2008, 09-04 Permit App: 08003423 ResidenceProject Number: 08003423 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/4/2008 Page 1 of 3
Project Information: .
Permit Use: NEW SFR -SEWER
Setbacks: Front
Site Information:
Plat Key:
Left: Right- Rear:
Contact: HOMESTEAD CONSTRUCTION
Address: 312 S FARR RD
C - S - Z: SPOKANE WA 99206
Phone: (509) 892-0454
Group Name:
Project Name:
Name: Range
District: East
Parcel Number: 55182.3904
Block:
SiteAddress: 17120 E MAXWELL AVE
Location:: CSV
Lot:
Owner: Name: HOMESTEAD CONSTRUCTION, I
Address: 312 S FARR RD
SPOKANE VALLEY, WA 99206
Zoning: R-4 SF Res Urban District
Water District: 134 CONSOLIDATED ID #19 Hold: ❑
Area: 7,020 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Released By:
Originally Released:
Driveway/Approach
9/4/2008 By: tmelbourn
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
9/4/2008 By: JLMain
Released By:
Sewer Review
Permits:
Originally Released:
9/3/2008 By: mpalaniuk
ReleasedtBy: • -
Originally Released: 8/29/2008 By: JLMain
Operator: jmm Printed By: jmm
Print Date: 9/4/2008
Project Number: 08003423 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/4/2008 Page 2 of 3
Approach
Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION
Address: 312 S FARR RD Phone: (509) 892-0454
SPOKANE, WA 99206
Item Description
APPROACH -CONST IN ROW
Units Unit Desc
1 NUMBER OF
Permit Total Fees:
Building Permit
Fee Amount
$50.00
$50.00
Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION
Address: 312 S FARR RD
SPOKANE, WA 99206
Phone: (509) 892-0454
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB 1,251 $118,832.49 1,251 $118,832.49
BASEMENT U R-3 VB 533 $7,995.00 533 $7,995.00
DECK OPEN R-3 VB 80 $1,200.00 80 $1,200.00
GARAGE U-1 VB 611 $11,609.00 611 $11,609.00
Item Description
RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 2,475 $139,636.49 2,475 $139,636.49
Units Unit Desc
I SELECT
1 SELECT
I SELECT
Permit Total Fees:
Mechanical Permit
Fee Amount
$1,217.75
$4.50
$487.10
$1,709.35
Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION
Address: 312 S FARR RD Phone: (509) 892-0454
SPOKANE, WA 99206
Item Description
GAS WATER HEATER
GAS APPLIANCE<=100,000BTU
VENTILATING FANS
Units Unit Desc
1 NUMBER OF
1 NUMBER OF
4 NUMBER OF
Operator: jmm Printed By: jmm
Fee Amount
$10.00
$12.00
$40.00
Permit Total Fees: $62.00
Print Date: 9/4/2008
Project Number: 08003423 Inv: 1
Application
THIS IS NOT A PERMJT
Penalties will be assessed for commencing work without a permit
Date: 9/4/2008
Contractor: HOMESTEAD CONSTRUCTION
Address: 312 S FARR RD
SPOKANE, WA 99206
Item Description
TOILETS/BIDETS
SINKS
SHOWERS
TUBS
DISH WASHERS
CLOTHES WASHER
FLOOR DRAINS
MISCELLANEOUS FIXTURES
Plumbing Permit
Page 3 of 3
Firm: HOMESTEAD CONSTRUCTION
Phone:
Units Unit Desc
3 NUMBER OF
5 NUMBER OF
I NUMBER OF
2 NUMBER OF
1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
Permit Total Fees:
(509) 892-0454
Fee Amount
$18.00
$30.00
$6.00
$12.00
$6.00
$6.00
$6.00
$6.00
$90.00
Notes:
A 6 -FOOT HIGH SIGHT -OBSCURING FENCE MUST BE INSTALLED AROUND PERIMETER
OF VALLEY COACH ESTATES SUBDIVISION PRIOR TO ANY BUILDING PERMITS -MH
Payment Summary:
Permit Type Fee Amount
Approach $50.00
Building Permit $1,709.35
Mechanical Permit $62.00
Plumbing Permit $90.00
Invoice Amount
$50.00
$1,709.35
$62.00
$90.00
$1,911.35 $1,911.35
Amount Paid
$0.00
$0.00
$0.00
$0.00
Amount Owing
$50.00
$1,709.35
$62.00
$90.00
$0.00 $1,911.35
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 9/4/2008
Spokane
jValley•
Community Development
Residential Construction
Permit Application
Permit Center, QCf,FIVED BY
11703 E Sprague Ave, Suite BS3POKANE VALLEY
Spokane Valley, Wi%1T9206 1
(509)688-0036 FAX: (509000113 20 m
www.spokanevalley.org �v�
PERMIT CFjNTER _
ow—Construction
❑ Addition/Remodel
❑ Other:
PERMIT NUMBER: g - 5L/Z3
PERMIT FEE:
Accessory Bldg
❑ Deck
I—1 120
SITE ADDRESS: — . \\No, �\
ASSESSORS PARCEL NO: LEGAL DESCRIPTION: \\ % \V i V \a•.o. SS C J
Building Owner:
Name:
Coritiactori".
