Loading...
2009, 09-29 Permit App: 09002978 Pole BldgProject Number: 09002978 Inv: I Application Date: 9/29/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 20 X 30 POLE BLDG Contact: BING HALVERSON CONSTRUCTION Address: 33997 TEEL HILL RD N C - S - Z: DAVENPORT WA 99122 Setbacks: Front Left: Right: Rear: Phone: (509) 725-0420 Group Name: Site Information: Project Name] Plat Key: 005480 Name: SP -0901-93 District: Nort Parcel Number: 45161.0247 Block: Lot: SiteAddress: 12007 E MAXWELL AVE Location:: CSV Zoning: GO Garden Office Water District: 011 MODERN Owner: Name: ADAMS LIVING TRUST, ROBERT Address: 12007 E MAXWELL AVE SPOKANE VALLEY, WA 99206-250 Hold: ❑ Area: .55 Acres Width: 130 Depth: 153 Right Of Way (ft): 50 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Originally Released: 9/17/2009 By: tmclbourn Landuse/Zoning/HE Conditions Released By: 9/23/09 contacted applicant; waiting on site plan revisions; Historical documentation in BP file indicates structure built in the 1940's; Structure is non -conforming and allowed to rebuild per SVMC 19.20.060C.5. Originally Released: 9/28/2009 By: lbarlow Permits: Operator: JD Printed By: jmm Print Date: 9/29/2009 Project Number: 09002978 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/29/2009 Contractor: BING HALVERSON Address: 33997 TEEL HILL RD N DAVENPORT WA 99122 Description Grp Type POLE BDLG U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Notes: Notes Building Permit Totals: Units 1 Page 2 of 2 Firm: BIND HALVERSON CONSTRUCTI Phone: (509) 725-0420 This Application: Total Project: Sq Ft Valuation Sq Ft Valuation 660 $12,540.00 660 $12,540.00 660 512,540.00 660 $12,540.00 Unit Desc SELECT SELECT SELECT Permit Total Fees: Fee Amount $223.25 $55.81 $4.50 $283.56 Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing 5283.56 5283.56 $55.81 $227.75 $283.56 $283.56 $55.81 $227.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 9/29/2009 Spokane Valley® For City Use Only PLUS ProjectNumber Clctl17 Cil% Project Address - ZC)01 IV 11703 E Sprague Ave Suite B-3 ' ,Spokane Valley WA 99206 509:688.0036 1 Fax: 509.688.0037.* permitcenter@spokanevalley.org As part of our on-going commitment' to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial. technical application review. if for any reason we cannot meet this date, we will contact you with a revised target date: ; - •I Your application review TARGET DATE, is The TARGET DATE is the date, we estimate your project application will have had'its°initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review i Submit complete; accurate plans and documents. Extra time may he required for 1i -submittals as project application' reviewers work:on multiple applications and it may be .several days before they can look at your new or revised information., • r - Designate a specific contact person to communicate with the City. • . While the person designated as the applicant's contact person with the City cafi be -change cl, one' individual with the expertise for dealing with reviewer comments would be the best choice for the, entire review process. -. > Call staff regarding the status of your project only after the target date shownat the top of the page.: , Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you. before the target date if the initial review'is complete. By following this, procedure, you will save time and.allow the reviewers to complete.the work more expeditiously: Steps in the Permit Process' 1. Counter Complete. Your application has been accepted as counter complete. -This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or, have, been' approved for deferred submittal. This does not prevent technical staff from requesting, additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check t� make sure that the application is -reviewable and free from substantive flaws that would prevent technical staff from, completing the technical review once it is started: When this step is complete, your application will be routed to the appropriate staff and remain, in their review queue until it conies up for review. • • 3. Technical Compliance. Once an application.is administratively complete, itis routed to technical staff for compliance review. Depending on the.type of project, technical staff may include multiple reviewers: You should be contacted by phone, fax,'email, or mail by your TARGET DATE once the initial technical compliance review.is complete.. • 4. Permit -Issuance. When the technical compliance review of the application is complete, including ,any subsequent re- submittals, each reviewer will approve their section of the application and route it to,the Permit Center. Wheri all sections" of the application are received, a Permit Specialist will process the application and -contact the person,specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required). will be provided by the Permit Specialist at that time. - WHITE -APPLICANT PINK- BUILDING ALE REV 9/07 �arror e 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206' Permit Center 411110.1°* (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development Residential Construction Permit Application PERMIT NUMBER: 7 q i O PERMIT FEE: ri New Construction f l Addition/Remodel ❑ Other: Accessory Bldg Deck SITE ADDRESS: /2 DD % E 117.4 /(** ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: /7D a 414 N~ j DIMENSIONS:.# 9-0' X 33 Name: 4,16 peva ke s TOTAL HABITABLE SPACE: Address: / 2 C d 7L.— 1/4. Y» /. 2"" FLOOR SQ. FTG: mg--N4 City: ,1 /{4—,./ t/ Ali Stater Zip: Phone: Sb el .- 2 9 0 -- t(3 9 q Fax: GARAGE SQ. FTG: �� (0 6 D j -% Contact Person Name: j'rf �/aeetJe. Phone: j-05' - - .t / -/ / a` q Describe the scope of work in detail: Po )e Jla . Stf-o4417� fieLL (,iL R Contractor: M•c_l+,.„. ,././A. 4v,✓f a, w DIMENSIONS:.# 9-0' X 33 Name:/3,,i).• /,/� 4-„,4,,I,..1, ^1 L�t�je- TOTAL HABITABLE SPACE: Address:. j, 71 7 i.e., C l7% ll /ei ,,, 2"" FLOOR SQ. FTG: mg--N4 City: R4v J State: /2 Zip:," 2/22_, Phone Fax: S`o9-7,2�- !lSY GARAGE SQ. FTG: �� (0 6 D j -% Co tractor Lic No Exp Date:?....3d _ voi bo i `18'% 3�o i� ,20 /0 City Business Lic. No:ss_...)-3 7 5g-fny CONSTRUCTION TYPE: Po l.e rA.J. Cost of Project: $ Yv u o Proposed Use: S7.eay e **************The followin>? MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS:.# 9-0' X 33 OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG:wg 2"" FLOOR SQ. FTG: mg--N4 UNFIN BASEMENT SQ. FTG: /✓A IMPERVIOUS ,SURFACE AREA: �v^e`47e,e047c FINISHED BASEMENT SQ. FTG: Al /a GARAGE SQ. FTG: �� (0 6 D j -% DECK/COV. PATIO Q. FTG: N74 30% SLOPES ON PROPERTY: 1C/4t # OF BEDROOMS: N/a. CONSTRUCTION TYPE: Po l.e rA.J. HEAT SOURCE: y Hp SEWER OR SEPTIC? oNTe w The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: LI Cash Bankcard #: Authorized Signature: REVISED 2/15/07 0 Check ❑ Mastercard Expires: DATE: ❑ VISA VIN#: /6-aF CEIVED CSV PERMIT CENTER 0900 hSEP 1 64M Project # v9 00C L D Name e Submittal # f RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams ❑ Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing tJ X aB 2 033}± IQ FT 1 ^' '" 130.84' 60'-0' ‘ \S Lte — — cp 40'-0' 11-9' r i sV1w1 b----; DIx15 p u,I�'f I �, 9 r 1 COVERED PATIO 1 3E1^5 Q"i pv"�\-----j 1826 50 FT PROPOSED HOUSE EXISTING GARAGE 68'-0' I 1 2t LOT B I 3i n `Is 12007 E. MAXWELL SPOKANE VALLEY 30' SET BACK LINE 10' UTILITY EASEMENT °° DRIVEWAY 30-0' 1. I 589'50'57"W25'-0' - I PLANNING DEPT. APPROVED BY. L -k) I MAXWELL AVE. 6,54-4 G9 COalil8 251-0' • DATE: -pL2& 11 ear I i !'- O' , SITE PLAN ADAMS RES scale, HALVERSON CONST. DAVENPORT WA Dote= 03/16/09 Drawn By; 1 290 (�']y'�("1�'� E� L Revision Date