2012, 08-30 Permit: SW-12002108 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002108
Permit Issued Date:
08/30/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: SUTTERS
Permit Type: SEWER
Primary Contact: LAUER EXCAVATION & CONST
Applicant: LAUER EXCAVATION & CONST
Address: PO BOX 11581
SPOKANE VALLEY, WA 99211
Phone: 509-981-7954
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
1109 S MARIGOLD CT
45234.5405
Subdivision: H.A.V. ADDITION
Assessor's Description: H.A.V. ADDITION LT 5 BLK 2
Inspection Area:
Owner:
Address:
Phone:
Email:
JARVIS, RICHARD T & JANICE L
1242 RANGE VIEW CIR
RAPID CITY, SD 57701
Water District: Vera Fire District: Spokane Valley Fire
Irrigation District #15
Zoning: Land Area: 11408 Square Feet
CONTRACTOR INFORMATION:
General Contractor
LAUEREC931DA
LAUER EXCAVATION & CONST
PO BOX 11581
SPOKANE VALLEY, WA 99211
509-981-7954
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 08/30/2012 11:31:25
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002108 08/30/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 08/30/2012 11:31:25
Printed by: IIS APPPOOL\ASP.NET v4.0