Name:
Address: ‘.es
City:
Phone:
�c:"\%CSR F%or
Address:
State; Ztp—N %
City:
Fax:
,Contact'Person
Name: aC'••
Phone: •>n-. \°cfV
Describe the scope of work in detail:
Phone:
State:
Fax:
Zip:
Contractor Lic No: Exp Date:
City Business Lic. No:
,.\ca��-yc�1q���
Cost of Project: $
\\C�,pao
Proposed Use:
. i...r:re NIA :Fant annlirahla**********************
>rxnxxxxaaa.rx..F 1 ne Ioiiowrng inu J 1 VG waiINaa.w. k............----._—rr----"---.
HEIGHT TO PEAK:
\s1/4
DIMENSIONS:
Ill°t.• 1V
# OF STORIES:
TOTAL HABITABLE SPACE:
\XC 11 H`I
MAIN FLOOR TO SQ.
FTG:
Wi jC 1 Z5 I
2'u FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
3'
S33.
IMPERVIOUS SURFACE
AREA:
'�.®(
FINISHED BASEMENT
SQ. FTG: —'LI
GARAGE Q. FTG ::
I
DEC v Q. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEATSEWER
(vp.
OR SEPTIC?
—1-.ScacM
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
0 Check
DATE: 's•1.9\ O`k
❑ Mastercard 0 VISA
Expires: VIN#:
p®kane
Valley
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague .Ave, Suite B3
Spokane Valley, \VA 99206
Phone: 509.688.0036
New project 0
Previous pre -app meeting 0
Pian revisions 0
Transmittal Date:
Friday, August 29, 2008
Site Address: 17120 E MAXWELL AVE
Parcel Number: 55182.3904
Zoning: R-4
Fire District: FD 01
Project Number: 08003423
Water District: CONSOLIDATED ID #19
Applicant:
e-mail:
Contact:
e-mail:
Contractor:
HOMESTEAD CONSTRUCTION
312 S FARR RD •
SPOKANE WA 99206
(509) 892-0454
HOMESTEAD CONSTRUCTION
312 S FARR RD
SPOKANE WA 99206
(509) 892-0454
OWNER
( ) - 0
Owner: HOMESTEAD CONSTRUCTION, IN
312 S FARR RD
SPOKANE VALLEY, WA 99206
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
°n
o3U[ILDIVKa
Project NEW SFR -SEWER
Description:
Please send all plan review and project comments via e-mail to the
highlighted individuals.
13iiil ng
r
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATION
(4
CONSTRUCTION PLANS
4
1
SITE PLAN
�a ]
Y(k
TDS
Ask
l
\
V
Please send all plan review and project comments via e-mail to the
highlighted individuals.
��o�
Spkane
jValley
n k t1t a.T
For City Use O�nly
PLUS Project Number rC) 3u o2�'
Project Address 11 1 7 e' L Ii\c& xv�¢,i�
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 t permitcenter@spokanevattey.org
As part of our on-going commitment to customer service during the review process ,of, .your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is /S
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
i Submit complete, accurate plans and documents.
Extra time may be required fir re -submittals as project application reviewers work on multiple applications. -and it
may he .several dans before they can look at.your need or revised information?' '
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can he changed, one individual. with the
expertise for dealing with reviewer comments would be the hest choice for the entire review process. .
i Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, p/ease feel free to cornact us if xou haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procechire. you will save time and allow the reviewers to complete the work more expeditiously._
Steps in the Permit Process
I. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved •for deferred
submittal. This does not prevent technical staff from requesting additional information 'as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technicai.staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
conies up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project,. technical staff may include multiple reviewers. You should'be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is.complete.
4. Permit Issuance. When the technical compliance review 'of the application is complete, including any subsequent re-,
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When' all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
i)
Permit Center
Spokane
11703 E Sprague Ave, Suite B-3
s`,�,'' Spokane Valley, WA 99206
® �Clldey. (509)688-0036 FAX: (509)688-0037
www.spokanevallev.org
Community Development
ROW Construction
Permit Application
IA Driveway
❑ Sidewalk ❑ Curb & Gutter
Road Obstruction ❑ No ❑ Yes (traffic control plan required)
PERMIT NUMBER:
PERMIT FEE:
❑ Pavement Cut **(see below)
❑ Other
PROJECT ADDRESS t
START DATE \o'S\-O�
ANTICIPATED COMPLETION DATE 'S- \
Building Owner:
Contractor:
Name: \tel
Address:
City:�o\J,o a.
Phone:' �o\-1._ -fie jam. Fax: o\Z,-...‘.'�t�y
Stated Zrp:okzvys.9
Contact Person CLSr.
Name:
Phone:
°\i— • \fst`t
**MUST BE COMPLETE IF PAVEMENT CUT**
Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Contractor Lic No:
Exp Date:
City Business Lic. No: l��\.,l-N,e.... c S.1go117C+
Tier
Policy
Type of Work
Gas
Electric
Water
CATV
Communications
Sewer
Other
Type of Repair
Asphalt
Concrete
Asphalt
Width Length
X
X
X
Condition of Cut
Sawcut
Grind (pre -approved only)
Existing Road Condition
Depth of Asphalt
Depth of Gravel
Concrete
Width Length
X
X
X
Locate Ticket #
BOND/INSURANCE CERT #
Signature
Method of Payment
0 Cash
Bankcard #:
Authorized Signature:
❑ Check
(PER SVMC TITLE 10 ARTICLE 2)
Date `d •7-9\ O�
❑ Mastercard ❑ VISA
Expires: VIN#:
Work completed satisfactorily Date
(INSPECTOR)
PLEASE FAX TO CITY OF SPOKANE VALLEY UPON COMPLETION (509)688-0037
Effective October 28, 2007
Page 1 of 1
P:\Community DevelopmentWnrms\Building forms\Right of Way Permit App doc
Community Development
Plumbing Permit
SITE ADDRESS:
Pent* Canter
11707E Sprague Ave, Suite 106
Spokane Valley, WA 99206
(509)6880036 FAX (509)688-0037
www.eookanevallev.orccean
Application ❑ Commercial [21 Residential
PERMIT NUMBER:
PERMIT FEB:
AUTHORIZED SIGNATURE:
aevrsm 112905
DESCRIPTION OF WORK
0 OF UNITS
X
Nene:
•
Phone: Fax:
1
TOILETS
x'0111
City State
8800
-
2
.far;3:-F CIZ .2 4r. .-....
�.. -..
Name
1
Phone: Fax:
..
Address
1
City: Stem Zfp:
x
50.00
Iiomm No:
I
City Buemeu Benue No:
BATH, STALL, ON-SITE BUILT
.-.....
yDOdge,. ..
r%.;J"X(:
.k♦`VY.=w¢',r?,.°e.
(t'iY:
.w7,1L.111: r:yy{(.JyKnY ,•J.. ..r.
