Loading...
2009, 09-14 Permit App: 09002810 GarageProject Number: 09002810 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: NEW 24 X 24 GARAGE Contact: ALL FLOORS LLC Address: 18116 E MAXWELL C - S - Z: SPOKANE VALLEY WA 99016 Setbacks: Front Left: Right: Rear: Phone: (509) 844-7462 Group Name: Site Information: Project Name: Date: 9/14/2009 Page 1 of 2 Plat Key: Name: Range District: East Parcel Number: 55181.4705 Block: Lot: SiteAddress: 18120 E MAXWELL AVE Location:: CSV Owner: Name: IBARRA, ALEXA M Address: 18120 E MAXWELL AVE SPOKANE VALLEY, WA 99016 Zoning: R-3 SF Res District Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: 13,115 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information • Review Building Plan Review Released By: Originally Released: Septic Sys Review 9/3/2009 By: tmelbourn Released By: Originally Released: 9/14/2009 By: LHALSEY Landuse/Zoning/HE Conditions Released By: Originally Released: 9/9/2009 By: kkendall Permits• Operator: jmm Printed By: jmm Print Date: 9/14/2009 Project Number: 09002810 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/14/2009 Page 2 of 2 Contractor: ALL FLOORS LLC Address: 18116 E MAXWELL SPOKANE VALLEY WA 99016 Description Grp Type Notes GARAGE IJ -1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Building Permit Firm: ALL FLOORS LLC Phone: (509) 844-7462 This Application: Total Project: Sq Ft Valuation Sq Ft Valuation 576 $10,944.00 576 $10,944.00 Totals: 576 $10,944.00 576 $10,944.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $195.25 $48.81 $4.50 $248.56 Notes: Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $248.56 $248.56 $248.56 $248.56 Amount Paid $48.81 Amount Owing $199.75 $48.81 $199.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 9/14/2009 Spokane valley Community Development Permit Center 11703 E Sprague Ave, Suit -3 Spokane �Vt_alley;.V�rA�� ..// (509)688.1 Ot13AJCc,1{i0$���037 w«1C*I ikQtevallev.oig 7na9 SEP oN Residential Construe o t CENTER Permit Application By: SITE ADDRESS: /8 /2 0 I PERMIT NUMBER: -/ —4) 0 PERMIT FEE: New Construction n Accessory Bldg Addition/Remodel n Deck Other: 7'o/G ASSESSORS PARCEL NO: LEGAL DESCRIPTION: r ._.:.,r.,+.zfticta`,,�[';•+__�_ ''Buildin_ 'Owner: __ _ S ..,F t f '� .c '�.:. pr, -t e .. �.dqq,/"Vt ._�.�n. .th'e�i� '-' 'Contractor:s-;';?_i...,�r:.,s,:,-r':,x*`.:r�cr.<.=--,`.£-`^.vs'vG,":2ic�� . yk c M1- /^;i .%:.i—GKl.✓r.�C:i/r.-re ../.. a a.-_ Name: �// ic/UOV'S 6 L rr 4'- t.. -.' .it 4� ,Ml -Y--� ... J[�i.5� C Name: 7,...:1(a2 -2e:/ ,�f {/�/�'- -s t..k Address: /,fe7 % % a GCr A(4,A.." //'t � L. Address: /d// L r , ag 6_,,,,p// cove t� City: 5 c,, ne l/p/%. State: L(,./ Zip: "CS I City:S pa 6-,1 ,V Li State: 61/ , Zip: �fnoXi Phone: Qa/_77,5".....t Fax: !! Phone: 509 age(_? z Fax: DECK/COV. PATIO SQ. FTG: , E p`gt ,3210Fcia.& Contractor LicNo:,Q/1-/_,rs # OF BEDROOMS: � L (ContactPer§aii7 :` :,a. 4 : ';i; `s; `; :' `,; _ ' r',?. ^ .t.. ' SEWER OR SEPTIC? City Business Lic. No: (6OC)%�� 1 2 Name: ",» (567"/ ?3�/'/-7MI62 Phone: / Describe the scope f work in detail: /3 tie lc� dela1 vh Crruc5-e ov fat , C st of Project: $ 2_ 6 /6 d me/kei/�, Proposed Use: **************The followinw MUST be complete: (write N/A if not applicable)********************** i.lEIGHT TO PEAK: DIMENSIONS: 210'2 q # OF STORIES: TOTAL HABITABLE SPACE: AIN FLOOR TO SQ. FTG: 2"D FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: OK % 5 7 G DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: �,P CONSTRUCTION TYPE. HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2115107 ❑ Check DATE: ❑ Mastercard Al VISA Expires: VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: //(U4/?ea/ Mak2P F Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN Ei Property lines and dimensions cqq Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing ❑ Window and door location and sizes o Header, beam or concrete lintel sizes ❑ Window well locations if applicable o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Spokane Valley® "� : .i,: ,' p a�"'a 1•., os.. �n :v"'- FJa.N For City Use Only PLUS Project -Number 97c2(3/0 Project Address /s 2 o r net -g-.4.4 11703 E Sprague Ave Suite B-3 • Spokane Valley. WA 99206 . 509.688.0036 • Fax: 509.688.0037 4 permitcenter®spokanevatley.org As part of our on=going commitment to customer: service -.during 'the. reviewprocess. of your, project application, we are providing you with a TARGET DATE for the initial technical,application review: If for any reason we cannot meet this date, we will contact -you with a revised target'date. ' Your application reviewTARGET DATE is 9"/3 /n� The TARGET DATE is the date we 'estimate your project application '.will 'have. had its initial rtechnical review. It is not the date for approval or permit issuance. - - Tips for a Smoother Project Application Review i Submit complete, accurate plans and documents. E.rtt•atime may be,required,for re -submittals as project application reviewers work on multiple applications and it may be seYeral'days before they can look at your 11' en/ or revised information.." ' Designate a specific contact person to communicate with the City. • While the person designated as the applicant's contact person with the City cati.be changed, one individual with the expertise for dealing with reviewer comments would be the best'choice.fo» the entire'review process. " r Call staff regarding the status of your project only after the target date, shown,atthe top of the page.. •• Although von should be contacted -on or by the target date, please feel free,to',contact ns ifvou haven't heard froth hs. • • by your target date. Staff Mai; contact you before the 1a,get"date' if the initial review is complete. Bv%ollowing this procedure, von will save time and allow the revieivers to complete the work more expeditiously. Steps in the Permit Process I. Counter Complete. Your application has been accepted as counter complete. This "means all of the required documents, as indicated on your Pre -Application Checklist,have been submitted. or have been approved. for deferred' submittal. This does,not prevent technical staff from requesting additional information as•a result of their technical review. 2. Quality Check."The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical' staff from completing the, technical review once it is started: When this step is complete, your application will be: routed to the appropriate staff,and remain in their review queue until it comes up for review. •• 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of:project, technical staff may include multiple reviewers. - You should be,contacted by phone, fax, email, or mail by.your TARGET DATE once the initial technical compliance. review. is complete. 4. Permit issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals. each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the, person specified on your application for permit pick-up. Information regarding fee and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. ' WHITE -APPLICANT PINK- BUILDING FILE - REV 9/07 t RECEVED L'33' OKANIEVJAU.P1 DEPi'•.;iiiJ':EP•iT (1F CGLMMUiviF! L".' -! U"': .NT 9� PLANNING DE. BY: `VED /$92045 te)cenvi# 5/X7/47/9e 4. 14 99,`&