Loading...
2001, 04-24 Permit: SW-12001250 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT R Application Number: SW -12001250 Permit Issued Date: 05/01/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: ORCH AVE ADD Permit Type: SEWER Primary Contact: PLAN B ENTERPRISE INC Applicant: PLAN B ENTERPRISE INC Address: 8512 N HARVARD RD NEWMAN LAKE-, WA 99025 Phone: 509-999-7643 Email: SITE INFORMATION: Site Address: 7703 E LIBERTY AVE Parcel Number: 45063.3418 Subdivision: ORCHARD AVENUE Assessor's Description: ORCH AVE ADD PT B68 EXC N193FT & EXC E5OFT Inspection Area: Owner: ROTHWHEILER, ROGER N Address: 7703 E LIBERTY AVE SPOKANE, WA 99212 Phone: Email: Water District: Orchard Fire District: Fire District 1 Avenue Irrigation District #6 Zoning: Land Area: 0.2632 acres / 11466 sqft CONTRACTOR INFORMATION: General Contractor PLANBBE950R8 PLAN B ENTERPRISE INC 8512 N HARVARD RD NEWMAN LAKE-, WA 99025 509-999-7643 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 05/01/2012 12:46:21 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001250 05/01/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/01/2012 12:46:21 Printed by: IIS APPPOOLV SP.NET v4.0