:.��: L-._ �
;. 1:.•
Name:
-
Phone:
S ,
X
8M00
•
0
DISHWASHER
AUTHORIZED SIGNATURE:
aevrsm 112905
DESCRIPTION OF WORK
0 OF UNITS
X
COST
•
TOTAL AMOUNT
1
TOILETS
WATER CLOSET, BIDETS
X
8800
-
2
URINALS
X
1600
-
3
TUBS
n..
x
50.00
-
4
SHOWERS (PER TRAP)
BATH, STALL, ON-SITE BUILT
\
X
18.00
•
5
SINKS
BAR, FLOOR KITCHEN,
LAUNDRY,
W14DRY,UTILITY. JANITOR PHOTO,
XRAY, FOOO, PREPCUUNARV MEAT
S ,
X
8M00
•
0
DISHWASHER
\
X
18.00
-
7
CLOTHES WASHER
\
X
10.00 •
•
0
GARBAGE DISPOSAL
x
88.00
•
8
WATER SOFTENER
X
10.00
•
10
ELECTmC NOT WATER TANK . •
• .. NOTE; IF GAS. see MECHANICAL
X
10.00
•
11D
N8OVERFLOAI
=47
ARE& CASE, COIL. TRENCH, CONDENSATE
‘
X
10.00
•
12
/OVERFLOW
DRAINS
1
X
*6.00
•
.
13
FOINTANB, DRINKINGI
X
16.00
•
14
WATER PW WGiRAI -IN WASTE,
VENT. PLUMBING. REVERSAL
NSTALLATION. ALTERATION, REPAIR
REVERSALS
X
10.00
•
15
SEWAGEEJECTOR •
GRINDER SUMP PUMP
X
*8.00
-
18
WATER USING DEVICE
ICE AWOR COFFEE MAKER, HOSE BIB,
- STEAMER'3
PROOFER CARBONATOR, SWAMP COOLER
X
10.00
•
'
17
CROSS CONNECTION DEVICE
VACUUM BREAKER CsECK VALVE,
ANDRP.B.P.D. FOR VATS TANKS, BOILERS
X
18,00
•
10
INTERCEPTORS_
GREASE TRAP. aAGWTRAP,
CHEMICAL HOLDING TANK
X
SO00
•
19
MEDICAL GAS Leer oueM}
NITROUS, OXYGEN
X-
18,00
-
20
fiXTl� PLUMING
X
1M00
-
21
PRNATE SEWAGE OISPOSAUSVS
X
120.00
-
INDUSTRIAL WASTE22 INTEFCEPTOR
X
*10.00
•
METHOD OF PAYMENT: -
O CASH 0 CHECK . - 0 VISA 0 MASTERCARD
'.. CardsEXPIRES:
SJSYCIT
�
f tBaJGFEa
178.00
TOTALPERIIW P8! Dat
AUTHORIZED SIGNATURE:
aevrsm 112905
Permit Center
11707 E Sprague Ave, Suite 106
Spokane Valley, WA 99206
PERMIT NUMBER:
Conatamity Developrrm t (509)688-0036 FAX (509)688-0037 PERMIT FEB:
www,aookanevallev.org
Mechanical Permit Application ' - ❑ Commercial 05 Residential
1'I Cz-o
srrE ADDRESS: 21 � t . Cmc , \\
Buadle60*oer \-��.ti �•o \ C. -,.-.lit. ...
Name: Pion: - Fax:
Addreaa: City, State: - Zip:
Coal7oe)nr
Nems Pdme: Fax:
Addtm: City: State: Zip:
License No: • . qty Business ticP30211.0...
. ...1:..;‘#f•.7''.111.4^,,.3,101.44.7'..':_ .. .. .
