
# OF BEDROOMS:
CONSTR CT/J��.(QN.. TYPE:
HE RCE:
R SEPTIC?91-f
5
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check ❑ Mastercard
Expires:
DATE:
sA IBM
VIN#: �.i
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
❑ Property lines and dimensions ❑ Setbacks to property lines
❑ Direction arrow pointing North and orientation to streets ❑ Distance between buildings
❑ Proposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location & sizes
❑ Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
❑ Footing sizes and locations ❑ Supporting wood cripple walls or beams
❑ Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting
❑ Crawlspace ventilation beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
❑ Floor Joist direction, size and spacing ❑ Window and door location and sizes
❑ Header, beam or concrete lintel sizes ❑ Window well locations if applicable
❑ Brace wall panel locations ❑ Room usage labels
❑ Water heater and furnace locations ❑ Smoke detector locations
❑ Exhaust fan locations ❑ Attic and crawl space access locations
❑ Deck or concrete patio sizes and locations ❑ Fire Wall construction
❑ Roof Plan:
❑ Engineered truss direction and spacing
❑ Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
❑ Slope/ roofing material/ underlayment/ ice dam protection
❑ Sheathing size and type
Ceiling
❑ Joist size and spacing
Wall
❑ Height/ top plate/ stud size and spacing/ sole plate
❑ Exterior sheathing size and type
Floor
❑ Joist size and spacing
Foundation Wall
❑ Concrete or Masonry unit width
❑ Earth to wood separation distance
Footing
❑ Size
Radon
❑ Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
❑ Floor plan/ side view/ dimensions
❑ Floor Joist/ decking direction, size and spacing
❑ Ridge, eave and valley lines
❑ Beam and girder size and location
❑ Truss or rafter size, spacing & connection
❑ Attic insulation/ air space baffle/ ventilation
❑ Size of ceiling gypsum wall board
❑ Siding/ exterior house wrap/ anchor bolts
❑ Insulation, vapor barrier, gypsum wall board
❑ Sheathing or concrete floor size/ insulation
❑ Footing bottom to finished ground level depth
❑ Horizontal & vertical reinforcement if any
❑ Reinforcement if any
❑ Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
0 Stairway tread rise & run and nosing 0 Handrail / Guard height & spacing
Permit Center
�O�le 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER:
`�'' Spokane Valley, WA 99206
VQ.11ey(509)688-0036 FAX: (509)688-0037 PERMIT FEE:
Community Development permitcentergspokanevalley.org
Mechanical Permit Application / ❑ Commercial esidential
SFFE ADDRESS: // 7 2 3 or
Building Owner
Name: A�tz.,w Phone: — f?3 -a ;7 Fax:
Address:L 6 . W u� City: State: K Zip: * 775Z
Contractor
Name: �� ( Phone: 3 3 9S 7 G Fax:
Address: City: o /ice �g State: �� Zip:
License No: City Business Lic:
Contact/Project Manager:
Name: !� w / Phone: / - 6 3yU
EXPIRES: VIN:
❑CASH ❑ CHECK ,{)VISA El MC -0,
,� CARD #: 1/ SIGNATURE
http://www.spokanevalley. org/uploads/Community_Development/Documents/Forms/Building/MechanicalPermitAppl i cati onO4O3O9.doc
#UNITS
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Up to & including 100,000 BTU
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER
0-3 TON
AIR CONDITIONER
Over 3-15 TON
AIR CONDITIONER
Over 15-30 TON
AIR CONDITIONER
Over 30-50 TON
AIR CONDITIONER
Over 50 TON
GAS WATER HEATER
If
GAS PIPING SYSTEM each outlet
GAS LOG, FIREPLACE, & GAS INSERT
APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT
REPAIRS OR ADDITIONS
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
0 to 3 h 100,000 BTU or less
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 3 - 15 h —100,001 to 500,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 15 — 30 h - 500,001 to 1,000,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 30 h — 1,000,001 to 1,750,000 BTU
BOILER, COMPRESSORS ABSORPTIONS SYSTEM
Over 50 h — over 1,750 000 BTU
AIR HANDLER DOES NOT include ducting)
