Loading...
2012, 03-29 Permit: SW-12001016 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12-001016 Permit Issued Date: 03/29/2012 Expiration Date: 03/30/2012 Project Description: NEW SEWER CONNECTION Primary Contact: LOTS N LAND LLC Applicant: LOTS N LAND LLC Permit Type: SEWER Address: 122 N RAYMOND RD STE 3 SPOKANE, WA 99206 Phone: Email: SITE INFORMATION: Site Address: Parcel Number: 5128 N MAYHEW 46344.1701 Subdivision: Assessor's Description: UNKNOWN Inspection Area: Owner: LOTS N LAND LLC Address: 122 N RAYMOND RD STE 3 SPOKANE, WA 99206 Phone: Email: Water District: Spokane Fire District: City of Spokane County Water District #3 Zoning: Land Area: 0.2327 acres / 10138 sqft CONTRACTOR INFORMATION: General Contractor FOLSOM EXCAVATING INC 16701 E VALLEYWAY AVE VERADALE, WA 99037 509-891-1232 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 03/29/2012 14:56:42 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12-001016 03/29/2012 Expiration Date: 03/30/2012 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 03/29/2012 14:56:42 Printed by: IIS APPPOOL\ASP.NET v4.0