Name
DESCRIPTION OF WORK ' • -
00• UNITS
X
COST
•
TOTAL AMOUNT
1
FUEL BURNING APPLIANCE
f2p1 bol Nee Own 100,000
\
X
112.00
2
. FUEL BURNING APPLIANCE
Morl then 100,000
X
115.00
•
$
1A4LUSTED APPLIANCE (Additional Fee)'
. Bawl lose lees than 400,000
X
' 550.00
•
4
UNLISTED APPLIANCE (Additkrnd Nosy '
Mo yion 400,000
X '
1100.00
•
5
USED APPLUWCE(WSEC MIn.AFUB SAO)
- 'i EOM b$ Nes than 400,000
..-
X
150.00
•
0
USED APPUANCESWSEC min, AFUE ntnj)
_ ;'' More then 400.000
X
' 5100.00
•
7
BOILER/REFRIGERATION` :', •
1'' 10014 BTU
X
112.00
•
6
BOILER/REFRIGERATION';':'' ". _...
101.•000M BTU
X
$20.00
•
9
BOILER/REFRIGERATION #"': ..
- 901= 1.000M BTU
X
525.00
•
10
BOILER/REFRIGERATION ^'.'+!'. '.' ' '
'` 1.001- 1.750.4 971)
' X
$35,00
•
11
BOILERIREFRIGERATION" : " ' ' • .
Nom ton 1.750M BTU
X
550.00
•
12
GAS LOG, GAS INSERT, GAS FIREPLACE
X
_
. $10.00
•
13
RANGE
X
$10.00
•
14
DRYER
.. •
X
510.00
15
FUEL BURNING WATER HEATER• •
\
X
510.00
•
16
MISC. FUEL BURNING APPLIANCE
X'
$10.00
•
17
GAS PIPING(each outlet)"'P:?:.'v+• ' ..
' X
$1.00
•
16
DUCT SYSTEMS' r '. ''
X
$10.00
3.
19
VENTILATING FANS ',�: :i a.�,r.l,;::-:.:..,..;
� "; �.:. '_
4' ' '
' : X
510.00
•
20
NR HANDLER (DOES NOT Indutl4d iellno ':
' ES10nip Men 10.000 CFM
X
' $12.00
•
21
AIR WWDLER(DOES NOT4i01Ud40u061q),':t«'''GPMSt.
OMn10.003C A
..
':X .
'115.00
•
22
EVAPORATIVE COOLERS": �,,;,';., '..`:,•1.'
'. ..
.. '
:.X ,
.'$10.00
•
23
TYPE I HOOD ..
X
--. 150.00
•
24
TYPE II H000 ' .
• X
510.00
•
25
HEAT PUMP/AIR CONDITIONER' " - • '
OJ TON
X
$12.00
20
• AIR CONDITIONER
3-16 TON
X
$20.00
•
27
AIRCONDITIONER .
' 163070N
X
525.00
•
26
NR CONDITIONER" ,.. ..,.. :.
.:- _ TGN
' X
$35.00
•
0
AIRCONDRIONER:.. -
...=` KMthen 50 TON'
1
-
' X
$00.00
•
30
LPG STORAGE TANK. .. .. . . . . _ -
' X '
110.00
•
31
WOOD OR PELLET STOVE/INSERT:'''',: •
' -..
....
:X-
110.00
•
32
WOOD STOVE - FREE STANDING ' ''
-
X
$25.00
•
33
REPAIR & ADDITIONS
X
$15.00
•
34
VENTILATION SYSTEMS '
X
- 112.00
•
35
VENTILATION MECHANICAL EXHAUST '
X
512.00
•
36
INCINERATOR -RESIDENCE. ' • -
X
$10.00
•
37
INCINERATOR -COMMERCIAL -, •..
' .-
-
X
$22.00
•
METHOD OF PAYMENTt ' :: ...
OCASH '0 CHECK 0 VISA 0 MC ' ' 6XINRHB.
CMD It - V6�
6UOTOTAL
' PROCESOINO PEE
136.00
TOTAL PERMIT FEE DUE:
AIJIHORIZZED SIGNATURE:
•
Oo' v,.\.t-t
\i
R_.
1
PLANNING DEPT. APPROVED
BY: 7/7,41: zja,1„.(Y11--
DATE* IffigPic 71/3/0o8
L : 7 b
c�
SEP 0 3 2008