Loading...
2011, 11-08 Permit App: 11003532 Storage BldgProject Number: 11003532 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 11/8/2011 Page 1 of 2 Project Information: Permit Use: NEW 240 SQFT DETACHED RESIDENTIAL Contact: FRITZ, ARLENE K STORAGE BUILDING Address: 12911 E MAXWELL C - S - Z: SPOKANE VALLEY, WA 99216 Setbacks: Front Left: Right: Rear: Phone: (509) 924-6270 Group Name: Site Information: Project Name: Plat Key: 001880 Name: OWENS SUB District: Nort Parcel Number: 45152.0109 Block: SiteAddress: 12911 E MAXWELL AVE Location:: CSV Lot: Owner: Name: FRITZ, ARLENE K Address: 12911 E MAXWELL SPOKANE VALLEY, WA 99216 Zoning: R-3 SF Res District Water District: 011 MODERN Hold: ❑ Area: 12,040 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Originally Released: 11/8/2011 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Sewer Review Originally Released: 11/8/2011 By: mpalaniuk Released By: Permits: Operator: MT Printed By: JD Print Date: 11/8/2011 project Number: 11003532 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 11/8/2011 Page 2 of 2 Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 Building Characteristics Group: U-1 Type: VB Total Area 240 Stories 1 This Application: Total Project: Description Grp Type Notes So Ft Valuation So Ft Valuation GAR WOOD U-1 VB DET RES 240 $4,560.00 240 $4,560.00 STORAGE BLDG Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 240 $4,560.00 240 $4,560.00 Units Unit Desc Fee Amount 1 SELECT $111.25 1 SELECT $27.81 1 SELECT $4.50 Permit Total Fees: $143.56 Notes: Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $143.56 $143.56 $27.81 $115.75 $143.56 $143.56 $27.81 $115.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any, other state or local laws or ordinances. Signature: Operator: MT Printed By: JD Print Date: 11/8/2011 Spokane ems' _FValleyU Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenteresookaneva I ley.orq (Staff Use Onlly PERMIT NUMBER: 1 I _ V 2 PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION El NEW CONSTRUCTION DECK SITE ADDRESS: /2 if ADDITION/REMODEL 1] OTHER E , /Yl fir 14)6 IL ACCESSORY BUILDING RE 'E;VED BY CITY OF SPOKANE VALLEY ASSESSORS PARCEL NO.: sig / ca. a /Ca 47LEGAL DESCRIPTION: BUILDING OWNER NAME: t��-R7C�67.16 . ;Rit . /l NAME: A -IQ IE/Il6 R / ,CIS/[ y^ - NUV u ./ 2011 ADDRESS: /2Q // ,6*, Jy(A-+'l tiJC/L CITY: S vakCa-ltl g /JA-LLG v STATE: 4(J /¢-. ZIp: / q 2/6 r r PHONE:/'605) 9^.' zt-h 70 FAX: CELL: CONTACT NAME: 7}-/ /EA%G hR ITv PHONE:(e1 09) 924 - (p 2.1.0 FAX: CELL: CONTRACTOR NAME: /44 /64'C F/?l/ (se ir) Sea 17" /Comp (So ki) MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: 5 Eq o 5To A ' ict J e405 ` Sn14L..3 AZ."0ziar 5 44ArPAHE .. cA/F Tµ hi ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions: rNo. /2X20 of Stories: Total Habitable Space: ,(1/4 Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ FT: /1//i' Finished Basement SQ FT: N/09- 1, LTJ'• -Garage SQ FT: sff p Z1/0 0k- Deck/Covered Patio SQ FT: of Impervious Surface Area: c er 30" Slopes on Property: No. of Bedrooms: /./ /A Construction"Type: Heat Source: ,t/ /fi Sewer or Septic: /y J, TOTAL COST OF PROJECT: $tap 0 0.66 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. / Signature (? &_itL Date: /1 — O % - ePo // Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_ _Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ikSITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances /Setbacks to property lines distance between buildings o Right of way/easemerit location & sizes o Driveway approach size and location cer BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑, Footing sizes and locations ❑'.Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o E sneered truss direction and spacing after and over frame direction, size and spacing ❑ Wall Section Detail including: Roof rliY6ope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stJd size and spacing/ sole plate Exterior sheathing size and type Floor ❑ Joist size and spacing Foundation/Wall a'f ncrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with Emil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing indow and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ri 'reeve and valley lines eam and girder size and location 'Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation 0 Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth O Horizontal & vertical reinforcement if any O Reinforcement if any ❑ Active system with 6 mil vapor barrier O Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Spokane #Valleyo Target Date sheet For City Use Only PLUS Project I ^ 3S. o2 Project Address 1)41 { C. MAI(- ,LL 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. j J // Your application review TARGET DATE is i f 10 1 1 The TARGET DATE is the date we estimate your project application will have had its initial technical review. II is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can he changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should he contacted on or by the target date, pleaseJeel free to contact us ifyou haven't heard front us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to,complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantije flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, entail, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 PLANNING DEPT. APPROVED • 0 toi E-- l� o c7 i a o,��o 4.7 o Vi' w Lelta i Q i W SITE PLAN I/ /�STREET, ALLEYORADJOINING LOT (Circle One) I` 1f�'^ 1 r Lot Width E.tI SlRdiff G C 10 &►2'7 2'D Rear—Properly line qi.S1 2410 '3 arc 6 /WAGE Sock. e3, .0,0,- /2. ,a5 Dwelling 13 A -SEM c vT 6 Ap F"Cot't Lori' adMe, Front Property Line 10. Side Property Line 0 • Planting Strip Curb Street Zoning: Commercial ❑ Site Address: Building: 5' SIDEWALKtit SelvertIr This site plan may be used for garages, additions, fences or other structures. Please provide dimensions from existing buildings to property lines, as well as dimensions of all structures, existing and new. Residential. FENCE CERTIFICATE REQUIRED? YES ❑ NO 0 Owner: