2008, 09-29 Permit App: 08003735 Remodel GarageProject Number: 08003735 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/29/2008 Page 1 of 2
Project Information:
Permit Use: REMODEL GARAGE INTO 2 BTH, 2 BDRM
Contact: RISON REMODELING
Address: 4509 E 56TH
C - S - Z: SPOKANE WA 99223
Setbacks: Front Left: Right: Rear: Phone: (509) 448-8830
Group Name:
Site Information: Project Name:
Plat Key: 001642 Name: MISSION PINES SUB District: Nort
Parcel Number: 45161.0141 Block:
SiteAddress: 12022 E MAXWELL AVE
Location:: CSV
Zoning: R-2
Water District:
Area: 14,715 Sq Ft
Nbr of Bldgs: 1
Review Information: z.
-
Lot:
Owner: Name: LOWELL, JAMES A
Address: 12022 E MAXWELL AVE
SPOKANE VALLEY, WA 99206
SF Res Suburban District
Hold: ❑
Width: 110 Depth: 138 Right Of Way (ft): 50
Nbr of Dwellings: 1
Review
Building Plan Review
Released By:
Originally Released: 9/29/2008 By: TMELBOU
Permits: ,
Building Permit
Contractor: RISON REMODELING Firm: RISON REMODELING
Address: 4509 E 56TH
SPOKANE WA 99223
Phone: (509) 448-8830
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB REMODEL 0 $37,000.00 0 $37,000.00
GARAGE
Item Description
RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $37,000.00 0 $37,000.00
Units Unit Desc
1 SELECT
1 SELECT
I SELECT
Operator: jmm Printed By: JD
Fee Amount
$512.45
$4.50
$204.98
Permit Total Fees: $721.93
Print Date: 9/29/2008
Project t'I'umber: 08003735 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/29/2008 Page 2 of 2
Notes:
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$721.93 $721.93 $0.00 $721.93
$721.93 $721.93
$0.00 $721.93
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD
Print Date: 9/29/2008
Sp®kan�
OVa11ey.
Community Development
Residential ConstructionSEP 2 2 2008 ❑ New Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688 -0036 -'FAX: (NV)
www.spokanevalley.org \IE b LLEY_}
0037
PERMIT NUMBER: c• :373L•
PERMIT FEE:
_ENTER j& Addition/Remodel
=Other:
SITE ADDRESS: Oa 27 E HIT a) el/
Accessory Bldg
n Deck
Spokq 1611t 4.9
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
,n�., .., - _F S�__d_�_, _ - .''b,yP'h.'�= i
`Builtlitig Owner $, , ' :' _ ,
•5'y° .. .. ,. �l'�P'?
-._. -..°. r:',¢=y- `r -q S': s'�-•E�'s' :c'`�'1?. i,t'�4a.fg, :' ,:j1 ':a-�;
;ConfractorT. ,, *., �. ,, �, . -
:1;.St :,. C/ -',iasnic £fin. fi'.�:. a-
/..
Name:
Name: 3'/a1 LGro e / I
Name: C/lri✓t /i?S Lam. /C /ieiti
Address: i ,a o a a'Z E "vete z /L
Address: it 5 o q E-# f tt
City:• ual`� State:toq Zip:
City: 5;4,44 He,. State:�el j7-2 3
Phon`T
5c�t-31/- 4�y3 7'�'f- .� r,fl
Phone P�
coq-8i�'/'3i10 ce//5n'?55'- 436
DECWC V PATIO SQ. FTG:
N. ft
Date: G _/ 3 _ O ei
Contractor Lic No:L G g y ery nxgll
1. .. ..::...e.' V
1ContaPersot - : Vi ,.-::
CON$TRUCTIt TYPE:
Stich-- .-�1 /woo
City Business Lic. No:
or,
'
tr �i0°Z'5'37—G3/
Name: Cjf1UCif'«SOS
Phone: SO 9 -gV i/ -3P/C)
Describe the scope of work in detail: Cot of Project:
m
rGo 8 44noto_ f9.p, 9,
a.¢ctliea0rooms /al. /Yiic-haAi re s T;a
too•�
4X,'sr-inq fled rs • ,
Proposed f'lse: 41re-a
incr7t«1
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
N,A-
DIMENSIONS:#
asX 07 #r
OF STORIES:
l
TOTAL HABITABLE SPACE:
d
MAINeLwOdRTO SQ. p it-
F`oOD•
21‘11j FLOOR SQ. FTG:
A'
UNFIN BASEMENT SQ. �FTG:IMPERVIOUS
A
SURFACE
AREA
FINISHED BAS ENT
SQ. FTG: 4.//V,
GARAGE SQ. FTG:
A.
DECWC V PATIO SQ. FTG:
N. ft
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
,V. ,4,
CON$TRUCTIt TYPE:
Stich-- .-�1 /woo
HEAT SOURCE:
6o, /er
SEWER OR SEPTIC?
SeC4.7e r
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash ❑ Check
Bankcard #:
Authorized Signature:
REVISED 2116/07
DATE: 'fb 2/6-3-
p Mastercard ❑ VISA
Expires: VIN#:
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
o Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
o Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
eFloor Plan of each level (finished or unfinished) with dimensions:
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
o Floor Joist direction, size and spacing
o Header, beam or concrete lintel sizes
o Brace wall panel locations
o Water heater and -furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
o Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
a Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
i t size and spacing
Wall/
Height/ top plate/ stud size and spacing/ sole plate
o -Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with Emil vapor barrier
Miscellaneous Construction Details
o Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
o Stairway tread rise & run and nosing
o Window and door location and sizes
o Window well locations if applicable
o Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board ,
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
o Handrail /Guard height & spacing
Spokane�
jUalley
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project El
Previous pre -app meeting 0
Plan recisions ❑
Transmittal Date:
Monday, September 22, 2008
Site Address: 12022 E MAXWELL AVE
Parcel Number: 45161.0141
Zoning: R-2
Fire District: FD 01
Water District:
Project Number: 08003735
Applicant:
e-mail:
Contact:
e-mail:
Contractor:
RISON REMODELING
4509 E 56TH
SPOKANE WA 99223
(509) 448-8830
RISON REMODELING
4509 E 56TH
SPOKANE WA 99223
(509) 448-8830
RISON REMODELING
4509 E 56TH
SPOKANE WA 99223
(509) 448-8830
Owner: LOWELL, JAMES A
12022 E MAXWELL AVE
SPOKANE VALLEY, WA 99206
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
Project REMODEL GARAGE INTO 2 BTH, 2 BDRM
Description:
IECiEfiWiED
SL.
t-rP MOOS
leo
LioDC
Dfl[�
Building
Landuse Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
n
CONSTRUCTION PLAN
c
TD
Please send all plan review and project comments via e-mail to the
highlighted individuals.
+,, -. r -"$•Ji :. �'.J�':\,�.• },;;., T F.!'�, .. .,i,.. -.l • .� J4.CS'•.{J..'-'.'.-Log
)}+,f •,r
Spokane
11#17alley®
• A • r .r. 1.4
For City. Use Only
PLUS Project Number'. '3 1 3S—
ProjectAddress./a0aa- 'r;/l9trap4
11703 E Sprague Ave Suite 8-3 • Spokane Valley )NA 99206 i ' ,
509.688.0036 • Fax: 509.688.00374 peirnitcenter'spokanevalley.org
As part of our on-going commitment to customer service during the review process of;your,project ,
application, we are providing you with a TARGET DATE for the initial technical:application review. If for
any reason we cannot meet this date, we will contact you with a'revised target date:
Your application review TARGET DATE is
The TARGET DATE is the date we, estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
i Submit complete, accurate plans and documents. ,
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several dans before they can look at your new or revised information. .
➢ Designate a specific contact person -to communicate with the City. •
[Dille the person designated as the applicant's contact person with the Cit' can be changed„one individual with the
expertise for dealing with reviewer connnenls would he the best choice for the entire review process. .
i
Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact ns (Lyon haven'1 heard from us
by your target date Staff may contact you before the target date if the initial review is'eamplete. By.following this_
procedure, you will save trine and allow the reviewers to comp/ete the work more expeditiously.
Steps in the Permit Process
I. Counter Complete. Your application has been accepted as counter complete. This .means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved ' for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality. Check. The next step in the process is a quality check to.make.sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is.started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it.
comes up for review. •
3. Technical Compliance. Once an application.is administratively complete; it is routed to technical staff for.compliance ,
review. Depending on the type of project, technical staff may jnclude multiple reviewers. -You should be contacted by,
phone, fax, email, or mail by your TARGET DATE once the initial _technical compliance review is complete.
t .
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to.the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE REV9/07