Loading...
2007, 05-04 Permit: 07001591 ROW, Cross ConnectSpokane Valley BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 I Site Information Project Information Site Address: 17910 E MAXWELL AVE Parcel Number: 55181.4101 Subdivision: Block: Lot: Zoning: UR -3 Urban Residential 3.5 Owner: COLLINS, DENISE D Address: 17910 E MAXWELL AVE SPOKANE VALLEY, WA 99016 Building Inspector: JAY GRISSOM Water Dist: CONSOLIDATED ID #19 Project Number: 07001591 Inv: I Issue Date: 05/04/2007 Permit Use: ROW -LANDSCAPING, 1 CROSS CONNECTION Applicant: HAASE LANDSCAPE, INC 12202 E TIIORPE RD SPOKANE WA 99206 Contact: HAASE LANDSCAPE, INC 12202 E THORPE RD SPOKANE WA 99206 Phone: (509) 926-7950 Phone: (509) 926-7950 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: Permits Plumbing Permit Contractor: HAASE LANDSCAPE, INC License #: HAASEL1042R6 CROSS CONNECTION DEVICE FOR PLUMBING INSPECTIONS CALL (509) 688-0054. $600 Total Permit Fee: $6.00 1 Right of Way Contractor: HAASE LANDSCAPE, INC License #: HAASEL1042R6 ROW - NO CUT OBS NO CLEA 1 $70.00 ROW - TRFC CTRL PLN REV Total Permit Fee: FOR RIGHT OF WAY INSPECTIONS CALL (509) 688-0053 ENGINEERING $50.00 $120.00 Payment Summary Total Fees AmountPaid AmountOwing $126.00 $12600 $0.00 Tran Date Receipt # Payment Amt 05/04/2007 9479 $126.00 Notes / Conditions of Approval The control plan submitted has been approved for concept only. Contractor is responsible for determining specific signing and layout as required by the MUTCD, WSDOT specs, and WA ST mod to the MUTCD All devices shall conform to the MUTCD and WSDOT specs. The contractor shall notify Gay James, PW Admin Assist, by noon on 'Thursday of the week before commencement of road work. Notification must include the location of the work, expected start and end dates, and dates and times of any road closures or delays 3.0Gay can be reached at 688-0171 or gjames spokanevalley.org, and she will notify the newspaper, school districts, Spokane Valley Police department, and fire dispatch as necessary The City of Spokane Valley may request changes as warranted by Traffic conditions and motorist behavior. Processed By: Main, Jodi L Printed By: Main, Jodi L Page 1 of 1 PERMIT NOTICE The ownership of a Spokane Wiley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/pefmittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after an framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this Inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — pnor to placement of concrete/asphalt or, if gravel approach, after completion: In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for eiectncal winng. Stale Department of Labor Permis and inspections fpr Sewer Connection, Spokane County Utilities Divts.on And Industries 324-2640 4773604 Permis and inspections for on-site septic systems. Spokane Regional Fire spnnkler and alarm systems and pnvate access road inspections. Spokane Valley Health Dsine( 324-1560 Fire Department 892-4122 Slate law RCW 19,122 requires that pnor to any excavation the 'CALL BEFORE YOU DIG' center must be notified Call before you dig at least 2 working days in advance. 456-6000 PERMIT EXPIRATION AND REFUNDS All permits shalt expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work Is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under t permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or car�cefle.. ar to th n review being completed /V717 Owner / Agen Date Staff Approval Date