Loading...
HomeMy WebLinkAbout2007, 12-05 Permit App: 07004553 Pole BldgProject Number: 07004553 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/5/2007 Page 1 of 2 Project Information: Permit Use: 30 X 30 POLE BLDG Contact: SPOKANE STRUCTURES Address: 510 N MULLAN ST C - S - Z: SPOKANE, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 927-0655 Group Name: Site Information: Project Name: Plat Key: Name: Range District: Nort Parcel Number: 45161.0152 Block: Lot: SiteAddress: 11814 E MAXWELL AVE Location:: CSV Owner: Name: PEASLEE, JOSEPH B & SHERRY Address: 11814 E MAXWELL AVE SPOKANE VALLEY, WA 99206 Zoning: UR -3.5 Urban Residential 3.5 Water District: 011 MODERN Hold: ❑ Area: 32,277 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Depth: 0 Right Of Way (ft): 0 Review Information: Review Building Plan Review Released By:- - Septic Sys Review Originally Released: 11/15/2007 By: tmelbourn Released By: - Originally Released: 12/4/2007 By: LHALSEY Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 11/21/2007 By: cjjanssen Operator: JD Printed By: jmm Print Date: 12/5/2007 Project Number: 07004553 Inv: 1 Application Date: 12/5/2007 • THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Page 2 of 2 Contractor: SPOKANE STRUCTURES INC Firm: SPOKANE STRUCTURES INC Address: 510 N MULLAN RD Phone: (509) 927-0655 SPOKANE, WA 99206 Building Characteristics Building Height 15 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation So Ft Valuation POLE BDLG U-1 VB 900 $17,100.00. 900 $17,100.00 Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCSURCHARGE Totals: 900 $17,100.00 900 $17,100.00 Units Unit Desc Fee Amount 1 SELECT $293.25 1 SELECT $73:31 1 SELECT $4.50 Permit Total Fees: $371.06 Notes: Payment Summary: Permit Type Fee Amount invoice Amount Amount Paid Amount Owing Building Permit $371.06 $371.06 $0.00 $371.06 $371.06 $371.06 $0.00 $371.06 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of' any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 12/5/2007 Permit Center SSTD' 11703 E Sprague Ave, Suite B-3 pokane? Spokane Valley, WA 99206 �Ualley• (509)688-0036 FAX (509)688-0037 J www.spokaneval1ey.org Community Development Residential Construction \/.I New Construction Permit Application n Addition/Remodel n Other: PERMIT NUMBER: t --\-S\ S, PERMIT FEE: ❑ Accessory Bldg ❑ Deck SITE ADDRESS: 110/ Li fr. MA-utd& 2L/ Spat p 114LLy • ©I S2 LEGAL DESCRIPTION: ASSESSORS PARCEL NO: "I J 14 Building Owner: Contractor: 9 Name: Jo 5cPt4- "pL'143 LEE Address:/ ti E. M/4v&sae Name:SPoeinvi- &tocrLe s, a roc Address: Sio �• no1..F4N City: *4u/6 t/, / _ , State:4,4_ Ztpwa. Phone:509 qQ?� Fax: Contact Person ' Name:MA-P_K Pi./ de/ace( Phone: sof 927-a Cr / f9' - oi0.t; Describe the scope of work in detail: City uQ State: �A Zip:2106 Phone- 50Q...9.17.1 -6/0 0Q 9 .7—O6SS— Fax:Sa9-9d7-vo6L Contractor Lic Np Ppot-in r /2 0Exp6 Date: / /r /c' City Business Lic. No: Cost of Project: $ /,Z. o61 Vo sT FtA-Calc '&0( l -1D ,rle•-. Proposed Use: StEoP **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: /3' DIMENSIONS: 30 13oX0 # OF STORIES: J TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2NU FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: . IMPERVIOUS SURFACE AREA: -1 t FINISHED BASEMENT SQ. FTG: 1RAGE SQ. FTG: OV-. DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER O(SEPTI9 The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed SIGNATURE: Method of Payment: D Cash Bankcard #: Authorized Signature: REVISED 2/15/07 0 Check DATE: / / `/ C1 -e' / RECEIVED BY CITY OF SPOKANE VALLEY 0 Mastercard 0 VISA Expires: VIN#: NOV 14 2007 PERc CENTER BY: Spokane Valley® 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • cityhall@spokanevalley.org r. Residential Plan Submittal.Minimums ❑ Completed Building & Mechanical applidation with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. Two sets of plans including Site Plan, elevations, floorplans,-foundatiori• plans " With details, roof plan; framing plans & details. • • . , • ❑ T Show the height of any proposed buildings or accessory structures. • . 0 Floor plan•for each floor: Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. • '• .• - ❑ All braced wall panel types: show locations and details of installation, including . engineered design. • O Egress windows: Provide at least one window or exterior door approved for. • Emergency escape or rescue from a basement and in every room for sleeping. ❑ Smoke detector locations ❑ 22" X 30" attic access location ❑ 18" X 24" crawl space access: ❑ One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details ❑ Furnace and hot water heater location. ❑ All header locations: type, size, and connections O Foundation plan O Insulation information Spoka e Dalley° For City Use Only PLUS Project Number t% �S Project Address fl /y pX(4)011 11703 E Sprague Ave Suite 13-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is 1 I The TARGET DATE is the date we estimate your project application will have had its initial technical review. Itis not the date for approval or permit issuance. Tips for a Smoother Project Application Review i Submit complete; accurate plans and documents. Extra time mor be required. for re -submittals as project application reviewers -work on multiple applications and it nun' be several clays before they can look at your new or revised information. i Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the Citv can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. Call staff regarding the status ot-your project only after the target date shown at the top of the page Although you should be contacted on or by the target date. pleaseJeel free to contact urs if you haven't heard from us by your target date. Staff mall contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more e peditously. Steps in the Permit Process I. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional infi-rmation as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to stake sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application lir permit pick-up. Information regarding fees and pre -construction meetings of -required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK- BUILDING FILE REV 9/07 mA-,w•• I/ PLANNING DEPT. PPROVED DATE) <1Doi hoc t 1 6xisr 06— w1/4)5')\^ pJ -C J I®9' • 5/ oto Jo -e 1 th5� 18 r 5 was iwdi LI 1 R f i -, p, RECEIVED BY CITY OF SPOKANE KV 1 4 2007 PEJ NIT CEN"i cR BY: ��\� Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project Previous pre -app meeting El Plan revisions 0 Transmittal Date: Wednesday, November 14, 2007 Site Address: 11814 E MAXWELL AVE Parcel Number: 45161.0152 Zoning: UR -3.5 Fire District: FD 01 Water District: MODERN Project Number: 07004553 Applicant: e-mail: Contact: e-mail: Contractor: SPOKANE STRUCTURES 510 N MULLAN ST SPOKANE, WA 99206 (509) 927-0655 SPOKANE STRUCTURES 510 N MULLAN ST SPOKANE, WA 99206 (509) 927-0655 SPOKANE STRUCTURES INC 510 N MULLAN RD SPOKANE, WA 99206 (509) 927-0655 Owner: PEASLEE, JOSEPH B & SHERRY L 11814 E MAXWELL AVE SPOKANE VALLEY, WA 99206 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: E C E II V E I11f�1L1S to 2001; MOLDD Project Description: 30 X 30 POLE BLDG Please send all plan review and project comments via e-mail to the highlighted individuals. Building tr Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION SITE PLAN PLANS Please send all plan review and project comments via e-mail to the highlighted individuals.