2010, 07-29 Permit App: 10002292 Garage' Project Number: 10002292 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Date: 7/29/2010 Page 1 of 2
Permit Use: 27 X 34 GARAGE Contact: KOCHERGIN, VLADMIR 0 & TATYANA
Address: 18110 E MAXWELL AVE
C - S - Z: SPOKANE VALLEY, WA 99016-9561
Setbacks: Front Left: Right: Rear: Phone: (509) 953-9965
Group Name:
Project Name:
Site Information:
Plat Key: Name: HULETTS ADD District: East
Parcel Number: 55181.4707 Block:
SiteAddress: 18110 E MAXWELL AVE
Location:: CSV
Lot:
Owner: Name: KOCHERGIN, VLADMIR 0 & TAT
Address: 18110 E MAXWELL AVE
SPOKANE VALLEY, WA 99016-956
Zoning: R-3 SF Res District
Water District: 134 CONSOLIDATED ID #19 Hold: ❑
Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Released By:
Septic Sys Review
Originally Released: 7/29/2010 By: tmelbourn
Released By:
Originally Released: 7/29/2010 By: LHALSEY
Landuse/Zoning/HE Conditions
Released By:
Originally Released: 7/29/2010 By: mharnois
Permits:
Operator: jmm Printed By: jmm
Print Date: 7/29/2010
• Project Number: 10001291 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/29/2010 Page 2 of 2
Approach
Contractor: A K Construction & Excavtn Lie Firm: A K Construction & Excavtn Llc
Address: 3320 South Molter Road Phone: (509) 370-5692
LIBERTY LAKE WA 99019
Item Description Units Unit Desc Fee Amount
APPROACH -CONST IN ROW 1 NUMBER OF $52.00
Contractor: OWNER
Permit Total Fees:
Building Permit
$52.00
Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Su Ft Valuation So Ft Valuation
GAR WOOD U-1 VB PLAN 918 $17,442.00 918 $17,442.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Totals: 918 $17,442.00 918 $17,442.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$293.25
$73.31
$4.50
Permit Total Fees: $371.06
Notes:
SAW CUTTING OF EXISTING CURB IS NOT ALLOWED WITHIN THE CITY'S JURISDICTION.
DRIVEWAY IS TO BE INSPECTED BY THE CITY'S ROW INSPECTOR PRIOR TO CONCRETE
PLACEMENT.
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Approach $52.00 552.00 $0.00 552.00
Building Permit $371.06 $371.06 573.31 $297.75
$423.06 5423.06
$73.31 $349.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 7/29/2010
1SlPennit Center
or¶¶�� 11703 E Sprague Ave, Suite B-3
D®ltia➢Ile Spokane Valley, WA_99206�
Valley. 50 0034 -@($Q9038-0037
Community Development O,SV pERh 1 -
Residential Cons ,ruction 30_19 2��
Permit Application
www.swka evallb' :or -2 [R
1;041
Piolect4t
PERMIT NUMBER: /2%97_
PERMIT FEE:
1
3Vew Construction
Addition/Remodel
Other:
Accessory Bldg
Deck
'S141•LtASDDR13SS:ai
/f -X legaw �
ASSESSORS PARCEL NO:
LEGAL DESCRIPTION:
Building Owner:V
Contractor:
d im i g Koch ei2V
Name:
Addres
s OE «U4
o`tySPDt�Q n a
Phone: 5oq q,-3-q9
l
,
X wuete
v� j
4J-Fax:
1 O
inName:
4e
State: yJ_ Zip:7904
TT
Address: is O L U / ,{ _Xeu e
//I /�
State: A Zip: C1�oIb
City: 3poeon e v fr 7
Phone:5aq q� Qbs—Fax:
11
•GARQGEtSQ. FTG
� __ iq 8
Contractor Lic No: Exp Date:
Contact Person
# OF BEDROOMS:
City Business Lic. No:
HEAT SOURCE:
SEWER OR SEPTIC?
Name:
Phone:
Kneserilie-thesscope.of woik in detail: .
CFaraPcoj ar$q c0,
'Piposed_Use 1 -co R
PctR(2%h -a/ CaE
**************The followin:r MUST be complete: (write N/A if not applicable)**********************
gHEIGHTr�T) Fl AK': il, ib _spaiENSIONS:
-vt r
# OF STORIES:
TOTAL HABITABLE SPACE;
MAIN FLOOR TO SQ.
FTG:
2Nu FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
•GARQGEtSQ. FTG
� __ iq 8
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) PI. s or additional information may be required to be submitted, and subsequently approved before
this application can be proc,es--d
Sr iVATURE:—
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
0 Check
4D :E /2 q//
❑ Mastercard ❑ VISA
Expires: VIN#:
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SI7 PLAN
16 Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
❑y ight of way/easement location & sizes
Yd Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing,sizes and locations •
❑ •Perimeter conbrete foundation wall sizes
❑ Crawlspace ventilation • . '
❑ Floor Plan of each level (finished or•unfinished)
o Floor Joist direction, size and spacing
o Header, beam or concrete lintel sizes
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
•❑ Supporting wood.cripple walls.or beams
.❑ Thickened concrete'pads supporting
beams or girder trusses -
: :
'with 'dimensions:
o Window and door location and sizes
o Window well locations if applicable
o Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with Emil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
❑ Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
0 Handrail / Guard height & spacing
Heather Morris
From: Wayne McGavran
Sent: Thursday, July 29, 2010 11:01 AM
To: Permit Center; Scott Wallace
Subject: RE: APPROACH 10 2292
I approved this approach today.