Each unit up to 10,000 cfm, including ducts
AIR HANDLER DOES NOT include ducting)
Each unit over 10,000 cfm
EVAPORATIVE COOLERS other thanportables)
VENTILATION AND EXHAUST
Each fan connected to a sine duct
VENTILATION AND EXHAUST
Each ventilations stem
VENTILATION AND EXHAUST
Each hood served by mechanical exhaust
INCINERATORS
Installation or relocation of residential
INCINERATORS
Installation or relocation of commercial
APPLIANCES
Range, Clothes Washer
UNLISTED APPLIANCES
Under 400,000 BTU
UNLISTED APPLIANCES
Over 400,000 BTU
HOOD
Type I
HOOD i
Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM — FREE STANDING
EXPIRES: VIN:
❑CASH ❑ CHECK ,{)VISA El MC -0,
,� CARD #: 1/ SIGNATURE
http://www.spokanevalley. org/uploads/Community_Development/Documents/Forms/Building/MechanicalPermitAppl i cati onO4O3O9.doc
'1;0*VaHe'x
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
permitcentera,spokanevall ey. orc
PERMIT NUMBER:
PERMIT FEE:
Community Development
Plumbing Permit Application ❑ Commercial [-dBesidential
SIFFEADDRESS: Z/743 £ -eA4 r/Vf
Building Owner
Name: s
t
Phone: I J . 4"el Fax:
Address: 4/i w s
v Crty. Stale:OK
Zip. 77
Contractor
Name:
Phone: _ 3 Fax:
Address:
City: State:
Zip:
License No:
City Business Lic:
Contact/Project Manager:
Name: t r�u w
Phone: 61/ — L pe6
# OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS
Z
URINALS
TUBS
Z
SHOWERS r trap)
SINKS
Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food,
Prep/Culinary Prep/CulinaryMeat
DISHWASHER
CLOTHES WASHER
1
GARBAGE DISPOSAL
WATER SOFTNER
FLOOR DRAIN
Area, Case Coil, Trench Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN, DRINKING
WATER PIPING/DRAIN-IN WASTE
Installation Alterations, Repair, Reversals
WATER USING DEVICE
Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER
If Gas See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS
Including traps, vents except kitchen type grease interce tors functioning as fixture traps
REPAIR OR ALTERATION
Water piping, drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE
Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
❑CASH ❑ CHECK U/ISA MC
Card#
SIGNATURE:
EXPIRES:
/AlzVIN:
CURRENT FEES AVAILABLE AT: http://www.spokanevalley.orq/ under the quick links for Forms, Master Fee Schedule.
http://www. spokaneval ley. org/uploads/Community_Development/Documents/Forms/Bui Iding/Plumb ingPermitAppl icationO4O309. doc
SPOK4 COWY
Site Information
SPOKANE COUNTY
DEPARTMENT OF BUILDING & PLANNING
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Address: 11723 E MARIETTA AVE
Parcel Number: 45091.2903
Subdivision: CITY OF SPOKANE VALLEY
Block: Lot:
Zoning:
Owner: HAYDEN HOMES, LLC
Address: 2464 SW GLACIER PL #110
REDMOND, OR 97756
Building Inspector:
Water Dist: IRVIN
Sewer Connection Permit
Project Information
Project Number: 09003389 Inv: 1 Issue Date: 7/16/2009
Permit Use: SEWER CONNECTION
Applicant: DEAN'S EXCAVATION
PO BOX 698
DAVENPORT, WA 99122 Phone: (509) 721-1020
Contact: DEAN'S EXCAVATION
PO BOX 698
DAVENPORT, WA 99122 Phone: (509) 721-1020
Setbacks - Front: Left: Right: Rear:
Group Name:
Project Name:
Permits
Contractor: DEAN'S EXCAVATING License #: DEANSE*92413T
SEWER CONNECTION 1 $85.00 PROCESSING FEE
Total Permit Fee:
$15.00
$100.00
**FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO
COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL
INSPECTION FEES APPLY AFTER 30 MINUTES.
**INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY
BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE
ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
**SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE
AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
**THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.
BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO
OWNERS OF UNDERGROUND FACILITIES.
**CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE
REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES,
INCLUDING THOSE RELATED TO TRENCH SAFETY.
Payment Summary
Total Fees AmountPaid AmountOwint? Tran Date Receipt # Payment Amt
$100.00 $100.00 $0.00 7/16/2009 2910 $100.00
Notes / Conditions of Approval
FELTS FIELD AIRPORT OVERLAY ZONE
FIRE DISTRICT #1 - PLAN REVIEW FEE IS REQUIRED FOR ALL SITE PLAN REVIEWS CONDUCTED BY FD #1
CITY OF SPOKANE VALLEY
Processed By: DOMPIER, DAWN PERMIT
Printed By: Lemley, Linda Page I of 1
NOTICE
It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and
requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's
or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - all structures, including manufactured homes when forms and reinforcement are in place and prior to placement of concrete.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Front, flanking, side and rear yard setbacks are measured from property lines. Curb lines and fence lines are not necessarily indicative of
property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/
curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized
representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your
structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is in place, plumbing, mechanical rough -in inspections have been approved, and prior to
concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - all permits - when complete when complete and prior to occupancy and/or use. Please provide 24 hours notice.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which
must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - foundation inspections prior to pouring pads, inspection of Blocking/Tie-downs, when completed per manufacturers
installation instructions. Final Inspection approval prior to occupancy: stairs, handrails, skirting, etc., installations completed WAINSTag(s) must be
affixed to the home, completed inspection record card and manufacturer's installation instructions must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Department • Road cuts for utilities or driveways, Division of Engineering &
of Building & Planning 477-3675 Roads - 48-HOUR NOTICE REQUIRED 477-3600 or
• Construction in a flood plain, Division of Engineering & Roads 477-3600 State Department of Transportation 456-3000
• Electrical wiring, State Department of Labor and Industries 324-2640 Sewer connection, Division of Utilities 477-3604 or City Public
• On-site waste disposal system, Spokane Regional Health District Works Department 625-6300
324-1560
PERMIT EXPIRATION
Unless otherwise noted, building, plumbing, fire and mechanical permits will be considered null and void by limitation if the work authorized by
the permit is not commenced within 180 days or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and
approved by the Building Department prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the
validity of the permit. Please call if you have any questions.
REFUNDS
All requests for building permit refunds must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the
date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No
refunds may be authorized more than 180 days after fee payment. Please contact the other agencies with respect to their refund policy on all other permit
types.
MISTAKE?
If you think we've made an error in processing this permit or find erroneous information on the permit, please bring it to our attention immediately by filing
a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Building and Planning at:
Spokane County Department of Building & Planning
1026 West Broadway Avenue Spokane, WA 99260
Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133
REVISED 11/08 131,136 PERMIT
Permit Center
Mj of 11703 E Sprague Ave, Suite B-3
re SpokanSpokane Valley, WA 99206
www.
�OValley® 88-0036 FAX: (509)688-0037
www spokanevalley.orQ
Community Development
Approach Permit Application
PERMIT NUMBER:
PERMIT FEE:
PROJECT ADDRESS // 7Z -r3 t
START DATE '711-110 f ANTICIPATED COMPLETION DATE
Building Owner:
Contractor:
Name: ,,, „iS
Name: if 11do.4
e -e te
Address: 4W .51e- e0'
Address:
City: State: GK-
Zip: t 77SV
City:
State: Zip:
Phone: J.7 -`ie f Fax:
Phone: /
Fax:
Contact Person I
Contractor Lic No:
Exp Date:
Name: eo R
City Business Lic. No:
Phone:
PROJECT DESCRIPTION (Provide site sketch)
Residential Driveway ❑ Commercial/Industrial Driveway
"' ttt❑---"' Existing Curb & Gutter 1-1 Rural Road Section
Culvert Installation F1 Sidewalk Repair/Construction
FI Other Conditions
Bond/Insurance certification must be on file with the city
DISCLAIMER
The permittee verifies, acknowledges and agrees by their signatures that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in
full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane
Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws,
codes or ordinances. 6) Plans orad tional information may be required to be submitted, and subsequently approved before this
application can be processed.
