Loading...
2010, 07-29 Permit App: 10002292 Garage' Project Number: 10002292 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Date: 7/29/2010 Page 1 of 2 Permit Use: 27 X 34 GARAGE Contact: KOCHERGIN, VLADMIR 0 & TATYANA Address: 18110 E MAXWELL AVE C - S - Z: SPOKANE VALLEY, WA 99016-9561 Setbacks: Front Left: Right: Rear: Phone: (509) 953-9965 Group Name: Project Name: Site Information: Plat Key: Name: HULETTS ADD District: East Parcel Number: 55181.4707 Block: SiteAddress: 18110 E MAXWELL AVE Location:: CSV Lot: Owner: Name: KOCHERGIN, VLADMIR 0 & TAT Address: 18110 E MAXWELL AVE SPOKANE VALLEY, WA 99016-956 Zoning: R-3 SF Res District Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Septic Sys Review Originally Released: 7/29/2010 By: tmelbourn Released By: Originally Released: 7/29/2010 By: LHALSEY Landuse/Zoning/HE Conditions Released By: Originally Released: 7/29/2010 By: mharnois Permits: Operator: jmm Printed By: jmm Print Date: 7/29/2010 • Project Number: 10001291 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/29/2010 Page 2 of 2 Approach Contractor: A K Construction & Excavtn Lie Firm: A K Construction & Excavtn Llc Address: 3320 South Molter Road Phone: (509) 370-5692 LIBERTY LAKE WA 99019 Item Description Units Unit Desc Fee Amount APPROACH -CONST IN ROW 1 NUMBER OF $52.00 Contractor: OWNER Permit Total Fees: Building Permit $52.00 Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Su Ft Valuation So Ft Valuation GAR WOOD U-1 VB PLAN 918 $17,442.00 918 $17,442.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 918 $17,442.00 918 $17,442.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Fee Amount $293.25 $73.31 $4.50 Permit Total Fees: $371.06 Notes: SAW CUTTING OF EXISTING CURB IS NOT ALLOWED WITHIN THE CITY'S JURISDICTION. DRIVEWAY IS TO BE INSPECTED BY THE CITY'S ROW INSPECTOR PRIOR TO CONCRETE PLACEMENT. Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Approach $52.00 552.00 $0.00 552.00 Building Permit $371.06 $371.06 573.31 $297.75 $423.06 5423.06 $73.31 $349.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 7/29/2010 1SlPennit Center or¶¶�� 11703 E Sprague Ave, Suite B-3 D®ltia➢Ile Spokane Valley, WA_99206� Valley. 50 0034 -@($Q9038-0037 Community Development O,SV pERh 1 - Residential Cons ,ruction 30_19 2�� Permit Application www.swka evallb' :or -2 [R 1;041 Piolect4t PERMIT NUMBER: /2%97_ PERMIT FEE: 1 3Vew Construction Addition/Remodel Other: Accessory Bldg Deck 'S141•LtASDDR13SS:ai /f -X legaw � ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner:V Contractor: d im i g Koch ei2V Name: Addres s OE «U4 o`tySPDt�Q n a Phone: 5oq q,-3-q9 l , X wuete v� j 4J-Fax: 1 O inName: 4e State: yJ_ Zip:7904 TT Address: is O L U / ,{ _Xeu e //I /� State: A Zip: C1�oIb City: 3poeon e v fr 7 Phone:5aq q� Qbs—Fax: 11 •GARQGEtSQ. FTG � __ iq 8 Contractor Lic No: Exp Date: Contact Person # OF BEDROOMS: City Business Lic. No: HEAT SOURCE: SEWER OR SEPTIC? Name: Phone: Kneserilie-thesscope.of woik in detail: . CFaraPcoj ar$q c0, 'Piposed_Use 1 -co R PctR(2%h -a/ CaE **************The followin:r MUST be complete: (write N/A if not applicable)********************** gHEIGHTr�T) Fl AK': il, ib _spaiENSIONS: -vt r # OF STORIES: TOTAL HABITABLE SPACE; MAIN FLOOR TO SQ. FTG: 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: •GARQGEtSQ. FTG � __ iq 8 DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) PI. s or additional information may be required to be submitted, and subsequently approved before this application can be proc,es--d Sr iVATURE:— Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 0 Check 4D :E /2 q// ❑ Mastercard ❑ VISA Expires: VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SI7 PLAN 16 Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings ❑y ight of way/easement location & sizes Yd Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing,sizes and locations • ❑ •Perimeter conbrete foundation wall sizes ❑ Crawlspace ventilation • . ' ❑ Floor Plan of each level (finished or•unfinished) o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations •❑ Supporting wood.cripple walls.or beams .❑ Thickened concrete'pads supporting beams or girder trusses - : : 'with 'dimensions: o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with Emil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any ❑ Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations 0 Handrail / Guard height & spacing Heather Morris From: Wayne McGavran Sent: Thursday, July 29, 2010 11:01 AM To: Permit Center; Scott Wallace Subject: RE: APPROACH 10 2292 I approved this approach today. Wayne From: Jodi Main On Behalf Of Permit Center Sent: Thursday, July 29, 2010 10:44 AM To: Permit Center; Scott Wallace; Wayne McGavran Subject: APPROACH 10 2292 This goes with the garage permit O with the same number Mardis :7 Jodi Main, (P7 Penult SpectaCiet 11703 e Sprague, 8-3 Spo4ane VaCCay WA 99206 P: 509-720-5319 F: 509.688.0037 1 CfrY OFk ane Valley. Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevallev. or° Community Development Approach Permit Application PERMIT NUMBER: PERMIT FEE: PROJECT ADDRESS START DATE ANTICIPATED COMPLETION DATE Building Owner: V [QCT / i/Ll& 1 /2 K9 ChiGe5 J 7 Contractor: AK Name: ogg /2c L�� roc1 Vin n ('l 16 4 l /2 &'! 04'C5 / ''l V Address: (�, i( 0E7 ✓t(/4_XLUate- /J(/k Address: City: `' ppk)q y e it Lci State: u/74 Zip: WO //, City: State: Zip: Phone: 5-0q el s---3 ? fir Fax: Phone: Fax: Contact Person Contractor Lic No: Exp Date: Name: City Business Lic. No: Phone: PROJEC1 DESCRIPTION (Provide site sketch) Residential Driveway Existing Curb & Gutter Culvert Installation Other Conditions Commercial/Industrial Driveway Rural Road Section Sidewalk Repair/Construction Bond/Insurance certification must be on file with the city. DISCLAIMER The permittee verifies, acknowledges and agrees by their signatures that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or acj4itional information may be requited to be submitted, and subsequently approved before this application can he processed. Signature Date /G—//0 Method afPayment: 0 Cash ❑ Check 9 Mastercard 0 VISA ' Bankcard #: Expires: VIN#: Authorized Signature: REVISED awne APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and Include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide _ ft from back of curb ❑ Streetside Swale ❑ Drainage Ditch ❑ Drywell (show location on sketch) O Other (please describe below) DISTANCE FROM NEA EST PROPERTY UNE Y BE LEFT OR RIGHT SIDE) FT (SEE TABLE) CONCRETE APPROACH 7RCETURN CURB I-4'---THROATWIDTH IDE FT 41 WINO (SEE TABLE)- WINO �IF CORNER LOT, DISTANCE FROM STREET NAMERETURN UIIFT (SEE TABLE) EDOE OF ASPHALT STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE VA/ BE LEFT OR RIGHT SIDE) —ICI Et(SEETABLE)— ASPHAET APPROACH ^THROATWIDTH - FT ---{ (SEE TAB RADIUS RETURN ST BYRE T WITH ASPHALT EDGE \I I CORNER LOT, DISTANCE FROM RADIUS RETURN JET (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 In City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' Spokane Valley® For City Use Only PLUS Project Number /t- 22_92 - Project Address 12)11c -if l7' b fair it 11703 E Sprague Ave Suite 8-3 • Spokane Valley WA 99206 ' 509.688.0036 • Fax: 509.688.0037 •.p ermitcenter®spokanevalley.org As part of our on-going commitment to customer .service during the. review process, of :your. project application; we are providing you_with.a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date:. • Your application review TARGET DATE is The TARGET DATE is the date we estimate'your. project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review i Submit complete, accurate plans and documents. , : Extra time may be required for ge-submittals as project application reviewers work gn.nudtiple applications and i1 'nay be several days before they can look at your new or revised information. , i Designate a specific contact person to communicate with,the City. • While the person designated as the applicant's contact person with the City can be changed,, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. i Call staff regarding the status of your project'only after the target date shown at the top of the page., • ' Although von should be contacted on or'hy the target date, please Jee/ f'eeio contact us"ifjou' haven't hea7'd from us by your target date. Staff may contact you before the tat -get dale if the initial.revuew is complete. By following this procedure; you.will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process: 1. Counter Complete. Your application has been accepted as counter, complete: This means alf' of: the. required documents, as indicated on your Pre -Application Checklist have been submitted: or, have • been ;approved for. deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is" reviewable and free from substantive Claws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review'queue until it comes up for review. . 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff,for.compliance review. Depending on the type of project, technical staff may includemuttiple,reviewers.' You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application' is complete, including any subsequent re - submittals. each reviewer will approve their section of the application and route it to the Permit •Ccbter. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE APPLICANT PINK—BUILDING FILE REV 9/07 .a4 Ga Rage - 27' 1 - °:2- r :2 - k �. 23 17, . Re2idcnc 36, A Seprac Tav►r) 1 QRct»i Locat Eton 1 i 18110 E ✓ m -t w eet 4-ve Spore �` alley Development Engineering 11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206 509.921.1000 • Fax: 509.921.1008 • cityhall@spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 18110 E. Maxwell Ave. Project No: 10-2292 Reviewed By: /J4ce Date: Accepted Not Accepted Approach X Building Location Paved Access Notes: Saw cutting of existing curb is not allowed within the City's jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior to concrete placement. Reviewed By: /J4ce Date: