Loading...
2008, 06-26 Permit App: 08002342 ResidenceProject Number: 08002342 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/26/2008 Page 1 of 2 Project Information: Permit Use: SFR W/ATT GAR Setbacks: Front 25 Left: 5 Right: 5 Rear: 35 Site Information: Plat Key: Contact: HAYDEN HOMES Address: 2464 SW GLACIER PLC C - S - Z: REDMOND, OR 97756 Phone: (541) 923-6607 Group Name: Project Name: VIEW RANCH ESTATES LOT 11 BLK 3 Name: View Ranch Estates (PE -1760A-94) District: Nort Parcel Number: 45091.3011 Block: SiteAddress: 11806 E MARIETTA AVE Location:: CSV Zoning: MF -2 MF HDR District Water District: 026 IRVIN Area: 4,850 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Lot: Owner: Name: SVG VIEW RANCH, LLC Address: 2910 E 13TH AVE SPOKANE, WA 99202 - Hold: I' Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: 6/25/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Sewer Review Permits: Originally Released: 6/26/2008 By: tschmidt Released By: Operator: JD Printed By: jmm Print Date: 6/26/2008 Project Number: 08002342 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/26/2008 Contractor: HAYDEN ENTERPRISES INC Address: 17626 E 2ND GREENACRES WA 99016 Building Characteristics Building Height 25 Description 1&2 FAMILY BASEMENT F BASEMENT U COV DECK GARAGE Building Permit Page 2 of 2 Firm: HAYDEN ENTERPRISES INC Phone: (509) 994-4691 Grp Type Notes R-3 VB R-3 VB R-3 VB R-3 VB U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Notes: Payment Summary: Permit Type Building Permit This Application: Total Project: Sq Ft Valuation Sq Ft Valuation 1,409 $133,840.91 1,409 $133,840.91 80 $1,600.00 80 $1,600.00 849 $12,735.00 849 $12,735.00 67 $1,005.00 67 $1,005.00 480 $9,120.00 480 $9,120.00 Totals: 2,885 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT $158,300.91 2,885 $158,300.91 Permit Total Fees: Fee Amount Invoice Amount $1,858.31 $1,858.31 Fee Amount $1,324.15 $4.50 $529.66 $1,858.31 Amount Paid $0.00 Amount Owing $1,858.31 $1,858.31 $1,858.31 $0.00 $1,858.31 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 6/26/2008 Spokane 1.Valley® Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER: 23--\-2.„, \-2.„, PERMIT FEE: New Construction Addition/Remodel Other: Accessory Bldg Deck SITE ADDRESS: _1906 J t wt AV ; r '* s 14-0 ,r ASSESSORS PARCEL NO: LEGAL DESCRIPTION: ?1 # 013 Building Owner: Name: 1.4 i_\,,,,,;,..1 t -;d-j vv,t= `_) a� Address: t,1 q( 6.'L.' & 1 *-1Z-_ C t f 11 City:` -.2. State,(_ Zip:`T77 Phone: s y 1 - 9,2 3 ` ("..e, 7 Fax: Contact Person Name. —77 1 Lt at + r r Phone: `/ - Z 7 Describe the scope of work in detail: Contractor DIMENSIONS: ? (�, K' # OF STORIES: t Name: --Vv') C.....- t�Address: 2ND FLOOR Sn G: Address: IMPS VIOUS SURFACE AREA: ci City: State: Zip: Phone: Fax: Contractor Lic No: Exp Date: HEAT SOURCE: r - 1 L: C > A City Business Lic. No: Cost of Project: $ cs� Proposed Use: F -c> **************The following MUST be complete: (write N/A if not applicable)********************* HEIGHT TO PEAK• �' !�_5 DIMENSIONS: ? (�, K' # OF STORIES: t TOTAL AA E SPAC 4' a/' MAIN FLOOR TO SQ. FTG: C'. 2ND FLOOR Sn G: UNFIN BASEMENT SQ. FTG: i �. ,, ' IMPS VIOUS SURFACE AREA: ci FINISHED BASEMENT SQ. FTG: GARAGE SQ. DEC O TIO SQ. FT 30% SLOPES Olsi P : e . . TY: # OF BEDROOMS: '� CONSTRUCTIQ TYPE: i`e/zf— HEAT SOURCE: r - 1 L: C > A EWE: OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved befo this application can be processed. SIGNA Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: DATE:67_72.____2(77,-- El , 7 zc ❑ VISA VIN#: 'JUN -24-2008 10:56 From: 7349525 To:15094725849 ayc e n Homes: Lot 11 View Ra 11806 Variettc f -an Ave 0 cD N u) cNi .00 w 5.00' Wat r 0 50.00' 4)850 S.F.+ -states -•••••• 0 EPHRA TA 5,00 1489 SQ FT .....0011111•••••••••••••••mgooara*. 1,4 GNI 5.00' Sewer Driveway Utility Easement Utilities 20.57' .00' Marietta Ave 0 —1 Border Easement LETTER OF CONSENT This letter is to confirm that owner, SVG View Ranch LLC., of View Ranch Estates, PE -1760A- 94, subdivision has agreed to allow the buyer, Hayden Homes LLC. to acquire building permits and construction homes on lots that are under contract and not currently owned by the buyer. The lots presently under contract include: Block 2. Lots 1. 3, 5. 6. 7. 17: Block 3, Lots 8. 9, 10, 11, 12, 13, 14 STATE of County ) ss This instrument was acknowledged before me this 1244 >, day of as Tom►"Cv , /o F 4.-04 94 , 2008, by of W m Y'(‘199Q,CraM CANA D% Spokane jUalleyT For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant 's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 SPOKE Couj SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 11806 E MARIETTA AVE Parcel Number: 45091.3011 Subdivision: RANGE Block: Lot: (f! Zoning: Owner: SVG VIEW RANCH, LLC Address: 2910 E 13TH AVE SPOKANE, WA 99202 - Building Inspector: Water Dist: IRVIN Project Number: 08003616 Inv: 1 Issue Date: 7/2/2008 Permit Use: SEWER CONNECTION - Applicant: DEAN'S EXCAVATION PO BOX 698 DAVENPORT, WA 99122 Phone: (509) 721-1020 Contact: DEAN'S EXCAVATION PO BOX 698 DAVENPORT, WA 99122 Phone: (509) 721-1020 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: Permits Sewer Connection Permit Contractor: DEAN'S EXCAVATING License #: DEANSE*924BT SEWER CONNECTION 1 $85.00 PROCESSING FEE 1 $15.00 Total Permit Fee: $100.00 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. THE INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Payment Summary Total Fees AmountPaid AmountOwing $100.00 $100.00 $0.00 Tran Date Receipt # Payment Amt 7/2/2008 3102 $100.00 Processed By: DOMPIER, DAWN Printed By: HINTZ, FAITH Page 1 of 1 PERMIT Room 45 � FASCIA A5: 5IDftl s 45 OPTIONAL BELLY BAI BALU5TRA[ DECK 45, TRIM A5 Sf ;eICXHT-�LEY�4T14N _ SCALE i/4' . I' -O' 24 X 36 5HEET)0 2' E' 10' SGALE: i/5' i'•©' (it X 17 SHEEi7 AS SPEC'G AS SF'EC'D 45 SPEC'[) 6r—rl ( =6= YIVI I ( VIN SCALE: 114' . 1'-O' 24 X 36 SHEET)O 2' 4' E' IO' 5 --ALE: I/✓r' . t' -O' (11 X, 11 5HEET) — 2464 SW GLACIER PL aEo�o.O s77ss PHONE 541-523-6607 FAX 541 -SQ -0761 REVS5 CUFSFW AS OF 020307 sic ZONE: WA -C ELEVATION SEE CS EA7- 0 1 f 4� i REVS5 CUFSFW AS OF 020307 sic ZONE: WA -C ELEVATION SEE CS EA7- 0 ROO= AS FA --CIA AS SIDINJ AS OFTIONA 5ELLY ESAND TRIM AS OFEN 5ALLU6TRADE AS WINDOW 5WUTTER a � UJCOD STEP5rNTRY FLANT 5WELF DETAIL SEE DETAIL 2/D2 FRONT ELEVATION 5CALEc 114' . I' -C' 24 X 36 5WEET)C 2' 4' 8' IC' SCALE: i/£' . I' -C' (II X 11 5NEET) REAR ELEV4TI0N SCALE::14' = i' -C" 24 X 36 5WEET)C 2' S' IC' SCALE I?, i' -C' (II Y, it SWEET) 45 5F'EC'D 45 5FEC'D JINDCW AS SFEC'D TRADE 45 5PEC'D 45 5FEC'D SAND AS 5FEC'1, NOTE: �^PP�OYIMGTLY 1"] 50. FT OPTION„L M45ONRY 2454 SW GLACIER PL PEDMONO. Gfl 97755 PHONE 541-523-5607 FAX 541-548-0761 REVIStUNS CURRENT A5 OF 020807 SES zow-. WA -C ELEVATION SEE CS A6 -j 1 REVIStUNS CURRENT A5 OF 020807 SES zow-. WA -C ELEVATION SEE CS A6 -j V --T — 77' LL ILI II I °i I III I I I I I j a, til I I I I I i iL Bill XI " I L -- ----------------------------- LL — — — — -- — — --- I — — --- — — — — -Trl --- -------------- ------------- N. m ci 00- c to k __9 LI Al --ll ------------------ 3-c8r option SEE SHEET 01 6112 i4.8 WD. BM. F-FROVED TF;ZUE ------ ------------------ C-R TYPIyp ----------------------- CLIPPED GABLE END TFZJ56 I. i_ \� -1 I I i I I �1 I i ` . , ' �^. five �itS�-._,-..�y,..._.i-•••��5��ti.�l>��::. _.-f5`. `�� CL GIRDERTRU55 4x5 WV� PIM. 4x8 WD. 5M, 4.8 UID. 5M. 4x5 UID. B.M. / 2-'QUIFRE5 HOI DOUN CAPABLE— Of: UPLIFT OR e2) R-il-5 L ---------- J R 0 or= r- R A m I N rl- 5CALE: :1-4: (24 Y. 3e �,qEET) 0 2' 11 a, 10, 5CAL- =: /a (11 Y, 11 5H -=ET) ROOF FRAMING NOTES AMEN- - W1714TS) 1. 7RUSS MANUFACTURER TO VERIF`�* ALL DJMEN%CWS FFrAl F:)UNDATION PLAN AND FLOOR PLANS PFrC. TC"Fq--- MANUFACTURE OF Frl:)F TRUSSES 27RUSS MANUFACTLIf-EP. TO VER10Y FURNACE LCCATIDN t DESIGN TRISSES TO SUPPORT SYSTEM WHEN INSTALLED IN ATM AREA (nm-_io 4) 3 CONSTRUCT A KZ E; FT X 13 FT FURNACE PLATFORM IAW DETAIL FOUNDON SHEET D WHEN PLATFORM IS NOT DESIGNED IN THE TRUSS SYSTEM. 4 BOTTOM CORD OF TRUSS TIB BE DESIGNED FOR 20 LS LIVE LOAD WEN CAPABLE OF STORING A 24 INCH WOE ' 42 INCH TALL num IRC. TABLE 11301.5) S. ALL ROOF TRUSSES TO BE ENGINEERED BY A TRUSS MANUFACTURER PROVIDED TO BUILDING OFFIOCIAL & APPROVED PRIOR TO INSTALLATION (P.50ZIIA & R80210.11 6. ALL TRUSS PfrCHS TO BE AS SPECD ON THE ROOF & ELEVATION SHEETS (A 6112 ROOF PITCH WMTERIOR VAULTS TO BE 3/12 PITCH 6 A 5112 ROOF PITCH W/INTERIOR VAULTS TO BE 25/12 PTCH-1 7. ALL TRUSS HARDWARE TO BE APPROVED BY TRUSS MANUFACTURER & DESIGNED TO RESIST WIND UPLIFT PRESSURES BASED ON LOCAL WIND LOAD & ROOF WIDTH- TABLE MOZII) S. ROOF SHEATHING TO BE 7/15' OSB WITRUSSES SPACED LIP TO 24 INCH (TABLE R5032I.1 In 9. ASPHALT SHINGLES SHALL BE INSTALLED AS SPECD BY MANUFACTURE WITH NOT' THAN 4 FASTENERS PER STRIP SHINGLE IN AREAS WHERE WINDS EXCEED W mph SPECIAL FASTENING METHODS ARE REOURED P905261 10 FIRE BLOCKING SHAH BE PROVIDED TO CUT OFF ALL CONCEALED DRAFT OPENINGS (BOTH VERT & HORZI BETWEEN STORES AND THE ROOF RWZS) 11. DOOR AND WINDOW HEADERS TO BE AS NOTED. LOAD-BEARNG HEADERS ARE NOT REOUIRED IN 14T OR EXT. NCN-BEARNQa WALLS IR602.7.21 IZ BLOCK TO FOUNDATION BENEATH ALL COLUMNS BEAMS GFIDERS 13 ROOF VENT CAPS TO BE LOCATED AT REAR ROOF SLOPES WHERE ]POSSIBLE PROVIDE I SO Fr ATTIC VENTILATION PER 300 SO FT ATTIC- SPACE WITH SD-sm OF VENTS AT LEAST 3 FT ABOVE THE EAVES, OTHERWISE I SO, FT. TO 150 SO. FT OF THE AREA. MN2I 14. PROVIDE M I INCH SPACE BETWEEN INSULATON AND ROOF SI-EATI-IING WHERE EAVE VENTS ARE INSTALLED. rMS.31 15. ATTIC ACCESS SHALL NOT BE LESS THAN =932* ROUGH OPENING WITH WOJIUM OF 30 INCHS UNOBSTRUCTED HEADROOM ABOVE ACCESS OPENN3 FM71) 16. NSU -ATE LAW A. STATE OF OREGION, IAW OYISC ENERGY PATH I. (TABLE NtIO41I)LIJ & (31 B. STATE OF WASHINGTON IAW WASHINGTON STATE ENERGY CODE NOTE, MINIMUM OF 10 SQ. FT. OF ROOF VENTILATION FOR WOUSE A 2 60 FT. ROOF vENTILATION OVER 3 -CAR GA.R4G=— ISYMBOLS LEGEND L,— Z7 Z,3 2.6 FRAME WALL Wi STUD5 E 2x4 FRAME WALL UP STUDS =—:I INT=ERIOR 5EARNIC- WALL INDICATION. 0 5OLC BLOCK INDICATION AFFROvED JOJBTrlR,155 HANGER Pt aV 2464 SIN GLACIER PL REDMOND, OR 97756 IM40W 541-923-6607 FAX 541-545-07611 REVISIONS CURRIBI14'r AS OF 020W7 SE&OC ZONE: WA -C ROOF FRAMING PLAN SEE CS A5