Wayne
From: Jodi Main On Behalf Of Permit Center
Sent: Thursday, July 29, 2010 10:44 AM
To: Permit Center; Scott Wallace; Wayne McGavran
Subject: APPROACH 10 2292
This goes with the garage permit O with the same number
Mardis :7
Jodi Main, (P7
Penult SpectaCiet
11703 e Sprague, 8-3
Spo4ane VaCCay WA 99206
P: 509-720-5319
F: 509.688.0037
1
CfrY OFk
ane
Valley.
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevallev. or°
Community Development
Approach Permit Application
PERMIT NUMBER:
PERMIT FEE:
PROJECT ADDRESS
START DATE
ANTICIPATED COMPLETION DATE
Building Owner: V [QCT / i/Ll& 1 /2 K9 ChiGe5 J 7
Contractor: AK
Name:
ogg /2c L�� roc1
Vin n ('l 16 4 l /2 &'! 04'C5 / ''l V
Address: (�, i( 0E7 ✓t(/4_XLUate- /J(/k
Address:
City: `' ppk)q y e it Lci State: u/74 Zip: WO //,
City:
State:
Zip:
Phone: 5-0q el s---3 ? fir Fax:
Phone:
Fax:
Contact Person
Contractor Lic No:
Exp Date:
Name:
City Business Lic. No:
Phone:
PROJEC1 DESCRIPTION (Provide site sketch)
Residential Driveway
Existing Curb & Gutter
Culvert Installation
Other Conditions
Commercial/Industrial Driveway
Rural Road Section
Sidewalk Repair/Construction
Bond/Insurance certification must be on file with the city.
DISCLAIMER
The permittee verifies, acknowledges and agrees by their signatures that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in
full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane
Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws,
codes or ordinances. 6) Plans or acj4itional information may be requited to be submitted, and subsequently approved before this
application can he processed.
Signature
Date /G—//0
Method afPayment:
0 Cash ❑ Check 9 Mastercard 0 VISA '
Bankcard #: Expires: VIN#:
Authorized Signature:
REVISED awne
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and Include street name.
Check all existing conditions that apply:
❑ Sidewalk
ft wide
_ ft from back of curb
❑ Streetside Swale
❑ Drainage Ditch
❑ Drywell (show location on sketch)
O Other (please describe below)
DISTANCE FROM
NEA EST PROPERTY UNE
Y BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
CONCRETE
APPROACH
7RCETURN
CURB
I-4'---THROATWIDTH IDE FT 41
WINO (SEE TABLE)- WINO �IF CORNER LOT,
DISTANCE FROM
STREET NAMERETURN
UIIFT (SEE TABLE)
EDOE OF
ASPHALT
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
VA/ BE LEFT OR RIGHT SIDE)
—ICI Et(SEETABLE)—
ASPHAET
APPROACH
^THROATWIDTH - FT ---{
(SEE TAB
RADIUS
RETURN
ST
BYRE T WITH ASPHALT EDGE
\I I CORNER LOT,
DISTANCE FROM
RADIUS RETURN
JET (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches
Commercial Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured
from centerline to centerline of each
approach)
None specified
See Page 7-27
In City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line
(@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'
Spokane
Valley®
For City Use Only
PLUS Project Number /t- 22_92 -
Project Address 12)11c -if l7' b fair
it
11703 E Sprague Ave Suite 8-3 • Spokane Valley WA 99206 '
509.688.0036 • Fax: 509.688.0037 •.p ermitcenter®spokanevalley.org
As part of our on-going commitment to customer .service during the. review process, of :your. project
application; we are providing you_with.a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date:.
•
Your application review TARGET DATE is
The TARGET DATE is the date we estimate'your. project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
i Submit complete, accurate plans and documents. , :
Extra time may be required for ge-submittals as project application reviewers work gn.nudtiple applications and i1
'nay be several days before they can look at your new or revised information. ,
i Designate a specific contact person to communicate with,the City. •
While the person designated as the applicant's contact person with the City can be changed,, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
i Call staff regarding the status of your project'only after the target date shown at the top of the page., • '
Although von should be contacted on or'hy the target date, please Jee/ f'eeio contact us"ifjou' haven't hea7'd from us
by your target date. Staff may contact you before the tat -get dale if the initial.revuew is complete. By following this
procedure; you.will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process:
1. Counter Complete. Your application has been accepted as counter, complete: This means alf' of: the. required
documents, as indicated on your Pre -Application Checklist have been submitted: or, have • been ;approved for. deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is" reviewable and free
from substantive Claws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review'queue until it
comes up for review. .
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff,for.compliance
review. Depending on the type of project, technical staff may includemuttiple,reviewers.' You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application' is complete, including any subsequent re -
submittals. each reviewer will approve their section of the application and route it to the Permit •Ccbter. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE APPLICANT PINK—BUILDING FILE
REV 9/07
.a4
Ga Rage -
27'
1 - °:2-
r
:2 -
k �.
23 17,
.
Re2idcnc
36,
A
Seprac Tav►r)
1 QRct»i
Locat
Eton
1
i
18110 E ✓ m -t w eet 4-ve
Spore
�` alley
Development Engineering
11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206
509.921.1000 • Fax: 509.921.1008 • cityhall@spokanevalley.org
Approach Permit Application Review
TO: Building Department
Site Address: 18110 E. Maxwell Ave.
Project No: 10-2292
Reviewed By: /J4ce
Date:
Accepted
Not Accepted
Approach
X
Building Location
Paved Access
Notes: Saw cutting of existing curb is not allowed within the City's
jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior
to concrete placement.
Reviewed By: /J4ce
Date: