2012, 05-24 Permit: SW-12001422 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001422
Permit Issued Date:
05/24/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
ROTH ADDITION
SEWER
Primary Contact:
Applicant:
Address:
Phone:
Email:
FOLSOM EXCAVATING
FOLSOM EXCAVATING
16701 E VALLEYWAY
VERADALE, WA 99037
(509)979-6002
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
5230 N MAYHEW RD
46344.1603
PLAT NO 4 OF WEST
FARMS IRRIGATED
TRACTS
ROTH ADDITION, PHASE 1: LOT 3 BLK 1
6055341 - PTN SE1/4 34-26-44)
(AFN
Owner:
Address:
Phone:
Email:
LOTS N LAND
210 N UNIVERSITY RD STE 300
SPOKANE VALLEY, WA 99206
Water District: Trentwood Fire District: Fire District 1
Irrigation District #3
Land Area: 0.191 acres / 8320 sgft
CONTRACTOR INFORMATION:
General Contractor
FOLSOE1994DO
FOLSOM EXCAVATING INC
16701 E VALLEYWAY AVE
VERADALE, WA 99037
509-891-1232
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 05/24/2012 14:10:31
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
• Permit Issued Date:
Application Number: SW -12001422 05/24/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 05/24/2012 14:10:31
Printed by: IIS APPPOOL\ASP.NET v4.0