Signature Date 7 d y
Method of Payment:
❑ Cash ❑
Bankcard #:
Authorized Signature
REVISED 39/00
Check
❑ Mastercard
SA
Expires: VIN#:
S lcli'll OF,
Talk
P, Mane
OOValley
Urban Driveway Approach
Requirements
► Minimum of 7.5' from property line
► Minimum of 5' from crosswalks or intersection curb arc
► Minimum of 16' wide flat portion of approach
► Maximum of 30' wide flat portion of approach
► Combined approach width not to exceed 50% of total frontage
► Minimum of 15' of separation between any two approaches
** All driveway approaches to be constructed per the
Spokane County Standards as adopted by the City of Spokane
Valley
PLANNING DEPT. APPROVED
BY,Lai L. L
s.
DATE: �
OT Q
71,588 S.F.±
c
\ �
CGS
v
C,
U"O
F
BUILDING SETBACKS
FRONT (GARAGE) 20' (FROM PL)
FRONT (HOUSE) 15' (FROM PL)
CORNER 20' (FROM PL)
SIDE 5' (FROM PL)
REAR 10' (FROM PL)
SCALE: 1" = 20'
HAYDEN HOMES
LOT 3 Block 2
2464 SW GLACIER PLACE, SUITE 110
REDMOND, OR 97756
ADDRESS: 11723 E Marrietta
(541) 923-6607
VIEW RANCH ESTATE
CITY OF SPOKANE VALLEY, WASHINGTON
Spokan��Valley49;000
For City Use -Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Proiect Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us ifyou haven't heardfrom us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
A
SCITYOr 00^*4�
p6l[ane
_:wwoOVallev
Development Engineering
11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206
509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhaLL@spokanevalley.org
Approach Permit Application Review
TO: Building Department
Site Address: 11723 E. Marietta
Project No: 9-2154
`z
Reviewed By:A��Affll %`� Date: ��
Accepted
Not Accepted
Approach
X
Building Location
Paved Access
Notes: Saw cutting of existing curb is not allowed within the City's
jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior
to concrete placement.
`z
Reviewed By:A��Affll %`� Date: ��
Sp�ikane
,,;oOValley
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.Mok evalley.org
Community Development
Approach Permit Application
PERMIT NUMBER:
PERMIT FEE:
PROJECT ADDRESS // 7Z 3 cber'l-
START DATE -7 //G/ f ANTICIPATED COMPLETION DATE
Buildtng .Owner ., . {
,�- - .
:,. -
Name: Awes
Name: (We
Akw cwt
Address: Ly! • w ` e, - a�
Address:
City: ,,t/ State: 6P K- Zip: g 77.E
City:
State: Zip:
Phone: j) -ax7 Fax:
Phone:
Fax:
Contact Person �-
_ s
Contractor Lic No:
Exp Date:
Name: e^R �
City Business Uc. No:
Phone: �� c
PROJECT DESCRIPTION (Provide site sketch)
1�9
Residential Driveway Cornmercial/Industrial Driveway
❑] Existing Curb & Gutter F-1 Rural Road Section
Culvert Installation F-1 Sidewalk Repair/Construction
Other Conditions
Bond/Insurance certification must be on file with the city.
DISCLAIMER
The permittee verifies, acknowledges and agrees by their signatures that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in
full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane
Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws,
codes or ordinances. G) Plansorad tional information may be required to be submitted, and subsequently approved before this
application can be processed.
Signature Date 7 d y
Method of Payment,
❑ Cash ❑ Check ❑ Mastercard VISA
Bankcard #: Expires:
Authorized Signature: r
REVISED &WOO
7
VIN#:
SCALE: 1" = 20'
HAYDEN HOMES
2464 SW GLACIER PLACE, SUITE 110
REDMOND, OR 97756
(541) 923-6607
vs
BUILDING SETBACKS
FRONT (GARAGE)
20'
(FROM PL)
FRONT (HOUSE)
15'
(FROM PL)
CORNER
20'
(FROM PL)
SIDE
5'
(FROM PL)
REAR
10'
(FROM PL)
LOT 3 Block 2
ADDRESS: 11723 E Marrietta
VIEW RANCH ESTATE
CITY OF SPOKANE VALLEY, WASHINGTON