Loading...
2012, 05-25 Permit App: APR-2012-0026 ApproachdjValley. • Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-5240 Fax: (509) 688-0037 permitcentersookaneva Ilev.orq APPROACH PERMIT APPLICATION PROJECT ADDRESS:_ 2 3 START DATE: J (Jf NTICIPATED COMPLETION„� v/ DATE: 1 L BUILDING OWNER NAME: L, A-- /d . -7e (-LC MAILING ADDRESS: Z7.7 / £%y///,r Cm: CONTACT PERSON NAME: STATE: ail' ZIP: 9.--.**2c=0)04' PHONE: 5E9 -1=d0 7 'G FAX: 9 22 - 0 / pS_ CELL: CONTRACTOR NAME: Jf& q 742)0/0&-7 -j MAILING ADDRESS: / ” 3 CITY: 5/2` / G6`/c(�j STATE: L� ZIP: < PHONE: //��_J D f „V / FAX: 022 " O / 9.3" CELL: CONTRACTOR LICENSE #: / V )V) /'!tI /J/ JEXPIRES: ?-1? y2 CITY BUSINESS LICENSE #: PROJECT DESCRIPTION (Please Provide Site Sketch) Residential Driveway Q Commercial/Industrial Driveway Existing Curb & Gutter Q Rural Road Section Culvert Installation ❑ Sidewalk Repair/Construction Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling Is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner In this transaction. 4) All construction Is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Pians or additional information may be required to be submitted and subsequently approved before this applic, •n can be processed. Signature P:\Community Development\11 FormsW. Building\Permit Center\Approach Permit 2-24-11.doc Date: S � _ / 2--- Page 1 of 2 • • APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: lSidewalk ft wide ft from back of curb L9Streetside Swale r Drainage Ditch Drywell (show location on sketch) 00ther (please describe below) W z' w d, CCI CLi CURB 1 w z L W • 0CCf dl DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) CONCRETE APPROACH 4'-—THROATWIDTH=FT 4' -I• WING (SEE TABLE) WING STREET NAM E STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) ASPHALT APPROACH NIF CORNER LOT, DISTANCE FROM CURB RETURN n FT (SEE TABLE) CURB RETURN RADIUS RETURN EDGE OF ASPHALT 1—THROAT WIDTH1-1 FT ----I (SEE TABLE) STREET NAM E k -I NIF CORNER LOT, DISTANCE FROM RADIUS RETURN 0 FT (SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. P:\Community Development\11 Forms\A. Building\Permit CentenApproach Permit 2-24-11.doc Page 2 of 2 Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' P:\Community Development\11 Forms\A. Building\Permit CentenApproach Permit 2-24-11.doc Page 2 of 2