2012, 12-12 Permit: SW-12002613 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002613
Permit Issued Date:
12/12/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
WEST FARMS
SEWER
Primary Contact:
Applicant:
Address:
Phone:
Email:
LARRY MILLER EXCAVATING
LARRY MILLER EXCAVATING
7117 E RUTTER AVE
SPOKANE, WA 99212
509-218-3335
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
5404 N MAYHEW RD
46344.0106
PLAT NO 4 OF WEST
FARMS IRRIGATED
TRACTS
WEST FARMS IRR TR PLAT 4 N8OFT OF
S467.70FT OF W147FT TR 105 EXC W10FT FOR
RD
Owner:
Address:
Phone:
Email:
THOMPSON, D R
5404 N MAYHEW RD
SPOKANE, WA 99216-1410
Water District: Trentwood Fire District: Spokane Valley Fire
Irrigation District #3
Land Area: 11760 Square Feet
CONTRACTOR INFORMATION:
General Contractor
LARRYME918DR
LARRY MILLER EXCAVATING
7117 E RUTTER AVE
SPOKANE, WA 99212
509-218-3335
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1
$125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Date Printed: 12/12/2012 12:22:57
Printed by: IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002613 12/12/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 12/12/2012 12:22:57 Printed by: IIS APPPOOL\SmartGovProdApp