Loading...
2009, 02-25 Permit: 09000446 Demo Partial Residence• Spokane Valley BUILDING DIVISION 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Site Information Project Information Site Address: 12007 E MAXWELL AVE Parcel Number: 45161 0247 Subdivision: Block: Lot: Zoning: GO Garden Office Owner: ADAMS LIVING TRUST, ROBERT C & Address: 12007 E MAXWELL AVE SPOKANE VALLEY, WA 99206-2509 Building Inspector: NORTH Water Dist: MODERN Project Number: 09000446 Inv: 1 Issue Date: 02/25/2009 Permit Use: DEMO PARTIAL HOUSE Applicant: MOMIKE INC PO BOX 1782 SPOKANE, WA 99210 Phone: (509) 325-4291 Contact: MOMIKE INC PO BOX 1782 SPOKANE, WA 99210 Phone: (509) 325-4291 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: Permits Demolition Permit Contractor: MOMIKE COMPANY License #: MOMIKI IOJK DEMOLITION - RESIDENTIAL 1 $46.00 Total Permit Fee: $46.00 Payment Summary Total Fees AmountPaid AmountOwing $46.00 $46.00 $0.00 Tran Date Receipt N Payment Amt 02/25/2009 17348 $46.00 Processed By: DAVIS. JENNA Printed By: PATRICIA PRINCE Page 1 of 1 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, Including manufactured homes. NOTE. This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily Indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Vatley nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permlttee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this Inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants. fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or Issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for electncal wmng, State Department of Labor Permits and inspections for Sewer Connetlmn. Spokane County Utilities Denson And Industries 324.2640 477-3604 Permits and inspections for on-site septic systems, Spokane Regional Fre spnnkler and alarm systems and pnvale access road nspea ons, Spokane Valley Health Dtstnct 324.1560 Fire Department 092-4122 Stale law RCW 19 122 requires that pnor to any excavation the -CALL BEFORE YOU DIG' center must be notified. Call before you dig at least 2 working days in advance, 456-8000 PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work Is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made In writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date Feb. 18. 2009 8:07AM SPOKANE CLEAN AIR t40icc of Inion No. Spokane ZEl8'°N Wdl No. 8175 P. 1 WI labil3; oig('I.ISI-‘lil tl(u1J 1,-- Ili t1in 1rtc,,, inn, llemuliiiun and Asbestos Informalien Sheet as weft as Roution A. Project Type: I • 0 Asbestos Removal 5 0 Asbestos Removal & Demolition ' ei Demolition,No Asbestos Removal Does this project involve a fire -damaged structure?: t Yes 0 No (If yes, refer to Sections 9.03.11.3 and 9.08) Dons this project involvedemolition by firc training'!: 0 Yes ® No (Sec Sections 9.024t, 9.039.4 & 9.04.A.6.t) How many structures does Iters project invol1vo?: (If more Than 1 structurc, refer to Section 9.04.A3) . Property Owner: jti1�r .g) �t.nAS R 6 4 Phone: 0,,,ej0-1t qc)1 Fax; I Mailing Address: 17_001 fj^ajt 141 Clb:C (tics. I/G 1' Stat: IL'hIt _ I Zip: J C. Site Address. Llto 1 2. on 4(toc41 } CiH:5Oof(a... Vcc_i state W r - 1 zit e12t7V lob Site Phone: %3-i a 1 Canted Person: en, -,, 13,. d: ✓ D. 12 Asbestos Survey or 0 Material Presumed I Date survey performed: AHERA Bldg. Inspector Naomi .,t, k- (-4 ,1kutjf Was asbestos found? 0 Yes ® No Company- IC_ert. No.: Pct— O 2 4, .4 E. Asbestos Removal Start 'Information: Date: List Completion Dale: Abatement By (if known): List individual gist and guantily of materials to be 1 Total SquareFeet: Total Linear Fed: born the structure(s) by project completion? 0 Yes 0 No removed. If>1 snucmre. materials for each structure by address / location. ---• - Will all asbestos material beremoved .P. Demolition Stan, Demolition By Information: Date: 2-214 (ifknown): IV1nnAt.1L4- 11n0_ C. Asbestos Project and Demolttlon Notification Waiting Period and Non -Refundable Fee Categories il 1 ql I ( It•l'en 1 I mi. U Ity di 1 1) 1l t 1 4iu,;1r'3N „nI t y I.0 1. 0 All Demolition (all asbestos must be properly removed and disposed of prior to demolition) 3 Days . $30 L.. G • 1, 1 ♦ 1 ,Il. ultlrit t tl'. f la I 1 • )111111 _ f C. „ _ tt 1111 1'1'�1� 1 2. 0 10-259 in f and/or 46-159 sq f asbestos - 3 Days • - 5250 3. 0 260-999 In ft and/or 160-4,999 sq ft aebeetes 10 Days 3500 4.0 21,000 In ttand!or 25,000 sq ft asbestos lO Days 11.250 5. at All Demolition sIdI Halt 0 1 have completed and attached demolition with non&fable .er, 10 Days I2513. Intent (N01) far emergency, alternate asbestos project work practices, for hazardous conditions. dm Supplemental Notice of asbestos roofing, or exception a The $250 demolition fir is waived ifdemolltion is performed in conjunction ivi/A atbtssor pro/ed category 2, 3 or 4a6wa • Ti. Optional: List addition parties you would like copier caws NOl and/or related nertices sent to (Ilst nun e & fax number and/or mailing address): 1 1. I certify that the information contained In This notification and any supplemental information provided is, to the best of my knowledge, accurate and complete- �j business Name: 114Th M. b! 1 h Ci ZL1 fax; ?r? €'Phanc;'5 ' 11 ( O Mailing Addresss,2Z,le) h 11vsC,jLt:tr %O eLi.^f , Lo A" Signature: ,.,)\ 4t. uw CV.— ‘ Spokane Clean Atr, 1101 W. College. Suite 403; Spokane, WA 99201 / tvww,sookeneclennaicon, / Ph.: (509) 477-4727 Pax:: (509) 477.6821 Yoor advance notification period will begin when a.pmplaiod NOS, including required nonrefundable fees, is received by SRCAA.NOI 11/08 PrintName• �i'kv�. f'. ✓ Completeness Review re-NOI complete ❑NO1defr ient- SeceA.ttpp)ted a--1'1-09 -: RN T ann. tee cric :1 t)T Cr. OT 2'd 4802 969 609 ouI a>1iWoW 061:80 60 SZ Qad eld2131N30 lIk43d AS LE00BB9605 61:80 600L/SZ/Z0 03AI3038 RECEIVED 02/24/2009 15:59 5095880037 SV PERMIT CENTEPFR Feb 24 09 03:58p MoMike Inc 509 535 2084 p.3 12007 e maxwell spokane wa - Google Maps Go igle Address Maps Page 1 of 1 http://maps.google.com/maps?source=ig&h1=en&riz1 GI GGLQ_ENUS292&q=12007%2... 2/24/2009