APPROACH PERMIT APPLICATION
PROJECT ADDRESS:_ 2 3
START DATE: J (Jf NTICIPATED COMPLETION„� v/
DATE: 1
L
BUILDING OWNER NAME: L, A-- /d
. -7e (-LC
MAILING ADDRESS:
Z7.7 / £%y///,r
Cm:
CONTACT PERSON NAME:
STATE: ail'
ZIP: 9.--.**2c=0)04'
PHONE: 5E9 -1=d0 7 'G FAX: 9 22 - 0 / pS_ CELL:
CONTRACTOR NAME: Jf& q 742)0/0&-7
-j
MAILING ADDRESS: / ” 3
CITY: 5/2` / G6`/c(�j STATE: L� ZIP: <
PHONE: //��_J D f „V / FAX: 022 " O / 9.3" CELL:
CONTRACTOR LICENSE #: / V )V) /'!tI /J/ JEXPIRES: ?-1? y2 CITY BUSINESS LICENSE #:
PROJECT DESCRIPTION (Please Provide Site Sketch)
Residential Driveway Q Commercial/Industrial Driveway
Existing Curb & Gutter Q Rural Road Section
Culvert Installation ❑ Sidewalk Repair/Construction
Other Conditions:
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling Is/will be
served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property owner or
has permission to represent the property owner In this transaction. 4) All construction Is to be done In full compliance with the City of Spokane Valley
Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not
a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Pians or additional information may be required to be
submitted and subsequently approved before this applic, •n can be processed.
Signature
P:\Community Development\11 FormsW. Building\Permit Center\Approach Permit 2-24-11.doc
Date: S � _ / 2---
Page 1 of 2
• •
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
lSidewalk
ft wide
ft from back of curb
L9Streetside Swale
r Drainage Ditch
Drywell (show location on sketch)
00ther (please describe below)
W
z'
w
d,
CCI
CLi
CURB
1
w
z L
W •
0CCf
dl
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
CONCRETE
APPROACH
4'-—THROATWIDTH=FT 4' -I•
WING (SEE TABLE) WING
STREET NAM E
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
NIF CORNER LOT,
DISTANCE FROM
CURB RETURN
n FT (SEE TABLE)
CURB
RETURN
RADIUS
RETURN
EDGE OF
ASPHALT
1—THROAT WIDTH1-1 FT ----I
(SEE TABLE)
STREET NAM E
k -I
NIF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
0 FT (SEE TABLE)
STREET WITH ASPHALT EDGE
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
P:\Community Development\11 Forms\A. Building\Permit CentenApproach Permit 2-24-11.doc
Page 2 of 2
Residential
Approaches
Commercial
Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured from centerline to
centerline of each approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line (@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'
P:\Community Development\11 Forms\A. Building\Permit CentenApproach Permit 2-24-11.doc